Loading...
HomeMy WebLinkAbout6.h. Receive Bids/Award Contract - Glendalough & Glendalough 2nd Street and Utility Improvements, City Project #427AGENDA ITEM: Receive Bids /Award Contract Glendalough Glendalough 2 Street and Utility Improvements, City Project #427 AGENDA SECTION: Consent PREPARED BY: Andrew J. Brotzler, PE, Director of Pub Works /City Engineer AGENDA NO. 10.11 ATTACHMENTS: Resolution; Letter of Recommendation; Bid Tabulation; Map APPROVED BY DATAJ RECOMMENDED ACTION: Motion to Adopt a Resolution Receiving Bids and Awarding the Contract for the Glendalough Glendalough 2 Street and Utility Improvements, City Projects #427. 9 ROSEMOUNT CITY COUNCIL City Council Meeting: September 15, 2008 ISSUE: EXECUTIVE SUMMARY Receive bids and award contract for the Glendalough Glendalough 2 Street and Utility Improvements, City Projects 427. BACKGROUND: On Thursday, September 3, 2009, bids for this project were received and read aloud publicly. The Evermoor development consists of 188 single family residential units located on 97.45 acres located along the north side of Connemara Trail and west of Dodd Boulevard. The Evermoor of Glendalough 5 10t Additions are generally located in the eastern end of the Evermoor tract and these additions represent the last remaining areas in the Evermoor project. The 2009 Glendalough Addition and Glendalough 2' Addition is the next phase of the development to be completed, and is comprised of 23 single family residential units. This project has been designated as City Project No. 427. The proposed improvements include the construction of city streets that include concrete curb and gutter and 5 -foot concrete sidewalks. Utility improvements include the construction of storm sewer, as the majority of public utility rovements in the area to be platted were previously installed with the Evermoor's Glendalough Addition, City Project 401, in 2006.. After verification of bids received, the low bidder is McNamara Contracting, Inc. in the amount of $235,923.75. All costs associated with this project will be funded by the developer, Lennar. SUMMARY: Staff recommends that Council adopt the attached resolution receiving the bids and awarding the contract for the Glendalough Glendalough r Street and Utility Improvements, City Project 427. G: \ENGPROJ\ 427\091509 CC RecBid- AwudContnct.doc ATTEST: Amy Domeier, City Clerk CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2009 A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR THE GLENDALOUGH AND GLENDALOUGH 2 STREET AND UTILITY IMPROVEMENTS CITY PROJECT #427 WHEREAS, the City Council authorized the City Engineer to advertise for bids. BE IT FURTHER RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: All bids on construction of Glendalough and Glendalough 2n Street and Utility Improvements have been received and tabulated. 1. The bid of McNamara Contracting, Inc., Rosemount, Minnesota in the amount of $235,923.75 for the construction of said improvements is in accordance with the plans and specifications and advertisement for bids, and is the lowest responsible bid and shall be and hereby is accepted. 2. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 3. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of the successful bidder and the next two lowest bidders shall be retained until a contract has been executed. ADOPTED this 15 day of September, 2009. William H. Droste, Mayor Motion by Seconded by: Voted in favor: Voted against: WSB Associates, Inc. September 3, 2009 Infrastructure Engineering Planning Construction Honorable Mayor and City Council Members City of Rosemount 2875 145 Street West Rosemount, MN 55068 Re: 2009 Glendalough and Glendalough 2 Additions City of Rosemount Project No. 427 WSB Project No. 1668 -91 Dear Mayor and Council Members: Bids were received for the above referenced project on Thursday, September 3, 2009, and were opened and read aloud. A total of four bids were received. The bids were checked for mathematical accuracy and tabulated. The Engineer's Estimate was $223,595.50. Please find enclosed the bid tabulation indicating the low bidder as McNamara Contracting, Inc., Rosemount, Minnesota, in the amount of $235,923.75. We recommend that the City Council consider these bids and award a contract to McNamara Contracting, Inc., based on the results of the bids received. Sincerely, WSB Associates, Inc. Mor Assi Enclosures cc: tsf Andy Brotzler, City of Rosemount Cindy Dorniden, City of Rosemount 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763 541 -4800 Fax: 763 541 -1700 PROJECT: 2009 Glendalough and Glendalough 2nd Additions LOCATION: City of Rosemount Project No. 427 WSB PROJECT NO.: 1668 -91 Bids Opened: Thursday, September 3, 2009 at 10:00 a.m. Bid Security Addendum Addendum Contractor (5 No. 1 No. 2 Grand Total Bid 1 McNamara Contracting, Inc. X X X $235,923.75 2 Northwest Asphalt, Inc. X X X $267,826.00 3 Max Steininger, Inc. X X X $287,435.11 4 Bituminous Roadways, Inc. X X X $337,880.00 Engineer's Opinion of Cost: $223,595.50 I hereby certify that this is a true and correct tabulation of the bids as received on September 3, 2009. Denotes corrected figure Kb1668 -91 AdmInlConshuction AdminIf668 -91 Bid Tab Summary.xls 2009 Glenda lough and Glenda lot* h 2nd :LIFFE CT Carrolls Woods Park Glendalough 2nd 142ND ST W /1 ST 1/4 CHARLSTON WAY Park BRONZE CT BR Brockway pkwy Park STW 1 4. L I 138TH Glendalough >-H-- 138TH ST VF CONNEMARA 0 t U. 138TH ST VW 1 4 4 pi L139TILST.W.,1_ c 7 1 g, ugiiis Tiig' Z■1 4,1 'C i 4 C1■ M' Z! AI ni al 4:1 zi 140TH ST Nt A _1. 2 1 m j ru:\ 0 0 2 1 :3 ti 1-7,k. CL i ---R 145TH ST W 130TH B LMONT BIRDSON BEECH ST W 0 480 960 1,920 icc co I- 2,880 T:/G'S/City/Maps/Departmental Maps/Engineering/Chris/Glendalough 2009 Locate 0 3,840 Feet —J 132ND E.. ST W w ca 0 et July 2009