Loading...
HomeMy WebLinkAbout6.e. Change Order #1 - Quiet Zone Improvements, City Project #4184ROSEMOUNTEXECUTIVE SUMMARY CITY COUNCIL City Council Meeting: April 20, 2010 AGENDA ITEM: Change Order #1 — Quiet Zone AGENDA SECTION: Improvements, City Project #418 Consent PREPARED BY: Andrew J. Brotzler, PE, Director of Public AGENDA NO. Works / City Engineer ATTACHMENTS: Change Order #1 APPROVED BY: DbJ RECOMMENDED ACTION: Motion to Approve Change Order #1 for the Quiet Zone Improvements, City Project #418. BACKGROUND: Attached for Council consideration is Change Order #1 for the Quiet Zone Improvements, City Project #418. This change order represents additional costs incurred as a result of changes to the Union Pacific Railroad insurance requirements and additional trail added to the scope of the project on the east side of Biscayne Avenue. The additional bituminous trail will connect the existing bituminous trail segment on the north side of the railroad crossing to the existing sidewalk on the south side of the railroad crossing. These improvements result in a net increase of $16,876 for a revised contract amount of $103,240.75. All improvements associated with this change order will be funded with State Aid funding. SUMMARY: Staff recommends Council approval of Change Order #1 for the Quiet Zone Improvements, City Project #418. G: \ENGPRO] \418 \04202010 CC ChangeOrderl.doc CHANGE ORDER NO. 1 QUIET ZONE RAILROAD CROSSING IMPROVEMENTS 04/05/10 CITY ROSEMOUNT PROJECT NO. 418 S.A.P. 208-108-007 WSB PROJECT 1668 -38 OWNER: CITY OF ROSEMOUNT 2875 -145TH STREET WEST ROSEMOUNT, MN 55068 CONTRACTOR: NORTHWEST ASPHALT, INC. 1451 STAGECOACH ROAD SHAKOPEE, MN 55379 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: THE ADDITIONAL WORK AND CONTRACT TIME EXTENSION, AS SHOWN ON THE ATTACHED DETAIL SHEET, ARE THE RESULT OF ADDITIONAL TRAIL WHICH HAS BEEN ADDED TO THE SCOPE OF THE PROJECT. THE BITUMINOUS TRAIL SHALL CONNECT THE EXISTING BITUMINOUS TRAIL SEGMENT FROM THE NORTH SIDE OF THE UNION PACIFIC RAILROAD (UPRR) RIGHT -OF -WAY (ROW) TO SIDEWALK ON THE SOUTH SIDE OF THE UPRR ROW. THE TRAIL IMPROVEMENTS SHALL BE INSTALLED AFTER UPRR HAS EXTENDED THE RAILROAD CROSSING SURFACE TO THE TRAIL LOCATION. ALL IMPROVEMENTS ASSOCIATED WITH CHANGE ORDER #1 SHALL BE FUNDED 100% WITH STATE AID FUNDING. IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: ORIGINAL CONTRACT PRICE: $86,364.75 ORIGINAL CONTRACT TIME: 5/15/2010 PREVIOUS CHANGE ORDERS: $0.00 NET CHANGE FROM PREVIOUS CHANGE ORDERS: 0 CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: $86,364.75 CONTRACT TIME PRIOR TO THIS CHANGE ORDER: 5/15/2010 NET INCREASE OF THIS CHANGE ORDER: $16,876.00 NET INCREASE WITH CHANGE ORDER: 7 CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: $103,240.75 CONTRACT TIME WITH APPROVED CHANGE ORDERS 5/22/2010 RFr.r)mmrzm p:n RV• APPROVED BY: CITY ENGINEER DATE OF COUNCIL ACTION APPROVED BY: � (rNxt '(� I :"TOQ� -CrA - -- 11 TRACT SIGNATURE NORTHWEST ASPHALT, INC. CONTRACTOR CITY ADMINISTRATOR APPROVED FOR STATE AID FUNDS IWasproJ ectso *ects1016W,?Mdm7nlConsVucftn AdminlChange Order M111668.38 Change Order tzbSlgnature QUIET ZONE RAILROAD CROSSING IMPROVEMENTS CITY ROSEMOUNT PROJECT NO. 418 S.A.P. 208- 108 -007 WSB PROJECT 1668 -38 ADDED QUANTITY / ITEMS Item No. Mat. No. Description CHANGE ORDER NO. 1 DETAIL Note Qty Unit 04/05/10 Price Extended Amount 3 2104.501 REMOVE CURB AND GUTTER 1 40 LIN FT $5.00 $200.00 8 2104.513 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) 2 8 LIN FT $3.00 $24.00 19 2521.501 4" CONCRETE WALK 3 240 SQ FT $3.75 $900.00 20 2531.501 CONCRETE CURB 8 GUTTER DESIGN 8618 4 40 LIN FT $14.75 $590.00 38 2104.523 SALVAGE SIGN TYPE C 5 1 EACH $50.00 $50.00 39 2521.511 3" BITUMINOUS WALK 6 1100 SQ FT $4.50 $4,950.00 40 2531.618 TRUNCATED DOMES 7 48 SQ FT $44.00 $2,112.00 41 2564.537 INSTALL SIGN TYPE C 8 1 EACH $150.00 $150.00 42 2575.505 SODDING TYPE EROSION 9 350 SQ YD $10.00 $3,500.00 43 2021.601 RAILROAD PROTECTIVE LIABILITY INSURANCE 10 1 LUMP SUM $4,400.00 $4,400.00 TOTAL ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT NOTES: 1. ADDITIONAL QUANTITY ADDED TO ORIGINAL CONTRACT ITEM #3. COMPENSATION IN FULL FOR THE REMOVAL OF CURB AND GUTTER AT EXISTING AND PROPOSED PEDESTRIAN RAMPS AS SHOWN ON REVISED PLAN SHEET 5. ITEM TO BE FUNDED 1009/6 BY CITY SAP 208 -108 -007. 2. ADDITIONAL QUANTITY ADDED TO ORIGINAL CONTRACT ITEM #8. COMPENSATION IN FULL FOR SAW CUTTING BITUMINOUS PAVEMENT AND WALK AS REQUIRED TO COMPLETE THE WORK SHOWN ON REVISED PLAN SHEET 5 AND 6. ITEM TO BE FUNDED 100% BY CITY SAP 208 - 108 -007. 3. ADDITIONAL QUANTITY ADDED TO ORIGINAL CONTRACT ITEM #19. COMPENSATION IN FULL FOR THE INSTALLATION OF 3 PEDESTRIAN RAMPS AS REQUIRED TO COMPLETE THE WORK SHOWN ON REVISED PLAN SHEET 6. ITEM TO BE FUNDED 100% BY CITY SAP 208 - 108-007. 4. ADDITIONAL QUANTITY ADDED TO ORIGINAL CONTRACT ITEM #20. COMPENSATION IN FULL FOR THE INSTALLATION OF CURB AND GUTTER AT EXISTING AND PROPOSED PEDESTRIAN RAMPS AS REQUIRED TO COMPLETE THE WORK SHOWN ON REVISED PLAN SHEET 6. ITEM TO BE FUNDED 100% BY CITY SAP 208 - 108 -007. 5. NEW BID ITEM #38. COMPENSATION IN FULL TO SALVAGE SIGN IN CONFLICT OF NEW WALK AS SHOWN ON REVISED PLAN SHEET 5. ITEM TO BE FUNDED 100% BY CITY SAP 208 - 106.007. 3. NEW BID ITEM #39. COMPENSATION IN FULL FOR THE INSTALLATION OF BITUMINOUS WALK AS SHOWN ON REVISED PLAN SHEET 6. ITEM TO BE FUNDED 100% BY CITY SAP 2D8- 108 -007. 7. NEW BID ITEM #40. COMPENSATION IN FULL FOR THE INSTALLATION OF TRUNCATED DOMES IN THE 3 NEW PEDESTRIAN RAMPS AS SHOWN ON REVISED PLAN SHEET 6. ITEM TO BE FUNDED 100% BY CITY SAP 208 -108 -007. 8. NEW BID ITEM # 41. COMPENSATION IN FULL FOR THE INSTALLATION OF THE SALVAGED SIGN AS SHOWN ON REVISED PLAN SHEET 6. ITEM TO BE FUNDED 100% BY CITY SAP 208- 108-007. 9. NEW BID ITEM #42. COMPENSATION IN FULL FOR THE INSTALLATION AND MAINTENANCE OF SODDING AS REQUIRED BY THE CITY OF ROSEMOUNT SPECIFICATIONS. SODDING SHALL BE INSTALLED AS REQUIRED TO RESTORE ALL DISTURBED AREAS IMPACTED BY THE INSTALLATION OF THE BITUMINOUS WALK. ITEM TO BE FUNDED 100% BY CITY SAP 208- 108 -007. 10. NEW BID ITEM #43. THIS ITEM IS COMPENSATION IN FULL FOR ALL INCREASES TO THE UPRR INSURANCE REQUIREMENTS PLUS 10% FOR CONTRACTOR MARKUP. THE INSURANCE PROVISIONS PROVIDED BY UPRR INCLUDED THE PROJECT SPECIFICATIONS FOR WORK WITHIN THE UPRR ROW WERE NOT CURRENT. UPDATED UPRR INSURANCE PROVISIONS REQUIRE HIGHER INSURANCE LIMITS BY THE CONTRACTOR TO COMPLETE THE CONTRACT WORK WITHIN THE RIGHT -OF -WAY. THE ENGINEER HAS DETERMINED THAT THE CONTRACTOR IS ENTITLED TO ADDITIONAL COMPENSATION TO COVER THE INCREASED INSURANCE REQUIREMENTS. ITEM TO BE FUNDED 100% BY CITY SAP 208 - 108 -007. $16,876.00 iw,sp.y srsa.oj onwreeeaauam, v�rwoAaMMCh neWad«81WIM- MWoMeaw.1awi