HomeMy WebLinkAbout6.j. Trunk Highway 3 Cooperative AgreementAGENDA ITEM: Trunk Highway 3 Cooperative Agreement
AGENDA SECTION:
Consent
PREPARED BY: Andrew J. Brotzler, PE, Director of Pub /AGENDA
Works /City Engineer
NO. e
4'
ATTACHMENTS: Resolution; Application Letter; Map
APPROVED BY:
Crip
RECOMMENDED ACTION: 1) Motion to Adopt a Resolution Requesting Funding from
MnDOT through the Municipal Agreement Program for TH 3 and Canada Avenue.
4 ROSEMOUNT
BACKGROUND:
CITY COUNCIL
City Council Meeting: September 15, 2009
1. Addition of left turn lanes on TH 3 at Canada Avenue
EXECUTIVE SUMMARY
As part of MnDOTs funding program, projects are re gularly solicited by MnDOT for improvements on
trunk highways that improve safety and operation on the trunk highway system. These locally-initiated
projects are eligible for MnDOT funding through MnDOT's Municipal Agreement Program. Municipal
agreement funding up to $500,000 of eligible construction cost is available for selected projects, plus 8%
for engineering. The deadline for FY2010 (funding available summer 2010) projects is September 28`
The submittal of applications for municipal agreement projects requires a resolution of request from the
City Council.
The following project area was identified and submitted for funding in 2008. AS the project was not
awarded funding in 2008, it is proposed to resubmit the project in 2009:
In the City's Draft Transportation Plan, there were 16 crashes identified at this intersection based
on MnDOT records. The proposed project as shown on the attached layout included the
construction of northbound and southbound left turn lanes at Canada Avenue.
The application (attached) is for the proposed improvements on TH 3 at Canada Avenue. As noted in the
application, the total estimated project cost is $549,210. Of this amount, $456,270 is requested to be
funded by MnDOT with the remaining $92,940 funded by the City.
The City's estimated cost of $92,940 will be funded with Municipal State Aid funds.
SUMMARY:
At this time, Staff is requesting Council approval of the attached resolution.
G: \ENGPROJ\ 421 \091509 CC TH33CooperativeAgreement.doc
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2009
A RESOLUTION REQUESTING FUNDING FROM Mn /DOT THROUGH THE MUNICIPAL
AGREEMENT PROGRAM FOR TH 3 AND CANADA AVENUE
WHEREAS, the City of Rosemount wishes to improve the operation and safety of the intersection at TH 3
and Canada Avenue; and,
WHEREAS, the City of Rosemount is requesting financial participation in the project from the Minnesota
Department of Transportation Mn/DOT) through the Municipal Agreement Program; and,
WHEREAS, the City of Rosemount is committed to providing the local share of the costs if the project is
selected as part of the upcoming Municipal Agreement Program; and,
NOW, THEREFORE, BE IT RESOLVED BY THE QTY COUNQL OF THE QTY OF
ROSEMOUNT, DAKOTA COUNTY, MINNESOTA.
The City of Rosemount is requesting funding from Mn/DOT for improvements to the intersection at TH 3
and Canada Avenue.
BE IT FURTHER RESOLVED, that the City Clerk is hereby authorized and directed to forward certified
copies of this resolution to Mn/DOT as directed by the City Engineer.
ADOPTED this by the City Council this 15 day of September 2009.
ATTEST:
Amy Domeier, City Clerk
William Droste, Mayor
Motion by Seconded by
Voted in favor.
Voted against:
WSB
Infrastructure Engineering Planning Construction
Xc f. suciah x. Inc
September 23, 2009
Mr. Bob Vasek, PE
Cooperative Agreement Engineer
Minnesota Dept. of Transportation
Metro Division State Aid
Waters Edge Building
1500 West County Road B2
Roseville, MN 55113
Re: TH 3 at Canada Avenue
FY 2011 Municipal Agreement Application
Rosemount, Minnesota
WSB Project No. 1668 -65
Dear Mr. Vasek:
Minneapolis is St. Cloud
Equal Opportunity Employer
701 Xenia Avenue South
Suite 300
Minneapolis, MN 55416
Tel: 763 541 -4800
Fax: 763 541 -1700
The City of Rosemount is requesting that the proposed TH 3 at Canada Avenue Improvement
Project be considered for the Fiscal Year (FY) 2011 Municipal Agreement Program.
The attached proposed layout was developed based on meetings and discussions with Mn/DOT
staff and our Municipal Agreement Submittal last year. The proposed improvement includes
widening TH 3 to provide a left -turn lane, through lane, and right -turn lane for both approaches.
The existing stop sign control for Canada Avenue will remain in place.
The City believes that this project falls within the Management Category for project selection.
This project provides safety, traffic, and geometric improvements to TH 3. The proposed project
will benefit the Trunk Highway System by providing left- and right -turn lane channelizations
and delineation for TH 3 traffic, thereby, improving traffic safety at the intersection.
TH 3 is currently a two -lane roadway with stop signs on Canada Avenue. A 55 mph speed limit
is posted on TH 3. Currently, right -turn lanes do exist on TH 3. With no dedicated left -turn
lanes on TH 3, much of the traffic uses the right -turn lanes as bypass lanes, which creates unsafe
conditions for traffic on both TH 3 and Canada Avenue. The proposed improvements will
eliminate this issue by providing protected left-turn lanes and standard right -turn lanes for the
TH 3 approaches.
A crash investigation was conducted for this intersection. The previous five (5) years (2002
through 2006) data was collected. The results indicated there have been nine (9) crashes at the
intersection in that timeframe four (4) in 2006, none in 2005, two (2) in 2004, one (1) in 2003,
and two (2) in 2002. Of these crashes, all were either right -angle crashes, rear -end crashes, or
left -turn crashes. Approximately 45% of these crashes have involved some type of injury. The
K. 0 1668- 651AAwwDacrILTR- bvasrk -Ca ,4a 2009.rbc
Mr. Bob Vasek, PE
September 23, 2009
Page 2
majority of the crashes that have occurred at this intersection are the result of insufficient lane
geometry on TH 3 and delays for cross street traffic.
TH 3 at Canada Avenue
Severity
Type
Fatality
Injury
Property Damage
Total
01 Rear End
03 Left Turn
05 Right Angle
08 Head On
Total
Year
2002 2003 2004 2005 2005
0
0
0
0
0
1 0
1 1
1
0 2
1 0 2
2 1 2 0 4
1 1 2
1 0 0
0 1
0 1
0 0
0 0
1
1
2 1
2 0 4
0
4
5
9
5
2
1
1
The total estimated cost for the proposed improvements is $549,210.00. This cost does not
include any right of way acquisition but does include legal, administration, and engineering
costs. The breakdown of these costs is as follows:
(1) Mn /DOT will pay 8% for construction engineering
The City is requesting funding through the Municipal Agreement Program for $501,894.00, an
amount equal to 100% of the cost for the TH 3 improvements and construction engineering costs
(8 The City will utilize State Aid construction funds and local funding for their share of the
project. The costs are based on the proposed layout attached.
The City of Rosemount City Council has reviewed and adopted the concept plan as submitted. A
resolution from the City Council was prepared and approved at the September 15, 2009, City
Council meeting. A copy of the signed resolution is attached for your review.
Also attached, as part of this submittal, you will find ten (10) copies of the following:
1. A full colored layout showing the proposed improvements.
2. One -page summary of the project submittal.
3. A copy of the signed Council Resolution.
K 01668- 651.4dmin ■DocrILTR- bvarrk- Canada 2009.doc
Total Costs
Mn /DOT Cost
C'i 'Costs
1. TH 3 Improvements
$464,717.00
$464,717.00
$0
Total Construction Cost
$464,717.00
$464,717.00
$0
Indirect Costs (30
$139,415.00
$37,177.00
$102,238.00
Grand Total
$604,132.00
$501,894.00
$102,238.00
Mr. Bob Vasek, PE
September 23, 2009
Page 2
majority of the crashes that have occurred at this intersection are the result of insufficient lane
geometry on TH 3 and delays for cross street traffic.
TH 3 at Canada Avenue
Severity
Type
Fatality
Injury
Property Damage
Total
01 Rear End
03 Left Turn
05 Right Angle
08 Head On
Total
Year
2002 2003 2004 2005 2005
0
0
0
0
0
1 0
1 1
1
0 2
1 0 2
2 1 2 0 4
1 1 2
1 0 0
0 1
0 1
0 0
0 0
1
1
2 1
2 0 4
0
4
5
9
5
2
1
1
The total estimated cost for the proposed improvements is $549,210.00. This cost does not
include any right of way acquisition but does include legal, administration, and engineering
costs. The breakdown of these costs is as follows:
(1) Mn /DOT will pay 8% for construction engineering
The City is requesting funding through the Municipal Agreement Program for $501,894.00, an
amount equal to 100% of the cost for the TH 3 improvements and construction engineering costs
(8 The City will utilize State Aid construction funds and local funding for their share of the
project. The costs are based on the proposed layout attached.
The City of Rosemount City Council has reviewed and adopted the concept plan as submitted. A
resolution from the City Council was prepared and approved at the September 15, 2009, City
Council meeting. A copy of the signed resolution is attached for your review.
Also attached, as part of this submittal, you will find ten (10) copies of the following:
1. A full colored layout showing the proposed improvements.
2. One -page summary of the project submittal.
3. A copy of the signed Council Resolution.
K 01668- 651.4dmin ■DocrILTR- bvarrk- Canada 2009.doc
Mr. Bob Vasek, PE
September 23, 2009
Page 3
Please contact me at 763 287 -7183 or e -mail me at crickart awsbeng.com if you have any
questions concerning this request or if additional information would be helpful for the Selection
Committee during their review of this project.
Sincerely,
WSB Associates, Inc.
cti.,GTP✓G
Charles T. Rickart, PE, PTOE
Associate/Project Manager
Attachments
cc: Andy Brotzler, City of Rosemount
sm
K. 0 1668- 651.4dmmDocs<R4warekGa ado 2009.doc
FY 2011 MUNICIPAL AGREEMENT PROPOSAL
TH 3 AND CANADA AVENUE IMPROVEMENTS
ROSEMOUNT, MN
The proposed TH 3 improvements would include widening TH 3 to provide a left-turn lane, through
lane, and right -turn lane for both approaches. The existing Stop sign control for the Canada Avenue
Approaches will remain in- place.
The proposed Management Category project will benefit the Trunk Highway System by providing
left- and right -turn lane channelizations and delineation for TH 3 traffic, thereby improving traffic
safety at the intersection.
TH 3 is currently a two -lane roadway with stop signs on Canada Avenue. Currently, right -turn
lanes do exist on TH 3. With no dedicated left-turn lanes on TH 3, traffic will use the right -turn
lanes as bypass lanes which create unsafe conditions for both traffic on TH 3 and Canada Avenue.
The proposed improvements will eliminate this issue by providing protective left-turn lanes and
standard right -turn lanes for the TH 3 approaches.
A crash investigation was conducted for this intersection. The previous five (5) years (2002
through 2006) data was collected. The results indicated there have been nine (9) crashes at the
intersection in that timeframe four (4) in 2006, none in 2005, two (2) in 2004, one (1) in 2003, and
two (2) in 2002. Of these crashes, all were either right -angle crashes, rear -end crashes, or left-turn
crashes. Approximately 45% of these crashes have involved some type of injury. The majority of
the crashes that have occurred at this intersection are the result of insufficient lane geometry on TH
3 and delays for cross street traffic.
(1) Mn /DOT will pay 8% for construction engineering
IC. \RIKAR- (.i \AAmin \Tlnra \RV 71111 Canada MI TTI TPAT A(:RFFMFNT PROP Anr
Total Costs
Mn /DOT Cost
City Costs
1. TH 3 Improvements
$464,717.00
$464,717.00
$0
Total Construction Cost
$464,717.00
$464,717.00
$0
Indirect Costs (30
$139,415.00
$37,177.00
$102,238.00
Grand Total
$604,132.00
$501,894.00
$102,238.00
FY 2011 MUNICIPAL AGREEMENT PROPOSAL
TH 3 AND CANADA AVENUE IMPROVEMENTS
ROSEMOUNT, MN
The proposed TH 3 improvements would include widening TH 3 to provide a left-turn lane, through
lane, and right -turn lane for both approaches. The existing Stop sign control for the Canada Avenue
Approaches will remain in- place.
The proposed Management Category project will benefit the Trunk Highway System by providing
left- and right -turn lane channelizations and delineation for TH 3 traffic, thereby improving traffic
safety at the intersection.
TH 3 is currently a two -lane roadway with stop signs on Canada Avenue. Currently, right -turn
lanes do exist on TH 3. With no dedicated left-turn lanes on TH 3, traffic will use the right -turn
lanes as bypass lanes which create unsafe conditions for both traffic on TH 3 and Canada Avenue.
The proposed improvements will eliminate this issue by providing protective left-turn lanes and
standard right -turn lanes for the TH 3 approaches.
A crash investigation was conducted for this intersection. The previous five (5) years (2002
through 2006) data was collected. The results indicated there have been nine (9) crashes at the
intersection in that timeframe four (4) in 2006, none in 2005, two (2) in 2004, one (1) in 2003, and
two (2) in 2002. Of these crashes, all were either right -angle crashes, rear -end crashes, or left-turn
crashes. Approximately 45% of these crashes have involved some type of injury. The majority of
the crashes that have occurred at this intersection are the result of insufficient lane geometry on TH
3 and delays for cross street traffic.
(1) Mn /DOT will pay 8% for construction engineering
IC. \RIKAR- (.i \AAmin \Tlnra \RV 71111 Canada MI TTI TPAT A(:RFFMFNT PROP Anr
.CO' 11o. onto opae,,,aXop,oJ,,,,,,,, mumsW4 6u
6002/6/6 P.M*. .1.0