Loading...
HomeMy WebLinkAbout6.r. Payment #2 & Final - Downtown Sidewalk Improvements, ENG 149AGENDA ITEM: Payment #2 Final Downtown Sidewalk Improvements, ENG 149 AGENDA SECTION: Consent PREPARED BY: Andrew J. Brotzler, PE, Director of Public Works City Engineer AGENDA NO. to.Y. ATTACHMENTS: Payment #2 Final APPROVED BY: DpJ RECOMMENDED ACTION: Motion to Approve Payment #2 and Final to Midwest Concrete Specialties, Inc. for Downtown Sidewalk Improvements, ENG 149, and Accept for Perpetual Maintenance. 4 ROSEMOUNT CITY COUNCIL City Council Meeting: December 15, 2009 EXECUTIVE SUMMARY BACKGROUND: This item is on the agenda to request Payment 2 and Final in the amount of $8,532.56 to Midwest Concrete Specialties, Inc. for Downtown Sidewalk Improvements, ENG 149. This project was part of the renovation of the 145t Street West streetscape from City Hall to Cameo Avenue in Downtown. Cracked, settled, or heaved concrete in existing walkways and driveways was replaced. Missing or damaged tree grates were replaced, new trees were planted, and existing concrete benches were removed in preparation for new street furniture to be installed in spring, 2010. The final construction amount of $74,724.95 is 20.1% below the contract amount of $93,535.00. Costs associated with these improvements were funded with Dakota County Community Development Agency Redevelopment Incentive Grant money. SUMMARY: Staff recommends that Council approve Payment 2 and Final for the project and accept the project for perpetual maintenance subject to the following conditions. 1. Satisfactory showing that the contractor has complied with the provisions of Minnesota Statutes 290.92 requiring withholding state income tax. 2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the contract have been fully paid or satisfactorily secured. 3. Consent of Surety to Final Payment certification from the contractor's surety. 4. Two -year maintenance bond (warranty start date to coincide with the date Council approves final payment). G: \ENGPROJ \ENG 0149 Downtown Sidewalk Project\ 121509 CC Payment# 2&Final.doc WSB Infrastructure Engineering Planning Construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763 -541 -4800 Fax: 763 -541 -1700 December 7, 2009 Mr. Andy Brotzler City Engineer City of Rosemount 2875 145 Street West Rosemount, MN 55068 Attn: Cindy Dorniden, City of Rosemount Re: Construction Pay Voucher No. 2 (Final) Rosemount Downtown Sidewalk Project City of Rosemount Project No. ENG 149 WSB Project No. 1668 -66 Dear Mr. Brotzler: Please find enclosed the final Construction Pay Voucher No. 2 for the above referenced project in the amount of $8,532.56. Also enclosed are the following documents required for processing final payment for the above referenced project: 1. Satisfactory showing that the contractor has complied with the provisions of Minnesota Statutes 290.92 requiring withholding state income tax. 2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the contract have been fully paid or satisfactorily secured. 3. Consent of Surety to Final Payment certification from the contractor's surety. 4. Two -year Maintenance Bond (warranty start date to coincide with the date Council approves final payment). We recommend that you make final payment in the amount of $8,532.56 for Midwest Concrete Specialties, Inc. at your earliest convenience. Please contact me at 651- 322 -2724 if you have any questions or comments regarding the attached information. Thank you. Sincerely, WSB Associates, Inc. Morg Assis Enclosures r Project Manager cc: Kevin McNamara, Midwest Concrete Specialties, Inc. Cindy Dorniden, City of Rosemount Phil Olson, WSB Associates, Inc. tsf Project Summary 1 Original Contract Amount $93,535.00 2 Contract Changes Addition $0.00 3 Contract Changes Deduction $0.00 4 Revised Contract Amount $93,535.00 5 Value Completed to Date $74,724.95 6 Material on Hand $0.00 7 Amount Earned $74,724.95 8 Less Retainage $0.00 9 Subtotal $74,724.95 10 Less Amount Paid Previously $66,192.39 11 Liquidated Damages $0.00 12 AMOUNT DUE THIS PAY VOUCHER NO. 2 FINAL $8,532.56 WSB Associates, Inc. I HEREBY CERTIFY THAT A FINAL EXAMINATION HAS BEEN MADE OF THE ABOVE NOTED CONTRACT, THAT THE CONTRACT HAS BEEN COMPLETED, THAT THE ENTIRE AMOUNT OF WORK SHOWN IN THE FINAL VOUCHER HAS BEEN PERFORMED AND THE TOTAL VALUE OF THE WORK PERFORMED IN ACCORDANCE WITH, AND PURSUANT TO, THE TERMS OF THE CONTRACT IS AS SHOWN IN THIS FINAL VOUCHER. Recommended for Approval by: WSB Associates, Inc. Specified Contract Completion Date: Comment: Owner: City of Rosemount 2875145th Street West Rosemount, MN 55068 -4941 For Period: 10/1/2009 to 11/30/2009 Contractor: Midwest Concrete Specialties, Inc. 16700 Chippendale Avenue Rosemount, MN 55068 Pay Voucher RSMT Downtown,Sidewalk Project Client Contract No.: Project No.: 01668 -66 Client Project No.: Construction Observer: Approved by Owner: City R• t i Date: Date: 12/2/2009 Request No.: 2 FINAL 1 of 3 Item No. Item Description Units Unit Price Contract Quantity Quantity to Date Current Quantity Amount to Date SCHEDULE A SURFACE IMPROVEMENTS 1 2104.509 REMOVE BENCH EACH $350.00 8 8 0 $2,800.00 2 2104.523 SALVAGE TREE GRATE EACH $200.00 15 15 0 $3,000.00 3 2504.602 ADJUST MISCELLANEOUS STRUCTURES EACH $350.00 5 5 0 $1,750.00 4 2506.602 ADJUST FRAME RING CASTING EACH $275.00 6 3 0 $825.00 5 2521.618 4" CONCRETE WALK SPECIAL SQ FT $5.77 9000 7748 875 $44,705.96 6 2531.507 7" CONCRETE DRIVEWAY PAVEMENT (SPECIAL) SQ YD $79.30 350 214.3 0 $16,993.99 7 2531.618 TRUNCATED DOMES SQ FT $40.00 60 60 0 $2,400.00 8 2571.602 INSTALL TREE GRATE EACH $150.00 15 15 0 $2,250.00 Totals For SCHEDULE A SURFACE IMPROVEMENTS: $74,724.95 Project Totals: $74,724.95 Project Material Status 2 of 3 No. From Date To Date Payment Total Payment Retainage Per Payment Total Retainage Total Payment Retainage Work Certified Per Payment Total Work Certified 1 9/1/2009 9/30/2009 $66,192.39 $66,192.39 $3,483.81 $3,483.81 $69,676.20 $69,676.20 $69,676.20 2 FINAL 10/1 /2009 11/30/2009 $8,532.56 $74,724.95 ($3,483.81) $0.00 $74,724.95 $5,048.75 $74,724.95 Payment Totals: $74,724.95 $0.00 $74,724.95 $74,724.95 No. Type (Date Description Amount Change Order Totals: $0.00 Contract Changes Project Payment Status Owner: City of Rosemount Client Project No.: Client Contract No.: Project No.: 01668 -66 Contractor: Midwest Concrete Specialties, Inc. Payment Summary Project Summary Material On Hand: Total Payment to Date: Total Retainage: Total Amount Earned: $0.00 $74,724.95 $0.00 $74,724.95 Original Contract: Contract Changes: Revised Contract: $93,535.00 $0.00 $93,535.00 3 of 3 Downtown Sidewalk Project LI 0 220 440 880 1,320 1,760 Feet T:/GIS/City/Maps/Departmental Maps/Engineering/Chris/Downtown Sidewalk Locate July 2009