HomeMy WebLinkAbout6.h. Receive Bids/Award Contract - Glendalough & Glendalough 2nd Street and Utility Improvements, City Project #427AGENDA ITEM: Receive Bids /Award Contract
Glendalough Glendalough 2 Street
and Utility Improvements, City Project
#427
AGENDA SECTION:
Consent
PREPARED BY: Andrew J. Brotzler, PE, Director of Pub
Works /City Engineer
AGENDA NO. 10.11
ATTACHMENTS: Resolution; Letter of Recommendation;
Bid Tabulation; Map
APPROVED BY
DATAJ
RECOMMENDED ACTION: Motion to Adopt a Resolution Receiving Bids and Awarding
the Contract for the Glendalough Glendalough 2 Street and Utility Improvements, City
Projects #427.
9 ROSEMOUNT
CITY COUNCIL
City Council Meeting: September 15, 2008
ISSUE:
EXECUTIVE SUMMARY
Receive bids and award contract for the Glendalough Glendalough 2 Street and Utility Improvements,
City Projects 427.
BACKGROUND:
On Thursday, September 3, 2009, bids for this project were received and read aloud publicly.
The Evermoor development consists of 188 single family residential units located on 97.45 acres located
along the north side of Connemara Trail and west of Dodd Boulevard. The Evermoor of Glendalough 5
10t Additions are generally located in the eastern end of the Evermoor tract and these additions
represent the last remaining areas in the Evermoor project. The 2009 Glendalough Addition and
Glendalough 2' Addition is the next phase of the development to be completed, and is comprised of 23
single family residential units. This project has been designated as City Project No. 427.
The proposed improvements include the construction of city streets that include concrete curb and gutter
and 5 -foot concrete sidewalks. Utility improvements include the construction of storm sewer, as the
majority of public utility rovements in the area to be platted were previously installed with the
Evermoor's Glendalough Addition, City Project 401, in 2006..
After verification of bids received, the low bidder is McNamara Contracting, Inc. in the amount of
$235,923.75.
All costs associated with this project will be funded by the developer, Lennar.
SUMMARY:
Staff recommends that Council adopt the attached resolution receiving the bids and awarding the contract
for the Glendalough Glendalough r Street and Utility Improvements, City Project 427.
G: \ENGPROJ\ 427\091509 CC RecBid- AwudContnct.doc
ATTEST:
Amy Domeier, City Clerk
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2009
A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT
FOR THE GLENDALOUGH AND GLENDALOUGH 2
STREET AND UTILITY IMPROVEMENTS
CITY PROJECT #427
WHEREAS, the City Council authorized the City Engineer to advertise for bids.
BE IT FURTHER RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows:
All bids on construction of Glendalough and Glendalough 2n Street and Utility Improvements have been
received and tabulated.
1. The bid of McNamara Contracting, Inc., Rosemount, Minnesota in the amount of
$235,923.75 for the construction of said improvements is in accordance with the plans and
specifications and advertisement for bids, and is the lowest responsible bid and shall be and
hereby is accepted.
2. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said
bidder for the construction of said improvements for and on behalf of the City of
Rosemount.
3. The City Clerk is hereby authorized and directed to return forthwith to all bidders the
deposits made with their bids, except that the deposit of the successful bidder and the next
two lowest bidders shall be retained until a contract has been executed.
ADOPTED this 15 day of September, 2009.
William H. Droste, Mayor
Motion by Seconded by:
Voted in favor:
Voted against:
WSB
Associates, Inc.
September 3, 2009
Infrastructure Engineering Planning Construction
Honorable Mayor and City Council Members
City of Rosemount
2875 145 Street West
Rosemount, MN 55068
Re: 2009 Glendalough and Glendalough 2 Additions
City of Rosemount Project No. 427
WSB Project No. 1668 -91
Dear Mayor and Council Members:
Bids were received for the above referenced project on Thursday, September 3, 2009, and were
opened and read aloud. A total of four bids were received. The bids were checked for
mathematical accuracy and tabulated. The Engineer's Estimate was $223,595.50. Please find
enclosed the bid tabulation indicating the low bidder as McNamara Contracting, Inc.,
Rosemount, Minnesota, in the amount of $235,923.75.
We recommend that the City Council consider these bids and award a contract to McNamara
Contracting, Inc., based on the results of the bids received.
Sincerely,
WSB Associates, Inc.
Mor
Assi
Enclosures
cc:
tsf
Andy Brotzler, City of Rosemount
Cindy Dorniden, City of Rosemount
701 Xenia Avenue South
Suite 300
Minneapolis, MN 55416
Tel: 763 541 -4800
Fax: 763 541 -1700
PROJECT:
2009 Glendalough and Glendalough 2nd Additions
LOCATION:
City of Rosemount Project No. 427
WSB PROJECT NO.:
1668 -91
Bids Opened: Thursday, September 3, 2009 at 10:00 a.m.
Bid Security Addendum Addendum
Contractor (5 No. 1 No. 2 Grand Total Bid
1 McNamara Contracting, Inc. X X X $235,923.75
2 Northwest Asphalt, Inc. X X X $267,826.00
3 Max Steininger, Inc. X X X $287,435.11
4 Bituminous Roadways, Inc. X X X $337,880.00
Engineer's Opinion of Cost: $223,595.50
I hereby certify that this is a true and correct tabulation of the bids as received on September 3, 2009.
Denotes corrected figure
Kb1668 -91 AdmInlConshuction AdminIf668 -91 Bid Tab Summary.xls
2009 Glenda lough and
Glenda lot* h 2nd
:LIFFE
CT
Carrolls
Woods
Park
Glendalough 2nd
142ND ST W
/1 ST 1/4
CHARLSTON WAY
Park
BRONZE
CT
BR
Brockway pkwy
Park
STW
1 4. L I 138TH
Glendalough >-H--
138TH ST VF
CONNEMARA
0 t U. 138TH ST VW 1 4 4
pi L139TILST.W.,1_
c 7 1 g, ugiiis Tiig'
Z■1 4,1 'C i 4 C1■
M' Z! AI ni
al 4:1 zi
140TH ST Nt A
_1. 2 1
m
j ru:\ 0
0
2 1 :3 ti
1-7,k. CL
i ---R
145TH ST W
130TH
B LMONT
BIRDSON
BEECH ST W
0 480 960
1,920
icc
co I-
2,880
T:/G'S/City/Maps/Departmental Maps/Engineering/Chris/Glendalough 2009 Locate
0
3,840
Feet
—J
132ND E..
ST W
w
ca
0
et
July 2009