HomeMy WebLinkAbout6.g. Authorize Feasibility Report - 2010 Street Improvement Project, City Project #428AGENDA ITEM: Authorize Feasibility Report 2010
Street Improvement Project, City Project
#428
AGENDA SECTION:
Consent
PREPARED BY: Andrew J. Brotzler, PE, Director of Pu i
Works /City Engineer
AGENDA NO. to 6
ATTACHMENTS: Resolution, Map
APPROVED BY:
9A1
RECOMMENDED ACTION: 1) Motion to Adopt a Resolution Authorizing a Feasibility
Report for the 2010 Street Improvement Project, City Project #428.
4 ROSEMOUNT
CITY COUNCIL
City Council Meeting: September 15, 2009
EXECUTIVE SUMMARY
BACKGROUND
With the completion of the 2009 Street Improvement Project, funding for the city's pavement
management program is proposed to be prioritized towards improvements focused on the long term
preservation of the roadway network Activities for this type of strategy primarily include mill and overlay
projects; however, roadway rehabilitation may be required for roadways with excessive pavement
deterioration. The selection of projects focused on long term pavement preservation will allow the city to
address the recently observed surface deterioration of streets within the Country Dills neighborhood,
Shannon Parkway, and other streets near 20 years in age and older.
The 2010 Street Improvement Project includes surface improvements to approximately 47,500 feet (9.0
miles) of urban local streets in the Country Frills neighborhoods. Additionally, surface improvements and
roadway rehabilitation is also proposed to approximately 8250 feet (1.56 miles) of Shannon Parkway. In
addition to the proposed street improvements, the replacement of existing trails and addition of trails in
accordance with the city's adopted trail and sidewalk plan will be reviewed.
The attached location map illustrates the proposed project area.
At this time, Staff is requesting authorization to prepare a feasibility report for improvements to Shannon
Parkway and the Country Hills neighborhoods. The feasibility report will include proposed
improvements, detailed cost estimates, and funding sources.
SUMMARY:
Staff recommends Council approval of the attached resolution to authorize the preparation of a feasibility
report for the 2010 Street Improvement Project, City Project 428.
G: \ENGPROJ \428 \9 -15-09 CC AuthFR CP428 (2).docx
ATTEST:
Amy Domeier, City Clerk
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2009
A RESOLUTION ORDERING A FEASIBILITY REPORT FOR THE
2010 STREET IMPROVEMENTS PROGRAM
CITY PROJECT #428
WHEREAS, the City Council of the City of Rosemount deems it necessary to investigate ,the feasibility of
the 2010 Street Improvements Program, City Project 428.
NOW THEREFORE BE IT RESOLVED, the City Engineer is directed to have the necessary feasibility
report prepared for the 2010 Street Improvements Program, City Project 428.
ADOPTED this 15th day of September, 2009.
William H Droste, Mayor
Motion b Second by
Voted in favor.
Voted against:
Al litti
lis mIsliw4WIWAVIIIIWNWAozo
IN as vilkiPit■
UN fiv fp, ,Csj
ff �I
A 1 tageopry
1j,► %NV 4
Igi: :1c 14
!21 1, ■���■���4�1
itin 6 ►Adisi
atio 411111M-
Illtor
lash AO $4 4 ta 40
4 i i •NNEMARA A to p 1 1.! •41.''
/►�1♦0 *11` 1
Y" 1.00 4
LOU otWili �j teV1111 ills
I ,111 ►�����11UN
las i11 IGGi iiii
111113C''q'
*0
OSIP
LEGEND
ROADWAY IMPROVEMENTS
I� SIDEWALK/TRAIL IMPROVEMENTS
701 Xenia Avenue South, Suite 300
WS/../ Minneapolis, MN 55416
www.wsbeng.com
Asso c1etos, Inc.
��.a.ss�ssssss� 763 541 4800 Fax 763 541 1700
INFRASTRUCTURE i ENGINEERING PLANNING +CONSTRUCTION
2010 STREET IMPROVEMENT
PROJECT
PROPOSED IMPROVEMENTS
"ROSEMOUNT
MINNESOTA
WSB Project No.01668 -93
September 15,2009
Figure Number
1