Loading...
HomeMy WebLinkAbout6.f. Receive Bids/Award Contract-Rosewood Village3rd Addition Street and Utility Improvements, City Project #429ROSEMOLINTEXECUTIVE SUMMARY CITY COUNCIL City Council Meeting: August 17, 2010 AGENDA ITEM: Receive Bids /Award Contract - Rosewood AGENDA SECTION: Village 3d Addition Street and Utility Consent Improvements, City Projects #429 PREPARED BY: Andrew J. Brotzler, PE, Director of Public AGENDA NO. Works / City Engineer ATTACHMENTS: Resolution; Bid Tab; Letter of APPROVED BY: Recommendation; Map RECOMMENDED ACTION: Motion to Adopt a Resolution Receiving Bids and Awarding the Contract for the Rosewood Village 3rd Addition Street and Utility Improvements, City Projects #429. ISSUE: Receive bids and award contract for the Rosewood Village 3rd Addition Street and Utility Improvements, City Projects #429. BACKGROUND: On Tuesday, August 10, 2010, bids for this project were received and read aloud publicly. LOCATION The Rosewood Village 3d Addition is the next phase of the Rosewood development and is comprised of 6 detached townhome lots surrounded by common open space, oudots for the adjacent railroad spur and stormwater pond, and an additional lot for future development. PROPOSEDIMPROVEMENTS The proposed improvements include the construction of a private street and cul -de -sac that includes concrete curb and gutter. An additional private roadway is proposed to be extended west from the cul -de- sac to provide an emergency access for the property west of the Rosewood Village 3rd Addition. Utility improvements include the construction of water main, sanitary sewer, and storm sewer. COST AND FUNDING After verification of bids received, the low bidder is Ryan Contracting Company in the amount of $83,453.30. All costs associated with this project will be funded by the developer, KJ Walk, Inc. SUMMARY: Staff recommends that Council adopt the attached resolution receiving the bids and awarding the contract for the Rosewood Village 3rd Street and Utility Improvements, City Project #428. G: \ENGPROJ \429 \08172010 CC RecBid- AwardContractdoc CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2010 — A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR THE ROSEWOOD VILLAGE 3RD STREET AND UTILITY IMPROVEMENTS CITY PROJECT #429 WHEREAS, the City Council authorized the City Engineer to advertise for bids. BE IT FURTHER RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: All bids on construction of Rosewood Village 3rd Street and Utility Improvements have been received and tabulated. The bid of Ryan Contracting Company from Elko, Minnesota, in the amount of $83,453.30 for the construction of said improvements is in accordance with the plans and specifications and advertisement for bids, and is the lowest responsible bid and shall be and hereby is accepted. 2. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 3. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of the successful bidder and the next two lowest bidders shall be retained until a contract has been executed. ADOPTED this 17`' day of August, 2010. William H. Droste, Mayor ATTEST: Amy Domeier, City Clerk PROJECT: Rosewood Village 3rd Addition Street and Utility Construction LOCATION: City of Rosemount, MN WSB PROJECT NO.: 1916 -08 Bids Opened: Tuesday, August 10, 2010 at 10:00 a.m. Contractor Bid Security (5 %) Grand Total Bid 1 Ryan Contracting Company X $83,453.30 2 Hydrocon, Inc. X $101,664.00 3 Northwest Asphalt, Inc. X $103,780.22 4 Minnesota Dirt Works, Inc. X $106,674.00 5 Friedges Contracting Co., LLC X $109,458.50 6 Burschville Construction, Inc. X 7 Hennen Construction Co., Inc. X $115,130.10 Engineer's Opinion of Cost $78,070.00 I hereby certify that this is a true and correct tabulation of the bids as received on August 10, 2010. Phil Olson, PE _ Denotes corrected figure K.101916-08UI MWConstructlon Admin11916-08 Bid Tab Summary WSB - Engineering Planning Environmental Construction & Associates, Inc. August 10, 2010 Honorable Mayor and City Council City of Rosemount 2875 — 145th Street West Rosemount, MN 55068 Attn: Cindy Dorniden Re: Rosewood Village 3rd Addition Street and Utility Construction City of Rosemount Project No. 429 WSB Project No. 1916 -08 Dear Mayor and Council Members: 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763 -541 -4800 Fax: 763 - 541 -1700 Bids were received for the above - referenced project on Tuesday, August 10, 2010, and were opened and read aloud. A total of seven bids were received. The bids were checked for mathematical accuracy and tabulated. Please find enclosed the bid tabulation indicating the low bidder as Ryan Contracting Company, Elko, Minnesota, in the amount of $83,453.30. We recommend that the City Council consider these bids and award a contract to Ryan Contracting Company, based on the results of the bids received. Sincerely, WSB & Associates, Inc. ;h;il Olson, �PE Project Manager Enclosures cc: Ryan Contracting Company Andy Brotzler, City of Rosemount tsf Minneapolis ❑ St. Cloud Equal Opportunity Employer KA01918- 08WdmiMConstmction AdminLLTR RECMMDTN- hmcc-081010.doc 441 j W :)T F� Erickson Park Central I P p w ,r/ > 145TH ST z Co 0 287.5 575 1,150 1,725 T:/GIS/City/Maps/Departmental Maps/Engineedng/Chris/Rosewood Village 3rd Locate D MC)SEMOUN a LT T PUBLIC WORKS DEPA Uj Z! BELFAST, -- MM r 2,300 M Feet i m mm lQ,u 1 4 July 2010