HomeMy WebLinkAbout6.k. Receive Bids/Award Contract - Glendalough 3rd Addition Street and Utility Improvements, City Project #4304ROSEMOLIt4T EXECUTIVE SUMMARY
CITY COUNCIL
City Council Meeting: September 7, 2010
AGENDA ITEM: Receive Bids / Award Contract -
AGENDA SECTION:
Glendalough 3d Addition Street and
Consent
Utility Improvements, City Project #430
PREPARED BY: Andrew J. Brotzler, PE, Director of Pu ft�
GENDA NO.
Works / City Engineer
•
ATTACHMENTS: Resolution; Bid Tab; Letter of
APPROVED BY:
Recommendation; Map
RECOMMENDED ACTION: Motion to Adopt a Resolution Receiving Bids and Awarding
the Contract for the Glendalough 3rd Addition Street and Utility Improvements, City Project
#430.
ISSUE:
Receive bids and award contract for the Glendalough 3rd Addition Street and Utility Improvements, City
Project #430.
BACKGROUND:
On Friday, August 27, 2010, bids for this project were received and read aloud publicly. After verification
of bids received, the low bidder is Ryan Contracting Company in the amount of $330,907. All costs
associated with this project will be funded by the developer, Lennar.
The Glendalough 3rd Addition is comprised of 29 single - family residential units. The proposed
improvements include the construction of city streets that include concrete curb and gutter and 5 -foot
concrete sidewalks. Utility improvements on Coachford Avenue south of 134`h Street include the
construction of water main, sanitary sewer, and storm sewer. Utility improvements along 134`h Street, and
on Coachford Avenue north of 134d' Street, include only the construction of lateral storm sewer, as the
majority of public utility improvements in the area were previously installed with the Glendalough 7d'
Addition, City Project 401, in 2006.
It is anticipated that the public improvements for the Glendalough 3rd Addition will be started
and fully completed, including all restoration items (except the bituminous wear course) by the end of the
2010 construction season.
SUMMARY:
Staff recommends that Council adopt the attached resolution receiving the bids and awarding the contract
for the Glendalough 3`d Street and Utility Improvements, City Project #430.
G: \ENGPROJ \430 \20100907 CC RecBid- AwardContract.docx
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2010 —
A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT
FOR THE GLENDALOUGH 3RD
STREET AND UTILITY IMPROVEMENTS
CITY PROJECT #430
WHEREAS, the City Council authorized the City Engineer to advertise for bids.
BE IT FURTHER RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows:
All bids on construction of Glendalough 3rd Street and Utility Improvements have been received and
tabulated.
The bid of Ryan Contracting Company from Elko, Minnesota, in the amount of $330,907.00
for the construction of said improvements is in accordance with the plans and specifications
and advertisement for bids, and is the lowest responsible bid and shall be and hereby is
accepted.
2. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said
bidder for the construction of said improvements for and on behalf of the City of
Rosemount.
3. The City Clerk is hereby authorized and directed to return forthwith to all bidders the
deposits made with their bids, except that the deposit of the successful bidder and the next
two lowest bidders shall be retained until a contract has been executed.
ADOPTED this 7'' day of September, 2010.
William H. Droste, Mayor
ATTEST:
Amy Domeier, City Clerk
IVA
ROSEMOLINT
Glendalough 3rd
F. CHARLSTON WAY,
t.
132ND
ST W
GS
X
011
134TH T VV- I
?tR,4
1 C,
Wr
Cf)
F7
UU.
O�
13A
BRONZ E
CT
I C33 R DDiT
—A
0
IS
Awl
G�T4 -o ; , cRR . AC A/
0
(Uli R-
% 00
Z 136TH ST W T,
UI �,4
0 COLESHIRE P LL - Uj
CL I-- I
�Lu
T 2� 0 CORLISS TRL
Ov�\
(40
ARC, 137TH ST z >j u
A z uj
V
cn!
Brockway
CONNEMP
Park
UJ
N k34-f" ST
00Z
ED
�Brockwa
Park
B
BR
PKW'
138TH ST W
Schwarz Pond Pd� C
'U
138TH ST VA
Z
Ism
U. 138TH ST I
4 SCHWARZ
D
139TH ST W
POND
ca
W W I
> >
0 280 560 1,120 1,680 2,240
Feet
July 2010
T:/GIS/City/Maps/Departmental Maps/Engineering/Chris/Glendalough 3rd Locate
WSB
- Engineering C Planning E Environmental F, Construction
& Associates. Inc.
August 31, 2010
Honorable Mayor and City Council
City of Rosemount
2875 —145d' Street West
Rosemount, MN 55068
Attn: Cindy Dorniden
Re: Glendalough 3rd Addition
Street and Utility Construction
City of Rosemount Project No. 430
WSB Project No. 1916 -10
Dear Mayor and Council Members:
701 Xenia Avenue South
Suite 300
Minneapolis, MN 55416
Tel: 763 -541 -4800
Fax: 763 - 541 -1700
Bids were received for the above - referenced project on Tuesday, August 27, 2010, and were opened and
read aloud. A total of eight bids were received. The bids were checked for mathematical accuracy and
tabulated. The Engineer's Estimate was $414,134.00. Please find enclosed the bid tabulation indicating
the low bidder as Ryan Contracting Company, Elko, Minnesota, in the amount of $330,907.00.
We recommend that the City Council consider these bids and award a contract to Ryan Contracting
Company, based on the results of the bids received.
Sincerely,
WSB & Associates, Inc.
Phil lson, PE
Project Manager
Enclosures
cc: Thomas Ryan, Ryan Contracting Company
Andy Brotzler, City of Rosemount
tsf
Minneapolis E St. Cloud
Equal Opportunity Employer
CADo rner is and SettingstpcoUcal Settings \Temporary Internet Files \OLKDS\LTR RECMMDTN- tancG082710 (5).doc
PROJECT:
Glendalough 3rd Addition
Street and Utility Construction
City of Rosemount Project No. 430
LOCATION:
City of Rosemount, MN
WSB PROJECT NO.:
1916 -10
Bids Opened: Tuesday, August 27, 2010 at 10:00 a.m.
Engineer's Opinion of Cost $414,134.00
1 hereby certify that this is a true and correct tabulation of the bids as received on August 27, 2010.
Q A
,.-UnCA0�-,
Phil Olson, PE
_ Denotes corrected figure
CADocuments and SettingslpcoW ocal SettingslTemporary Internet Filesl0LKD611916 -10 Bid Tab Summaryxls
Contractor
Bid Security
(5%) Addendum No.1
Grand Total Bid
1
Ryan Contracting Company
X
X
$330,907.00
2
BCM Construction, Inc.
X
X
$346,917.70
3
Northwest Asphalt, Inc.
X
X
$361,650.76
4
Northdale Construction Co., Inc.
X
X
$383,876.80
5
Friedges Contracting Co. LLC
X
X
$399,990.15
6
Douglas -Kerr Underground, LLC
X
X
$404,821.59
7
McNamara Contracting, Inc.
X
X
$418,921.50
8
Heselton Construction, LLC
X
X
$454,386.25
Engineer's Opinion of Cost $414,134.00
1 hereby certify that this is a true and correct tabulation of the bids as received on August 27, 2010.