HomeMy WebLinkAbout6.h. Partial Payment #4 - County Road 73 Improvements, City Project #3994ROSEMOUNTEXECUTIVE SUMMARY CITY COUNCIL City Council Meeting: August 17, 2010 AGENDA ITEM: Partial Payment #4 — County Road 73 AGENDA SECTION: Improvements, City Project #399 Consent VPREPARED BY: Andrew J. Brotzler, PE, Director of Public I AGENDA NO. W Works / City Engineer ATTACHMENTS: Partial Payment #4 APPROVED BY: RECOMMENDED ACTION: Motion to Approve Partial Payment #4 for the County Road 73 Improvements, City Project #399. BACKGROUND: Attached for Council consideration is Partial Payment #4 for the County Road 73 Improvements, City Project #399. Major items of work completed on this pay voucher include concrete curb and gutter installation and roadway paving. This pay voucher also includes negotiated compensation for additional work identified as necessary during construction as Work Orders for Minor Extra Work. Work Order No. 1 includes storm sewer modifications to eliminate conflicts with existing underground sanitary sewer between storm sewer structures 5037 and 5037A. Work Order No. 2 includes additional work to remove a temporary invert within an existing storm sewer structure for connection with permanent infrastructure. These changes result in a next increase of $12,145.81,31% of the original contract amount, for a revised contract amount of $2,371,110.06. Both Work Orders included in Construction Pay Voucher No. 4 have been approved by Mn /DOT Estimating and are anticipated to be eligible for federal funding. SUMMARY: Staff recommends Council approval of Partial Payment #4 for the County Road 73 Improvements, City Project #399. G: \ENGPROJ \399 \20100817 CC Partial Payment 4.doc AUG.12.2010 12:51PM 7632877180 WSB Engineering ■ Planning ■ Environmental ■ Construction � A.ctociclrr. 1'nc. 9 9 0 August 11, 2010 Mr. Andy Brotzler, PE City Engineer City of Rosemount 2875 —145`h Street West Rosemount, MN 55068 Re: Construction Pay Voucher No. 4 County Road 73 Street and Utility improvements S.P. 208 - 080 -01 / Minn. Project No. ES 10 ES(027) Dalcota County Project No. 73 -08 City of Rosemount, City Project No. 399 WSB Project No. 1556 -59 Dear Mr. Brotzler. N0. 5798 P. 1 701 Xenia Avenue South Suite 300 Minneapolis, MN 56416 Tel: 763 - 541 -4600 Fax: 763 -641 -1700 Please find enclosed Construction Pay Voucher No. 4 in the amount of $595,849.79 for the above - referenced project. Major items of work completed during July included concrete curb and gutter installation and roadway paving. Construction Pay Voucher No. 4 includes negotiated compensation for additional work identified as necessary during construction as Work Orders for Minor Extra Work. Work Order No. 1 includes storm sewer modifications to eliminate conflicts with existing underground sanitary sewer between storm sewer structures 5037 and 5037A. Work Order No. 2 includes additional work to remove a temporary invert within an existing storm sewer structure for connection with permanent infrastructure. These changes result in a net increase of $12,145.81, 6.51% of the original contract amount, for a revised contract amount of $2,371,110.06. Both Work Orders included in Construction Pay Voucher No. 4 have been approved by Mn/DOT Estimating and are anticipated to be eligible for federal funding. The quantities completed to date have been reviewed and agreed upon by the contractor, and we hereby recommend that the City of Rosemount approve Construction Pay Voucher No. 4 for Ryan Contracting Co. If you have any questions or comments regarding the enclosed, please contact me at 763 -287 -7173. Sincerely, WSB & Associates, Inc. Morgan awley, E Project ager Enclosures cc: Cindy Dorniden, City of Rosemount Thomas Ryan, Ryan Contracting Co. tsf K WI536391nOw�COameoYOn ndnlnLL9y wacbeol.1k VO4 Cl'Ya pr Ww4tl 00 dw Owner: City of Rosemount 2875 145th Street West WSBRosemount, MN 55068 -4941 For Period: 7/1/2010 to 7/3112010 Contractor: Ryan Contracting Co. ��� 26350 France Avenue Associates, Inc. Elko, MN 55020 Pay Voucher Rsmt - CR 73 Improvements Client Contract No.: Project No.: 01556 -59 Client Project No.: 399 Date: 7/27/2010 Request No.: 4 Project Summary 1 Original Contract Amount $2,358,964.25 2 Contract Changes - Addition $12,145.81 3 Contract Changes - Deduction $0.00 4 Revised Contract Amount $2,371,110.06 5 Value Completed to Date $1,691,518.54 6 Material on Hand $0.00 7 Amount Earned $1,691,518.54 8 Less Retainage 5% $84,575.93 9 lSubtotal $1,606,942.61 10 Less Amount Paid Previously $1,011,092.82 11 Liquidated Damages $0.00 12 AMOUNT DUE THIS PAY VOUCHER NO.4 $595,849.79 THIS IS TO CERTIFY THAT THE ITEMS OF WORK SHOWN IN THIS CERTIFICATE OF PARTIAL PAYMENT HAVE BEEN ACTUALLY FINISHED FOR THE WORK COMPRISING THE ABOVE MENTIONED PROJECTS IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS HERETOFORE APPROVED. Recommended for Approval by: WSB & Associates, Inc. Approved by Contractor: Ryan Contracting Co. Specified Contract Completion Date: 11/24/2010 Comment: Recommended for Approval by: Project Manager Construction Observer: Approved by Owner: City of Rosemount Date: Recommended for Approval by: Dakota County Page 1 of 5