HomeMy WebLinkAbout2.c. Pavement Management Program Update4ROSEMOUNTEXECUTIVE SUMMARY CITY COUNCIL City Council Work Session: August 11, 2010 AGENDA ITEM: Pavement Management Program Update AGE DA SECTION: PREPARED BY: Andrew J. Brotzler, P.E., Director of AGENDA NO. Public Works / City Engineer ATTACHMENTS: Overall Condition Index (OCI) Map APPROVED BY: RECOMMENDED ACTION: Discussion BACKGROUND In 2003, the city initiated the development of a pavement management program with the purpose to manage and extend the pavement life of city streets, thereby enhancing performance on a system -wide basis in a cost- effective and efficient manner. The goal of the pavement management program is to provide the city with an effective tool to monitor and maintain city streets at a pre - determined level. As a tool, the pavement management program helps to predict the necessary funding levels and timing for the investment of resources to maximize the pavement lifecycle. Prior to the development of pavement management programs, many community approaches to the maintenance (if the street system was limited to crack sealing, seal coating, and localized patching as determined necessary. With these practices, communities may experience a pavement life of 20 to 30 years. During last year's review of the Pavement Management Program, a projected funding scenario was presented to maintain an average Overall Condition Index (OQ) of 77.4, this being the overall 2009 OCI for the city street network. Based on the information presented last year and this strategy, an updated capital improvement plan has been developed. Figure I shows the projected average network OCI for a variety of funding scenarios including the current proposal of $;700,000 per year in the Street Capital Improvement Fund. Figure 1 Improved Network OCI 90 i 85 Maintain OCI = 77.5 80 . + $700K Budget U . _;--� —,. _• _ • _.��_ .�, -f $800K Budget O *- $900K Budget 7` w 0 3� E5 oo M _ Q N _ OOQ N N N N N N F, O O O O O O O O O O O O O O O O O O O O N N N N N N N N N N N N N N N N N N N N Year Figure 2 shows the required annual Street Capital Improvement Fund amount necessary to maintain an average network OCS of 77.5. Figure 2 Required Annual Budget $2,500 _ $2,000 Y $1,500 - - -- --- -•- Maintain OCI = 77.5 ■ $700K Budget Im -+- $800K Budget $1,000 , . -$900K Budget G , Q $500 — $0 N M 7 U2 (2 h V O N O N N f"/ N N N N N N N N N M O O O O O O O O O O O O O O O O O O O O N N N N N N N N N N N N N N N N N N N N Year gApavement management \2010 pmp \081110.ccws.pmpmemo.docx 2 Based on this proposed strategy, the project areas proposed for 2011- 2016 are shown on Figure 3. i 3 9 Legend: N 2011 Mill & Overlay 2011 Rehabilitation N 2012 Mill & Overlay •!►2012 Reconstruction "2013 Mill & Overlay N 2014/2016 Mill & Overlay Should Council support the proposed project plan for 2011 and beyond, it is proposed to prepare a multi- year feasibility report for the next 3 years. The primary advantage to developing a multi -year report is the ability to inform and engage property owners of proposed projects through neighborhood informational meetings further in advance. With this concept, each successive year's feasibility report would update the program to add the 3' year's project. This would work towards providing notice of projects 3 years in advance of an improvement project. CONCLUSION Staff will provide an overview of the pavement management program. Should Council 1) support funding the pavement management program at $700,000 in 2011, and 2) support the proposed 2011 improvement area, the $700,000 Street CIP levy for 2011 will be maintained and staff will prepare a Council item to initiate the 2011 -2013 Street Improvement Project. gApavement management \2010 pmp \081110.ccws.pmpmemo.d0cx 3 i -J - -�- -- -- -- i J � J ZLIA`( l 9 Legend: N 2011 Mill & Overlay 2011 Rehabilitation N 2012 Mill & Overlay •!►2012 Reconstruction "2013 Mill & Overlay N 2014/2016 Mill & Overlay Should Council support the proposed project plan for 2011 and beyond, it is proposed to prepare a multi- year feasibility report for the next 3 years. The primary advantage to developing a multi -year report is the ability to inform and engage property owners of proposed projects through neighborhood informational meetings further in advance. With this concept, each successive year's feasibility report would update the program to add the 3' year's project. This would work towards providing notice of projects 3 years in advance of an improvement project. CONCLUSION Staff will provide an overview of the pavement management program. Should Council 1) support funding the pavement management program at $700,000 in 2011, and 2) support the proposed 2011 improvement area, the $700,000 Street CIP levy for 2011 will be maintained and staff will prepare a Council item to initiate the 2011 -2013 Street Improvement Project. gApavement management \2010 pmp \081110.ccws.pmpmemo.d0cx 3 S ZQ' )0-- CD - Cr CD CD -wLID C� -n CD (D Cl O 22 2a 7' 0 2 Moll o0z is jn jA c ..Illie � aTh - -Ttf-4 AKhCN Av& ARROW AVE (CR 731 AKRON AVE (CR 73) m 0 iri AUDRFti A, I 8-b .HA AYE O 1`13 BLAINE AVE bk AWE AVE 1 7 11 IMM'. C R.AU CLAYTON AVE iils ;2 1 1,_N-1, (U55') Clews Existing Pavement Conditions He zc 2010 1' OCI Range % Roadway Length (Miles) 0— 10 0.131/. 0.11 OCI Range % Roadway 10-20 3.38% 3.11 0 -35 8.29% 20-30 2.10% 1.99 35 -60 7.33% 30-40 4.01% 3.30 60 -90 40.561/. 40-50 1.67% 1.36 90 100 43.82% 50-60 4.34% 3.47 60 — 70 5.17% 4.90 70-80 6.83% 5.94 80-90 28.56% 23.78 90- 100 43.82% 37.97 Required Annual Budget $2.500 i Y � M � $1.500 m m Y1.000 -s--.- -•_ —. - Q bsoo E0 f Year Manton OCI - 77 • S700K BWgW +S600K a Qm Improved Network OCI so y 80 M I i 70 ' i 65 Year Required Annual Budget $2.500 i Y � M � $1.500 m m Y1.000 -s--.- -•_ —. - Q bsoo E0 f Year Manton OCI - 77 • S700K BWgW +S600K a Qm all V OSFMOUXr ILID • c i PER a PM is 1 f 'l G ~ -- _ 1 Cu i , C: T-d o �= o f 'l G ~ -- _ 1 Cu C: tl� o �= o o U = c- a) = L a) o r- N N c� O O O O O O �i C,4 N N N N c I J Z f 'l G ~ -- _ 1 o = c� 3 0� c o� o v s' < co 0 4 Ct o' c� k C7 m o , �r 0 oL 0 gy O (p m IF'", 0 '0 n m n 'O 0 n 2z2° a w O N p A A S _ S — 00 Z. N a