HomeMy WebLinkAbout6.k. Payment #15 & Final - Akron Avenue Trunk Utility & Railroad Improvements, City Project #417�i►D1X(__')/SEM0L1NT EXECUTIVE SUMMARY
CITY COUNCIL
City Council Meeting: October 5, 2010
AGENDA ITEM: Payment #15 & Final —Akron Avenue Trunk
AGENDA SECTION:
Utility and Railroad Improvements, City
Consent
Project #417
PREPARED BY: Andrew J. Brotzler, PE, Director of Pub c
AGENDA NO.
Works / City Engineer
ATTACHMENTS: Payment Voucher; Map
APPROVED BY:
RECOMMENDED ACTION: Motion to Approve Payment #15 and Final for the Akron
Avenue Trunk Utility and Railroad Improvements, City Project #417, to LaTour
Construction. and Accepting it for Perpetual Maintenance.
BACKGROUND:
This item is on the agenda to request Payment #15 and Final in the amount of $7,271.54 to LaTour
Construction for the Akron Avenue Trunk Utility and Railroad Improvements, City Project #417.
This project included the extension of trunk sanitary sewer and water facilities along Akron Avenue to
provide service to properties along Akron Avenue in anticipation of fixture development. Additionally, this
project included improvements of the as -grade railroad crossing on Akron Avenue and the construction of
a Metropolitan Council Environmental Services (MCES) sewer interceptor line.
The final construction amount of $3,234,348.02 is 1.9% above the revised contract amount of
$3,172,651.57, which is under the construction contingency amount of 5 %.
This increase in construction cost can be primarily attributed to three factors encountered during
construction. First, varying subsurface conditions encountered during utility excavation resulted in a
greater than estimated volume of soils deemed unsuitable for backfill of the utility trench, and it was
necessary to import additional granular material to the site to replace these clays and other unsuitable
materials within the right -of -way. Second, a portion of the existing aggregate base material in the roadway
to be salvaged did not meet Dakota County's requirements for reuse on the project, and therefore it was
necessary to import additional aggregate material to the site to replace it. Third and finally, the non-
negotiable hourly requirements for an on -site railroad flag person required by permit with the railroad for
work within railroad right -of -way, and as determined by Union Pacific Railroad, were greater than
estimated on the project.
SUMMARY:
Staff recommends that Council approve Payment #15 and Final for the project and accept the project for
perpetual maintenance subject to the following conditions.
1. Satisfactorily showing that the contractor has complied with the provisions of Minnesota Statutes
290.92 requiring withholding state income tax.
G: \ENGPRO] \417 \20101005 CC Payment 15 & Final.doc
2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the
contract have been fully paid or satisfactorily secured.
3. Consent of Surety to Final Payment certification from the contractor's surety.
4. Two -year maintenance bond.
2
WSB
- Engineering Planning Environmental Construction 701 Xenia Avenue South
& Associates. Inc. Suite 300
Minneapolis, MN 55416
Tel: 763 - 541 -4800
Fax: 763 - 541 -1700
September 15, 2010
Honorable Mayor and City Council
City of Rosemount
2875 —145' Street West
Rosemount, MN 55068
Attn: Cindy Dorniden, City of Rosemount
Re: Construction Pay Voucher No. 15 (Final)
Akron Avenue Trunk Utility and Railroad Improvements
City of Rosemount Project No. 417
WSB Project No. 1668 -30
Dear Mayor and Council Members:
Please find enclosed the final Construction Pay Voucher No. 15 for the above - referenced project in the
amount of $7,271.54. The final construction amount of $3,234348.02 is 1.9% -more than the revised
contract amount of $3,172,651.57, which is under the construction contingency amount of 5 %.
This increase in construction cost can be primarily attributed to three factors encountered during
construction. First, varying subsurface conditions encountered during utility excavation resulted in a
greater than estimated volume of soils deemed unsuitable for backfill of the utility trench, and it was
necessary to import additional granular material to the site to replace these clays and other unsuitable
materials within the right -of -way. Second, a portion of the existing aggregate base material in the
roadway to be salvaged did not meet Dakota County's requirements for reuse on the project, and
therefore it was necessary to import additional aggregate material to the site to replace it. Third and
finally, the non - negotiable hourly requirements for an on -site railroad flag person required by permit
with the railroad for work within railroad right -of -way, and as determined by Union Pacific Railroad,
were greater than estimated on the project.
The final quantities have been agreed to by the contractor, and we hereby recommend final payment
subject to receipt of the following items:
1. Satisfactorily showing that the contractor has complied with the provisions of Minnesota Statutes
290.92 requiring withholding state income tax.
2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the
contract have been fully paid or satisfactorily secured.
3. Consent of Surety to Final Payment certification from the contractor's surety.
4. Two -year Maintenance Bond (warranty start date to coincide with the date Council approves
final payment).
Minneapolis ❑ St. Cloud
Equal Opportunity Employer
Honorable Mayor and City Council
September 15, 2010
Page 2
We recommend that you make final payment in the amount of $7,271.54 for LaTour Construction, Inc.
at your earliest convenience. Please contact me at 763 - 287 -7173 if you have any questions or comments
regarding the attached information. Thank you.
Sincerely,
WSB & Associates, Inc.
Morg Da le PE
Project ager
Enclosures
cc: Andy Brotzler, City of Rosemount
Joseph LaTour, LaTour Construction, Inc.
tsf
CADa ments and Settings \pco\Local Setlings\Ten"ran' Internet Files\OLKD6\LTR VO 15 FM. M-091510Aoc
WSB
& Associates, 1►►c.
Owner: City of Rosemount
2875 145th Street West
Rosemount, MN 55068 -4941
For Period: 8/1/2010 to 8/31/2010
Contractor: Latour Construction
2134 County Road 8 NW
Maple Lake, MN 55358
Date: 9114/2010
Request No.: 15 & FINAL
Pay Voucher
Akron Avenue Trunk Utility and Railroad Improvements
Client Contract No.:
Project No.: 01668 -30
Client Project No.: 417
Project
Summary
1
Original Contract Amount
$3,102,181.66
2
Contract Changes - Addition
$709,361.46
3
Contract Changes - Deduction
($638,891.55)
4
Revised Contract Amount
$3,172,651.57
5
JValue Completed to Date
$3,234,348.02
6
Material on Hand
$0.00
7
Amount Earned
$3,234,348.02
8
Less Retainage
$0.00
9
Subtotal
$3,234,348.02
10
1 Less Amount Paid Previously
$3,227,076.48
11
ILiquidat ed Damages
$0.00
12
JAMOUNT DUE THIS PAY VOUCHER NO. 15 & FINAL
$7,271.54
I HEREBY CERTIFY THAT A FINAL EXAMINATION HAS BEEN MADE OF THE ABOVE NOTED CONTRACT, THAT THE
CONTRACT HAS BEEN COMPLETED, THAT THE ENTIRE AMOUNT OF WORK SHOWN IN THE FINAL VOUCHER HAS BEEN
PERFORMED AND THE TOTAL VALUE OF THE WORK PERFORMED IN ACCORDANCE WITH, AND PURSUANT TO, THE
TERMS OF THE CONTRACT IS AS SHOWN IN THIS FINAL VOUCHER.
Recommended for Approval by:
WSR & Associates, Inc. ,
Approved
Latour 0
Specified Contract Completion Date:
12/31/2009
Comment:
Construction Observer:
Approved by Owner:
City of Rosemount
Date:
Page 1 of 9
Project Material Status
Item No. I Item I Description JUnits Unit Price I Contract Quantity I Quantity to Date I Current Quantity Amount to Date
SCHEDULE A - SURFACE IMPROVEMENTS
1
2021.501
MOBILIZATION (2 %)
LUMP SUM
$13,250.00
1
1
0
$13,250.00
2
2104.501
REMOVE PIPE CULVERTS
LIN FT
$2.70
130
154
0
$415.80
3
2104.501
REMOVE_ CURB AND GUTTER
LIN FT
$4.50
60
0
0
$0.00
4
2104.501
REMOVE FENCE
LIN FT
$1.35
1575
2200
0
$2,970.00
5
2104.505
REMOVE BITUMINOUS PAVEMENT
SQ YD
$3.00
130
0
0
$0.00
6 12104.513
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)
LIN FT
$3.00
110
0
0
$0.00
7
2104.521
SALVAGE PIPE SEWER
LIN FT
$9.00
115
0
0
$0.00
8
2104.523
SALVAGE PIPE APRON
EACH
$180.00
1
0
0
$0.00
9
2104.523
SALVAGE SIGN
EACH
$15.00
10
2
0
$30.00
10
2104.607
SALVAGE RANDOM RIPRAP
CU YD
$18.00
6
0
0
$0.00
11
2104.619
SALVAGE UNCLASSIFIED MATERIAL
ROAD STA
$270.001
52
35.4
0
$9,558.00
12 12105.501
COMMON EXCAVATION (P)
CU YD
$4.50
560
390
0
$1,755.00
13
2105.521
GRANULAR BORROW (CV) (P)
CU YD
$10.50
660
2837.07
0
$29,789.24
14
2105.522
SELECT GRANULAR BORROW (CV)
CU YD
$15.00
140
0
0
$0.00
15
2105.601
DEWATERING
LUMP SUM
$0.01
1
0
0
$0.00
16
2105.601
TEMPORARY ROAD 1
LUMP SUM
$1,650.00
1
1
0
$1,650.00
17
2105.601
TEMPORARY ROAD 2
LUMP SUM
$1,950.001
1
1
0
$1,950.00
18 12105.619
UNCLASSIFIED MATERIAL PLACEMENT
ROAD STA
$162.00
52
35.4
0
$5,734.80
19
2112.501
SUBGRADE PREPARATION
ROAD STA
$140.00
52.3
35.4
0
$4,956.00
20
2211.501
AGGREGATE BASE CLASS 5
TON
$12.00
675
2987.87
0
$35,854.44
21
2211.607
AGGREGATE BASE SPECIAL (CV)
CU YD
$6.00
3350
1325
0
$7,950.00
22
2350.501
TYPE MV 3 WEARING COURSE MIXTURE (C)
TON
$125.00
30
0
0
$0.00
23
2350.502
TYPE NIV 3 NON WEARING COURSE MIXTURE (B)
TON
$105.00
30
0
0
$0.00
24 12357.502
BITUMINOUS MATERIAL FOR TACK COAT
GALLON
$3.00
15
0
0
$0.00
25
2501.511
12" CS PIPE CULVERT
LIN FT
$25.50
85
54
0
$1,377.00
26
2501.511
24" CS PIPE CULVERT
LIN FT
$32.80
45
46
0
$1,508.80
27
2501.573
INSTALL PIPE APRON
EACH
$230.00
1
0
0
$0.00
28
2503.571
INSTALL PIPE SEWER
LIN FT
$15.30
115
0
0
$0.00
29
2511.515
GEOTEXTILE FILTER TYPE IV
SQ YD
$2.00
9
0
0
$0.00
30
2511.607
INSTALL RANDOM RIPRAP
CU YD
$16.00
6
0
0
$0.00
31
2531.501
CONCRETE CURB & GUTTER DESIGN B618
LIN FT
$26.50
60
0
0
$0.00
32
2540.602
SALVAGE AND REINSTALL MAIL BOX
EACH
$130.00
4
1
0
$130.00
33
2540.602
MAIL BOX (TEMPORARY)
EACH
$90.00
4
1
0
$90.00
34
2563.601
TRAFFIC CONTROL
LUMP SUM
$8,000.00
1
1
0
$8,000.00
35
2564.602
INSTALL SIGN
EACH
$85.00
10
0
0
$0.00
36
2573.502
SILT FENCE, TYPE MACHINE SLICED
LIN FT
$1.55
14500
8680
0
$13,454.00
37
2573.540
FILTER LOG TYPE WOOD FIBER BIOROLL
LIN FT
$2.95
160
0
0
$0.00
38
2575.501
SEEDING
ACRE
$125.001
16
12.57
0
$1,571.25
39
2575.502
SEED MIXTURE 250
POUND
$2.60
1100
895
0
$2,327.00
40
2575.505
SODDING, TYPE LAWN (INCL. TOPSOIL 8, FERT.)
SQ YD
$3.00
4650
2136
0
$6,408.00
41
2575.511
MULCFi MATERIAL TYPE 1
TON
$150.00
30.5
32.8
0
$4,920.00
42
2575.519
DISK ANCHORING
ACRE
$65.00
15.5
13.65
0
$887.25
43
2575.523
EROSION CONTROL BLANKETS CATEGORY 3
JSQYD
$1.10
2850
650
0
$715.00
44
12575.532
1 COMMERCIAL FERTILIZER ANALYSIS 23 -0 -23
IPOUND
1 $0.551
3200
2550
0
$1,402.50
Totals For Section SCHEDULE A - SURFACE IMPROVEMENTS:
$158,654.08
SCHEDULE B - RAILROAD CROSSING SURFACE IMPROVEMENTS
45
2021.501
MOBILIZATION (2 %)
LUMP SUM
$7,500.00
1
1
0
$7,500.00
46
2104.523
SALVAGE SIGN
EACH
$20.00
2
0
0
$0.00
47
2104.601
REMOVE MISCELLANEOUS DEBRIS
LUMP SUM
$935.00
1
1
0
$935.00
48
2104.619
SALVAGE UNCLASSIFIED MATERIAL
ROAD STA
$335.00
5.1
5.1
0
$1,708.50
Page 2 of 9
Item No.
Item
Description
Units
Unit Price
Contract Quantity
Quantity to Date
Current Quantity
Amount to Date
49
2105.501
COMMON EXCAVATION (P)
CU YD
$2.00
1125
1125
0
$2,250.00
50
2105.521
GRANULAR BORROW (CV) (P)
CU YD
$9.70
7025
7880.26
0
$76,438.52
51
2105.522
SELECT GRANULAR BORROW (CV)
CU YD
$10.20
2000
1429.5
0
$14,580.90
52
2105.619
UNCLASSIFIED MATERIAL PLACEMENT
ROAD STA
$265.00
5.1
5.1
0
$1,351.50
53
2112.501
SUBGRADE PREPARATION
ROAD STA
$225.00
5.11
5.1
0
$1,147.50
54
2211.501
AGGREGATE BASE CLASS 5
TON
$11.80
1320
1320
0
$15,576.00
55
2350.501
TYPE MV 3 WEARING COURSE MIXTURE (C)
TON
$77.00
515
491.39
0
$37,837.03
56
2350.502
TYPE MV 3 NON WEARING COURSE MIXTURE (B)
TON
$66.00
515
436.51
0
$28,809.66
57
2357.502
BITUMINOUS MATERIAL FOR TACK COAT
GALLON
$2.25
350
140
0
$315.00
58
2511.501
RANDOM RIPRAP CLASS IV
CU YD
$78.50
100
16
0
$1,256.00
59
2511.515
GEOTEXTILE FILTER TYPE IV
SQ YD
$2.00
50
20
0
$40.00
60
2521.501
4" CONCRETE WALK
SQ FT
$4.40
1050
1227
0
$5,398.80
61
2521.604
2" BITUMINOUS PATH
SQ YD
$27.00
420
553
0
$14,931.00
62
2531.501
CONCRETE CURB & GUTTER DESIGN 8618
LIN FT
$12.70
890
943
0
$11,976.10
63
2531.602
CONCRETE MEDIAN NOSE DESIGN 7109
EACH
$220.00
4
4
0
$880.00
64
2563.610
FLAG PERSON
HOUR
$72.00
200
458.25
0
$32,994.00
65
2564.602
INSTALL SIGN
EACH
$125.00
2
0
0
$0.00
66
2564.603
4" DOUBLE SOLID LINE YELLOW -EPDXY
LIN FT
$1.00
560
730
0
$730.00
67
2564.603
12" SOLID LINE WHITE -EPDXY
LIN FT
$7.00
50
32
0
$224.00
68
2564.603
24" SOLID LINE YELLOW -EPDXY
LIN FT
$5.00
90
54
0
$270.00
69
2573.502
SILT FENCE, TYPE MACHINE SLICED
LIN FT
$1.55
1100
1022
0
$1,584.10
70
2575.501
SEEDING
ACRE
$400.00
1.7
0
0
$0.00
71
2575.511
MULCH MATERIAL TYPE 1
TON
$350.00
1
0
0
$0.00
72
2575.519
DISK ANCHORING
ACRE
$65.00
0.5
0
0
$0.00
73
2575.523 1
EROSION CONTROL BLANKETS CATEGORY 3 ISQYD
$1.10
5850
4055
0
$4,460.50
74 12575.532
1COMMERCIAL FERTILIZER ANALYSIS 23 -0 -23
IPOUND
1 $0.60
3401
01
0
$0.00
Totals For Section SCHEDULE B - RAILROAD CROSSING SURFACE IMPROVEMENTS:
$263,194.11
SCHEDULE B2 - RAILROAD CROSSING SANITARY SEWER IMPROVEMENTS
75
2451.602
1GRANULAR FOUNDATION AND /OR BEDDING
TON
$0.011
50
0
0
$0.00
76
2503.541
20" PV , PIPE SEWER DESIGN PRESSURE -OR 18
LIN FT
$135.00
511
511
0
$68,985.00
77
2503.603
36" STEEL CASING PIPE (JACKED)
LIN FT
$1,017.00
220
220
0
$223,740.00
78
2503.603
SANITARY SEWER INSPECTION (TELEVISING)
LIN FT
$1.10
511
511
0
$562.10
79
2506.516
CASTING ASSEMBLY (SANITARY)
EACH
$905.00
2
2
0
$1,810.00
80
2506.603
CONST 48" DIA SAN SEWER MANHOLE
LIN FT
$95.00
881
87.93
0
$8,353.35
81
12540.6011
RAILROAD CROSSING
I LUMP SUM
1$2,300.001
11
11
0
$2,300.00
Totals For Section SCHEDULE B2 - RAILROAD CROSSING SANITARY SEWER IMPROVEMENTS:
$305,750.45
SCHEDULE B3 - RAILROAD CROSSING TRUNK WATER MAIN IMPROVEMENTS
82
2451.602
GRANl.1LAR FOUNDATION AND /OR BEDDING
TON
$0.01
50
0
0
$0.00
83
2504.602
HYDRANT
EACH
$2,660.00
1
1
0
$2,660.00
84
2504.602
6" GATE VALVE AND BOX
EACH
$870.00
1
1
0
$870.00
85
2504.603
6" WATER MAIN -DUCT IRON CL 52
LIN FT
$34.40
19
20.2
0
$694.88
86
2504.603
12" WATER MAIN -DUCT IRON CL 52
LIN FT
$53.00
511
511
0
$27,083.00
87
2504.603
30" STEEL CASING PIPE (JACKED)
LIN FT
$360.001
100
100
0
$36,000.00
88
2504.604
4" POLYSTYRENE INSULATION
SQ YD
$26.00
10
3.55
0
$92.30
89
2504.608
DUCTILE IRON FITTINGS
POUND
$1.00
500
325
0
$325.00
90
2540.601
RAILROAD CROSSING
LUMP SUM
$2,300.00
1
1
0
$2,300.00
91
2550.512
HANDHOLE
EACH
$495.00
1
1
0
$495.00
92
2550.603
2" FLE!IXIBLE NON - METALLIC CONDUIT
LIN FT
$2.40
5501
511
0
$1,226.40
Totals For Section SCHEDULE B3 - RAILROAD CROSSING TRUNK WATER MAIN IMPROVEMENTS:
$71,746.58
SCHEDULE C - SANITARY SEWER IMPROVEMENTS
Page 3 of 9
Item
No.
Item
Description
Units
Unit Price
Contract
Quantity
Quantity to
Date
Current
Quantity
Amount to
Date
93
2451.602
GRANULAR FOUNDATION AND /OR BEDDING
TON
$0.01
500
0
0
$0.00
94
2503.541
10" PVC PIPE SEWER DESIGN PRESSURE - DR 25
LIN FT
$67.00
20
38
0
$2,546.00
95
2503.541
8" PVC PIPE SEWER DESIGN PRESSURE - DR 18
LIN FT
$118.50
769
391
0
$46,333.50
96 12503.541
20" PVC PIPE SEWER DESIGN PRESSURE - DR 18
LIN FT
$159.601
2292
637.55
0
$101,752.98
97
2503.541
24" PVC PIPE SEWER DESIGN PRESSURE - DR 18
LIN FT
$140.70
966
966
0
$135,916.20
98
2503.541
24" PVC ?IPE SEWER DESIGN PRESSURE - DR 25
LIN FT
$98.90
1710
1772
0
$175,250.80
99
2503.603
8" PVC PIPE SEWER - SDR 26
LIN FT
$25.00
49
49
0
$1,225.00
100
2503.603
36" STEEL CASING PIPE (JACKED)
LIN FT
$1,000.00
342
342
0
$342,000.00
101
2503.603
SANITARY SEWER INSPECTION (TELEVISING)
LIN FT
$1.10
57861
3781
0
$4,159.10
102 12506.6031
CONST 48" DIA SAN SEWER MANHOLE
LIN FT
$90.001
6061
397.81
0
$35,802.90
Totals For Section SCHEDULE C - SANITARY SEWER IMPROVEMENTS:
$844,986.48
SCHEDULE D - MCES SANITARY SEWER IMPROVEMENTS
103
2021.501
MOBILIZATION (2 %)
LUMP SUM
$7,000.00
1
1
0
$7,000.00
104
2104.501
REMOVE SEWER PIPE (SANITARY)
LIN FT
$55.00
30
50
0
$2,750.00
105
2104.525
ABANDON MANHOLE
EACH
$850.00
3
3
0
$2,550.00
106
2104.603
ABANDON PIPE SEWER- SANITARY
LIN FT
$6.70
1255
1255
0
$8,408.50
107
2451.602
GRANULAR FOUNDATION AND /OR BEDDING
TON
$0.01
500
0
0
$0.00
108
2503.511
24" SANITARY PIPE SEWER
LIN FT
$136.00
1127
1136
0
$154,496.00
109
2503.511
30" SANITARY PIPE SEWER
LIN FT
$199.50
195
195
0
$38,902.50
110
2503.601
SANITARY SEWER BYPASS PUMPING
LUMP SUM
$15,000.00
1
1
0
$15,000.00
111
2503.601
COORDINATE CONNECTIONS AND DIVERSION OF SEWAGE
LUMP SUM
$1,350.00
1
1
0
$1,350.00
112
2503.602
CONNECT TO EXISTING SANITARY SEWER
EACH
$10,000.00
2
2
0
$20,000.00
113
2503.603
18" OUTSIDE DROP
LIN FT
$1,930.00
5.5
4.5
0
$8,685.00
114
2503.603
18" DUCTILE IRON PIPE SEWER CL 52
LIN FT
$174.30
20
20
0
$3,486.00
115
2503.603
SANITARY SEWER INSPECTION (TELEVISING)
LIN FT
$1.10
1322
1330
0
$1,463.00
116
2506.601
CONTROL STRUCTURE
LUMP SUM
$145,000.00
1
1
0
$145,000.00
117
2506.602
CASTING ASSEMBLY (SANITARY)
EACH
$710.00
3
4
0
$2,840.00
118
2506.603
CONST 48" DIA SAN SEWER MANHOLE
LIN FT
$280.00
37.8
37.53
0
$10,508.40
119
2506.603
CONST 60" DIA SAN SEWER MANHOLE
LIN FT
$345.00
24.2
24.48
0
$8,445.60
120
2506.603
CONST 72" DIA SAN SEWER MANHOLE
LIN FT
$385.00
28.3
28.32
0
$10,903.20
121
2540.602
BOLLARD
EACH
$315.00
5
5
0
$1,575.00
Totals For Section SCHEDULE D - MCES SANITARY SEWER IMPROVEMENTS:
$443,363.20
SCHEDULE E - TRUNK WATER MAIN IMPROVEMENTS
122
2104.521
SALVAGE WATER MAIN
LIN FT
$9.00
40
40
0
$360.00
123
2451.602
GRANULAR FOUNDATION AND /OR BEDDING
TON
$0.01
500
0
0
$0.00
124
2504.602
CONNECT TO EXISTING WATER MAIN
EACH
$1,000.00
1
1
0
$1,000.00
125
2504.602
HYDRANT
EACH
$2,620.00
10
8
0
$20,960.00
126
2504.602
6" GATE VALVE AND BOX
EACH
$870.001
10
8
0
$6,960.00
127
2504.60218'
GATE VALVE AND BOX
EACH
$1,165.00
9
6
0
$6,990.00
128
2504.602112'
GATE VALVE AND BOX
EACH
$1,960.00
11
6
0
$11,760.00
129
2504.602
16" GATE VALVE AND BOX
EACH
$5,500.00
1
0
0
$0.00
130
2504.603
VALVE BOX EXTENSION
LIN FT
$62.00
22
13
0
$806.00
131
2504.603
INSTALL SALVAGED WATER MAIN
LIN FT
$13.00
40
0
0
$0.00
132
2504.603
6" WATER MAIN -DUCT IRON CL 52
LIN FT
$24.60
222
185
0
$4,551.00
133
2504.603
8" WATER MAIN -DUCT IRON CL 52
LIN FT
$30.50
614
455
0
$13,877.50
134
2504.603112-
WATER MAIN -DUCT IRON CL 52
LIN FT
$45.60
5278
3883
0
$177,064.80
135
2504.603
16" WATER MAIN -DUCT IRON CL 52
LIN FT
$65.30
100
0
0
$0.00
136
2504.603
VALVE STEM EXTENSION
LIN FT
$42.00
22
0
0
$0.00
137
2504.604
4" POLYSTYRENE INSULATION
SQ YD
$24.701
30
0
0
$0.00
138
2504.608
DUCTILE IRON FITTINGS
POUND
$1.101
8500
10639
0
$11,702.90
Page 4 of 9
Item
No.
Item
Description
Units
Unit Price
Contract
Quantity
Quantity to
Date
Current
Quantity
Amount to
Date
139
2545.602
HANDHOLE
EACH
$495.00
13
13
0
$6,435.00
140
2550.603
2" FLEXIBLE NON- METALLIC CONDUIT
LIN FT
$2.40
5760
3926
0
$9,422.40
Totals For Section SCHEDULE E - TRUNK WATER MAIN IMPROVEMENTS:
$271,889.60
SCHEDULE F - TRUNK RAW WATER MAIN IMPROVEMENTS
141
2104.521
SALVAGE WATER MAIN
LIN FT
$11.00
50
0
0
$0.00
142
2451.602
GRANULAR FOUNDATION AND /OR BEDDING
TON
$0.01
1000
0
0
$0.00
143
2504.602
CONNECT TO EXISTING WATER MAIN
EACH
$1,000.00
1
0
0
$0.00
144
2504.602
6" GATE VALVE AND BOX
EACH
$870.00
1
0
0
$0.00
145
2504.602
12" GATE VALVE AND BOX
EACH
$1,960.00
1
0
0
$0.00
146 12504.602
16" GATE VALVE AND BOX
EACH
$5,500.00
3
0
0
$0.00
147
2504.602
HYDRANT, TYPE BLOW -OFF
EACH
$2,760.00
1
0
0
$0.00
148
2504.603
VALVE BOX EXTENSION
LIN FT
$62.00
12
0
0
$0.00
149
2504.603
INSTALL SALVAGED WATER MAIN
LIN FT
$16.00
50
0
0
$0.00
150
2504.603
6" WATER MAIN -DUCT IRON CL 52
LIN FT
$24.60
18
01
0
$0.00
151
2504.603112'
WATER MAIN -DUCT IRON CL 52
LIN FT
$45.601
90
0
0
$0.00
152
2504.603
16" WATER MAIN -DUCT IRON CL 52
LIN FT
$62.80
1625
0
0
$0.00
153
2504.603
VALVE STEM EXTENSION
LIN FT
$42.00
12
0
0
$0.00
154
2504.604
4" POLYSTYRENE INSULATION
SQ YD
$25.00
10
0
0
$0.00
155
2504.608
DUCTILE IRON FITTINGS
POUND
$1.70
6000
0
0
$0.00
156 12550.512
HANDHOLE
EACH
$495.00
4
01
0
$0.00
157
12550.60312'
FLEXIBLE NON - METALLIC CONDUIT
LIN FT
$2.40
20001
01
0
$0.00
Totals For Section SCHEDULE F - TRUNK RAW WATER MAIN IMPROVEMENTS:
$0.00
SCHEDULE G - TRUNK STORM SEWER IMPROVEMENTS
158
2501.515
15" RC PIPE APRON WITH TRASH GUARD
EACH
$575.00
2
2
0
$1,150.00
159
2503.541
15" RC PIPE SEWER DESIGN 3006 CLASS V
LIN FT
$21.00
122
119
0
$2,499.00
160
2503.541
24" RC PIPE SEWER DESIGN 3006 CLASS V
LIN FT
$44.00
75
75
0
$3,300.00
161
2503.541
36" RC PIPE SEWER DESIGN 3006 CLASS V
LIN FT
$78.50
138
136
0
$10,676.00
162
2503.541
36" RC PIPE SEWER DESIGN 3006 CLASS V- JACKED
LIN FT
$1,090.00
120
120
0
$130,800.00
163
2503.602
CONSTRUCT BULKHEAD
EACH
$1,290.001
1
1
0
$1,290.00
164
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 -4020
LIN FT
$212.001
5.9
6.2
0
$1,314.40
165
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 60 -4020
LIN FT
$186.00
14.7
14.9
0
$2,771.40
166
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 72 -4020
LIN FT
$226.00
19.7
19.62
0
$4,434.12
167
2506.516
CASTING ASSEMBLY (MANHOLE)
EACH
$600.00
1
1
0
$600.00
168
2506.602
CASTING ASSEMBLY (CATCHBASIN)
EACH
$455.00
2
2
0
$910.00
169
2511.501
RAND(:)M RIPRAP CLASS III
CU YD
$78.00
25
17.18
0
$1,340.04
170
2511.515
GEOTEXTILE FILTER TYPE IV
SQ YD
$2.00
15
15
0
$30.00
171
2540.601
RAILROAD CROSSING
LUMP SUM
$2,300.001
1
1
0
$2,300.00
Totals For Section SCHEDULE G - TRUNK STORM SEWER IMPROVEMENTS:
$163,414.96
Change Order 1
172 2503.601 TCONN I =CT TO EXISTING SANITARY SEWER I LUMP SUM $22,448.37 1 1 1 0
$22,448.37
Totals For Change Order 1:
$22,448.37
Change Order 2
173
2104.523
SALVAGE SIGN
EACH
($15.00)
2
0
0
$0.00
174
2104.619
SALVAGE UNCLASSIFIED MATERIAL
ROAD STA
($270.00)
16
0
0
$0.00
175
2105.619
UNCLASSIFIED MATERIAL PLACEMENT
ROAD STA
($162.00)
16
0
0
$0.00
176
2112.501
SUBGRADE PREPARATION
ROAD STA
($140.00)
16
0
0
$0.00
177
2211.607
AGGREGATE BASE SPECIAL (CV)
CU YD
($6.00)
1000
0
0
$0.00
178
2564.602
INSTALL SIGN
EACH
($85.00)
2
01
0
$0.00
179
2573.502
SILT FENCE, TYPE MACHINE SLICED
LIN FT
($1.55)
3475
01
0
$0.00
180
2573.5401
FILTER LOG TYPE WOOD FIBER BIOROLL
LIN FT
($2.95)
100
01
0
$0.00
Page 5 of 9
Item No.
Item
Description
Units
Unit Price
Contract Quantity
Quantity to Date
Current Quantity
Amount to Date
181
2575.501
SEEDING
ACRE
($125.00)
4.5
0
0
$0.00
182
2575.502
SEED MIXTURE 250
POUND
($2.60)
315
0
0
$0.00
183
2575.511
MULCH MATERIAL TYPE 1
TON
($150.00)
9
0
0
$0.00
184
2575.519
DISK ANCHORING
ACRE
($65.00)
4.5
0
0
$0.00
185
2575.532
COMMERCIAL FERTILIZER ANALYSIS 23 -0 -23
POUND
($0.55)
900
0
0
$0.00
186
2503.541
8" PVC PIPE SEWER DESIGN PRESSURE -DR 18
LIN FT
($118.50)
383
0
0
$0.00
187
2503.541
20" PVC PIPE SEWER DESIGN PRESSURE - DR 18
LIN FT
($159.60)
1645
0
0
$0.00
188
2503.603
SANITARY SEWER INSPECTION (TELEVISING)
LIN FT
($1.10)
1645
0
0
$0.00
189
2506.603
CONST 48" DIA SAN SEWER MANHOLE
LIN FT
($90.00)
160
0
0
$0.00
190
2504,602
HYDRANT
EACH
($2,620.00)
2
0
0
$0.00
191
2504.602
6" GATE: VALVE AND BOX
EACH
($870.00)
2
0
0
$0.00
192
2504,602
8" GATE: VALVE AND BOX
EACH
($1,165.00)
3
0
0
$0.00
193
2504.602
12" GATE VALVE AND BOX
EACH
($1,960.00)
4
0
0
$0.00
194
2504.603
6" WATERMAIN DUCTILE IRON CL 52
LIN FT
($24.60)
37
0
0
$0.00
195
2504.603
8" WATER MAIN -DUCT IRON CL 52
LIN FT
($30.50)1
200
0
0
$0.00
196
2504.603
12" WATERMAIN DUCTILE IRON CL 52
LIN FT
($45.60)1
1543
0
0
$0.00
197
2503.608
DUCTILE IRON FITTINGS
POUND
($1.10)
2950
01
0
$0.00
198
2550.512
HANDHOLE
EACH
($495.00)
3
0
0
$0.00
199
2550.603
2" FLEXIBLE NON - METALLIC CONDUIT
LIN FT
($2.40)
1750
0
0
$0.00
200
2104.501
REMOVE CURB AND GUTTER
LIN FT
($4.50)
60
0
0
$0.00
201
2104.505
REMOVE BITUMINOUS PAVEMENT
SQ YD
($3.00)
130
0
0
$0.00
202
2104.513
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)
LIN FT
($3.00)1
110
0
0
$0.00
203
2104.521
SALVAGE PIPE SEWER
LIN FT
($9.00)
115
0
0
$0.00
204
2104.523
SALVAGE PIPE APRON
EACH
($180.00)
1
0
0
$0.00
205
2104,607
SALVAGE RANDOM RIPRAP
CU YD
($18.00)
6
0
0
$0.00
206
2105.522
SELECT GRANULAR BORROW (CV)
CU YD
($15.00)
140
0
0
$0.00
207
2211.501
JAGGREGATE BASE CLASS 5
TON
($12.00)
675
0
0
$0.00
208
2350.501
TYPE MV 3 WEARING COURSE MIXTURE (C)
TON
($125.00)
30
0
0
$0.00
209
2350.502
TYPE MV 3 NON WEARING COURSE MIXTURE (B)
TON
($105.00)
30
0
0
$0.00
210
2357.502
BITUMINOUS MATERIAL FOR TACK COAT
GALLON
($3.00)
15
0
0
$0.00
211
2501.573
INSTALL PIPE APRON
EACH
($230.00)
1
0
0
$0.00
212
2503.571
INSTALL PIPE SEWER
LIN FT
($15.30)
115
0
0
$0.00
213
2511.515
1 GEOTEXTILE FILTER TYPE IV
SQ YD
($2.00)
9
0
0
$0.00
214
2511.607
INSTALL RANDOM RIPRAP
CU YD
($16.00)
6
0
0
$0.00
215
2531.501
CONCRETE CURB & GUTTER DESIGN B618
LIN FT
($26.50)
60
0
0
$0.00
216
2104.521
SALVAGE WATER MAIN
LIN FT
($9.00)
40
0
0
$0.00
217
2504.602
16" GATE VALVE AND BOX
EACH
($5,500.00)
1
0
0
$0.00
218
2504.603
INSTALL SALVAGED WATER MAIN
LIN FT
($13.00)
40
01
0
$0.00
219
2504.603116'
WATER MAIN -DUCT IRON CL 52
LIN FT
($65.30)
100
01
0
$0.00
220
2104.521
SALVAGE WATER MAIN
LIN FT
($11.00)1
50
01
0
$0.00
221
2451.602
GRANULAR FOUNDATION AND /OR BEDDING
TON
($0.01)
1000
0
0
$0.00
222
2504.602
CONNECT TO EXISTING WATER MAIN
EACH
($1,000.00)
1
0
0
$0.00
223
2504.602
6" GATE VALVE AND BOX
EACH
($870.00)
1
0
0
$0.00
224
2504.602
12" GATE VALVE AND BOX
EACH
($1,960.00)
1
0
0
$0.00
225
2504.602
16" GATE VALVE AND BOX
EACH
($5,500.00)
3
0
0
$0.00
226
2504.602
HYDRANT, TYPE BLOW -OFF
EACH
($2,760.00)
1
01
0
$0.00
227
2504.603
VALVE: BOX EXTENSION
LIN FT
($62.00)
12
01
0
$0.00
228
2504.603
INSTALL SALVAGED WATER MAIN
LIN FT
($16.00)
50
0
0
$0.00
229
2504.603
6" WATER MAIN -DUCT IRON CL 52
LIN FT
($24.60)
18
0
0
$0.00
230
12504.603
12" WATER MAIN -DUCT IRON CL 52
LIN FT
($45.60)
90
0
0
$0.00
Page 6 of 9
Item No.
Item
Description
Units
Unit Price
Contract Quantity
Quantity to Date
Current Quantity
Amount to Date
231
2504.603
16" WATER MAIN -DUCT IRON CL 52
LIN FT
($62.80)
1625
0
0
$0.00
232
2504.603
VALVE STEM EXTENSION
LIN FT
($42.00)
12
0
0
$0.00
233
2504.604
4" POLYSTYRENE INSULATION
SQ YD
($25.00)
10
0
0
$0.00
234
2504.608
DUCTILE IRON FITTINGS
POUND
($1.70)
6000
0
0
$0.00
235
2550.512
HANDHOLE JEACH
1
($495.00)1
41
01
0
$0.00
236 12550.60312'
FLEXIBLE NON - METALLIC CONDUIT ILIN
FT 1
($2.40)1
20001
01
0
$0.00
Totals For Change Order 2:
$0.00
Change Order 3
237
2104.523
SALVAGE SIGN
EACH
$15.00
2
2
0
$30.00
238
2104.619
SALVAGE UNCLASSIFIED MATERIAL
ROAD STA
$270.00
16
16
0
$4,320.00
239
2105.619
UNCLASSIFIED MATERIAL PLACEMENT
ROAD STA
$162.00
16
16
0
$2,592.00
240
2112.501
SUBGRADE PREPARATION
ROAD STA
$140.00
16
16
0
$2,240.00
241
2211.607
AGGREGATE BASE SPECIAL (CV)
CU YD
$6.00
1000
1000
0
$6,000.00
242 12564.602
INSTALL. SIGN
EACH
$85.001
2
0
0
$0.00
243
2573.502
SILT FENCE, TYPE MACHINE SLICED
LIN FT
$1.55
3475
4237
0
$6,567.35
244
2573.540
FILTER LOG TYPE WOOD FIBER BIOROLL
LIN FT
$2.95
100
0
0
$0.00
245
2575.501
SEEDING
ACRE
$125.00
4.5
4.5
0
$562.50
246
2575.502
SEED MIXTURE 250
POUND
$2.60
315
300
0
$780.00
247
2575.511
MULCH MATERIAL TYPE 1
TON
$150.00
9
8.44
0
$1,266.00
248
2575.519
DISK ANCHORING
ACRE
$65.00
4.5
4.5
0
$292.50
249
2575.532
COMMERCIAL FERTILIZER ANALYSIS 23 -0 -30
POUND
$0.55
900
900
0
$495.00
250
2503.541
8" PVC PIPE SEWER DESIGN PRESSURE - DR 18
LIN FT
$118.50
383
385
0
$45,622.50
251
2503.541
20" PVC: PIPE SEWER DESIGN PRESSURE - DR 18
LIN FT
$159.60
1645
1655
0
$264,138.00
252
2503.603
SANITARY SEWER INSPECTION (TELEVISING)
LIN FT
$1.10
1645
2051
0
$2,256.10
253
2506.603
CONST 48" DIA SAN SEWER MANHOLE
LIN FT
$90.001
160
197.03
0
$17,732.70
254
2504.602
HYDRANT
EACH
$2,620.00
2
2
0
$5,240.00
255
2504.602
6" GATE VALVE AND BOX
EACH
$870.00
2
2
0
$1,740.00
256
2504.602
8" GATE VALVE AND BOX
EACH
$1,165.00
3
3
0
$3,495.00
257
2504.602
12" GATE VALVE AND BOX
EACH
$1,960.00
4
4
0
$7,840.00
258
2504.603
6" WATER MAIN -DUCT IRON CL 52
LIN FT
$24.60
37
35
0
$861.00
259
2504.603
8" WATER MAIN -DUCT IRON CL 52
LIN FT
$30.50
200
200
0
$6,100.00
260
2504.603
12" WATER MAIN -DUCT IRON CL 52
LIN FT
$45.60
1543
1540
0
$70,224.00
261
2503.608
DUCTILE IRON FITTINGS
POUND
$1.10
2950
2825
0
$3,107.50
262
2550.512
HANDHOLE
EACH
$495.00
3
3
0
$1,485.00
263
2550.60312'
FLEXIBLE NON - METALLIC CONDUIT
LIN FT
$2.40
1750
1805
0
$4,332.00
264
2021.501
MOBILIZATION
LUMP SUM
$27,750.001
1
1
0
$27,750.00
265
2104.501
REMOVE CURB AND GUTTER
LIN FT
$4.50
60
10
0
$45.00
266
2104.505
REMOVE BITUMINOUS PAVEMENT
SQ YD
$3.00
130
92
0
$276.00
267
2104.513
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)
LIN FT
$3.00
110
40
0
$120.00
268
2104.521
SALVAGE PIPE SEWER
LIN FT
$9.00
115
100
0
$900.00
269
2104.523
1 SALVAGE PIPE APRON
EACH
$180.00
1
1
0
$180.00
270
2104.607
SALVAGE RANDOM RIPRAP
CU YD
$18.001
6
6
0
$108.00
271
2105.522
SELECT GRANULAR BORROW (CV)
CU YD
$15.00
140
116.54
0
$1,748.10
272
2211.501
AGGREGATE BASE CLASS 5
TON
$12.00
675
675
0
$8,100.00
273
2350.501
TYPE MV 3 WEARING COURSE MIXTURE (C)
TON
$125.00
30
0
0
$0.00
274
2350.502
TYPE MV 3 NON WEARING COURSE MIXTURE (B)
TON
$105.00
30
0
0
$0.00
275
2357.502
BITUMINOUS MATERIAL FOR TACK COAT
GALLON
$3.00
15
0
0
$0.00
276
2501.573
INSTALL PIPE APRON
EACH
$230.00
1
1
0
$230.00
277
2503.571
INSTALL PIPE SEWER
ILIN FT
$15.30
1151
100
0
$1,530.00
278
2511.515
GEOT'EXTILE FILTER TYPE IV
JSQYD
$2.00
91
01
0 $0.00
Page 7 of 9
Item No.
Item
Description
Units
Unit Price
Contract Quantity
Quantity to Date
Current Quantity
Amount to Date
279
2511.607
INSTALL RANDOM RIPRAP
CU YD
$16.00
6
0
0
$0.00
280
2531.501
CONCRETE CURB & GUTTER DESIGN B618
LIN FT
$26.50
60
0
0
$0.00
281
2104.521
SALVAGE WATER MAIN
LIN FT
$9.00
40
158
0
$1,422.00
282
2504.602
16" GATE VALVE AND BOX
EACH
$5,500.00
1
1
0
$5,500.00
283
2504.603
INSTALL SALVAGED WATER MAIN
LIN FT
$13.00
40
163
0
$2,119.00
284
2504.603
16" WATER MAIN -DUCT IRON CL 52
LIN FT
$65.30
100
120
0
$7,836.00
285
2104.521
SALVAGE WATER MAIN
LIN FT
$11.00
50
60
0
$660.00
286
2451.602
GRANULAR FOUNDATION AND /OR BEDDING
TON
$0.01
1000
0
0
$0.00
287
2503.602
CONNECT TO EXISTING SANITARY SEWER
EACH
$10,000.00
1
1
0
$10,000.00
288
12504.602
CONNECT TO EXISTING WATER MAIN
EACH
$1,000.001
1
2
0
$2,000.00
289
2504.602
6" GATE. VALVE AND BOX
EACH
$870.00
1
2
0
$1,740.00
290
2504.602
12" GATE VALVE AND BOX
EACH
$1,960.00
1
0
0
$0.00
291
2504.602
16" GATE VALVE AND BOX
EACH
$5,500.00
3
4
0
$22,000.00
292
2504.602
HYDRANT, TYPE BLOW -OFF
EACH
$2,760.00
1
2
0
$5,520.00
293
2504.603
IVALVE 13OX EXTENSION
LIN FT
$62.00
12
4
0
$248.00
294
2504.603
INSTALL SALVAGED WATER MAIN
LIN FT
$16.00
50
41
0
$656.00
295
2504.603
6" WATER MAIN -DUCT IRON CL 52
LIN FT
$24.60
18
38
0
$934.80
296
2504.603
12" WATER MAIN -DUCT IRON CL 52
LIN FT
$45.60
90
0
0
$0.00
297
2504.603
16" WA'rER MAIN -DUCT IRON CL 52
LIN FT
$62.80
1625
1640
0
$102,992.00
298
2504.603
VALVE STEM EXTENSION
LIN FT
$42.00
12
0
0
$0.00
299
2504.60414"
POLYSTYRENE INSULATION
SO YD
$25.001
10
0
0
$0.00
300
2504.608
1 DUCTILE IRON FITTINGS
POUND
$1.70
6000
4578
0
$7,782.60
301
2550.512
HANDHOLE
EACH
$495.00
4
4
0
$1,980.00
302
2550.603
2" F .IBLE NON - METALLIC CONDUIT
LIN FT
$2.40
2000
2055
0
$4,932.00
303
2563.601
TRAFFIC CONTROL
ILUMP SUM
$8,000.00
1
1
0
$8,000.00
Totals For Change Order 3:
$686,628.65
Change Order 4
304 12503.6011 SANITARY SEWER MANHOLE LADDER EXTENSION I LUMP SUM 1 $2,271.54 11 11 1
$2,271.54
Totals For Change Order 4:
$2,271.54
Project Totals:
$3,234,348.02
Page 8 of 9
Project Payment Status
Owner: City of Rosemount
Client Project No.: 417
Client Contract No.:
Project No.: 01668 -30
Contractor: Latour Construction
Contract Changes
No.
Type
Date
Description
Amount
C01
Change
Order
1/9/2009
CONNECT TO EXISTING SANITARY SEWER
$22,448.37
CO2
Change
Order
5/19/2009
Reduce item quantities and deleted items.
($638,891.55)
$16,019.39
$16,019.39
$372,093.40
$320,387.80
$320,387.80
CO3
Change
2/1/2010
The addition of work north of Bonaire Path previously deleted due to lack of adequate
$684,641.55
$2,209.55
Order
$416,284.48
easement area to construct the improvements.
$364,578.88
C04
Change
Order
9/14/2010
Ladder Extension
$2,271.54
Change Order Totals:
$70,469.91
Payment Summary
No.
From
Date
To Date
Payment
Total
Payment
Retainage
Per Payment
Total
Retainage
Total
Payment +
Retainage
Work
Certified Per
Payment
Total Work
Certified
1
9/1/2008
10/31/2008
$356,074.01
$356,074.01
$16,019.39
$16,019.39
$372,093.40
$320,387.80
$320,387.80
2
11/1/200811/30/2008
$41,981.53
$398,055.54
$2,209.55
$18,228.94
$416,284.48
$44,191.08
$364,578.88
3
12/1/2008
2/10/2009
$21,325.95
$419,381.49
$1,122.42
$19,351.36
$438,732.85
$22,448.37
$387,027.25
4
3/1/2009
3/31/2009
$221,998.63
$641,380.12
$2,872.37
$22,223.73
$663,603.85
$57,447.40
$444,474.65
5
4/112009
5/30/2009
$331,533.58
$972,913.70
$28,982.25
$51,205.98
$1,024,119.68
$390,631.53
$835,106.18
6
5/1/2009
5/31/2009
$565,126.301$1,538,040.00
$21,449.48
$72,655.461$1,610,695.46
$618,002.92
$1,453,109.10
7
6/1/2009
6/30/2009
$475,988.18
$2,014,028.18
$33,346.02
$106,001.48
$2,120,029.66
$666,920.56
$2,120,029.66
8
7/1/2009
8/31/2009
$228,580.84
$2,242,609.02
$12,030.57
$118,032.05
$2,360,641.07
$240,611.41
$2,360,641.07
9
9/1/2009
9/16/2009
$125,106.10
$2,367,715.12
$6,584.54
$124,616.59
$2,492,331.71
$131,690.64
$2,492,331.71
10
9/17/200919/30/2009
$47,354.77
$2,415,069.89
$2,492.35
$127,108.94
$2,542,178.83
$49,847.12
$2,542,178.83
11
10/1/2009
11/30/2009
$103,679.94
$2,518,749.83
($102,108.94)
$25,000.00
$2,543,749.83
$1,571.00
$2,543,749.83
12
3/1/2010
5/12/2010
$235,603.66
$2,754,353.49
$12,400.19
$37,400.19
$2,791,753.68
$248,003.85
$2,791,753.68
13
5/13/2010
6/8/2010
$406,468.33
$3,160,821.82
$21,393.07
$58,793.26
$3,219,615.08
$427,861.40
$3,219,615.08
14
6/9/2010
6/30/2010
$66,254.66
$3,227,076.48
($53,793.26)
$5,000.00
$3,232,076.48
$12,461.40
$3,232,076.48
15 &
FINAL
8/1/2010
8/31/2010
$7,271.54
$3,234,348.02
($5,000.00)
$0.00
$3,234,348.02
$2,271.54
$3,234,348.02
Payment Totals:
$3,234,348.02
$0.00
$3,234,348.02
$3,234,348.02
Project Summary
Material On Hand:
Total Payment to Date:
Total Retainage:
Total Amount Earned:
$0.00
$3,234,348.02 Original Contract:
$0.00 Contract Changes:
$3,234,348.02 Revised Contract:
Page 9 of 9
$3,102,181.66
$70,469.91
$3,172,651.57