Loading...
HomeMy WebLinkAbout6.g. Authorize Feasibility Report - 2010 Street Improvement Project, City Project #428AGENDA ITEM: Authorize Feasibility Report 2010 Street Improvement Project, City Project #428 AGENDA SECTION: Consent PREPARED BY: Andrew J. Brotzler, PE, Director of Pu i Works /City Engineer AGENDA NO. to 6 ATTACHMENTS: Resolution, Map APPROVED BY: 9A1 RECOMMENDED ACTION: 1) Motion to Adopt a Resolution Authorizing a Feasibility Report for the 2010 Street Improvement Project, City Project #428. 4 ROSEMOUNT CITY COUNCIL City Council Meeting: September 15, 2009 EXECUTIVE SUMMARY BACKGROUND With the completion of the 2009 Street Improvement Project, funding for the city's pavement management program is proposed to be prioritized towards improvements focused on the long term preservation of the roadway network Activities for this type of strategy primarily include mill and overlay projects; however, roadway rehabilitation may be required for roadways with excessive pavement deterioration. The selection of projects focused on long term pavement preservation will allow the city to address the recently observed surface deterioration of streets within the Country Dills neighborhood, Shannon Parkway, and other streets near 20 years in age and older. The 2010 Street Improvement Project includes surface improvements to approximately 47,500 feet (9.0 miles) of urban local streets in the Country Frills neighborhoods. Additionally, surface improvements and roadway rehabilitation is also proposed to approximately 8250 feet (1.56 miles) of Shannon Parkway. In addition to the proposed street improvements, the replacement of existing trails and addition of trails in accordance with the city's adopted trail and sidewalk plan will be reviewed. The attached location map illustrates the proposed project area. At this time, Staff is requesting authorization to prepare a feasibility report for improvements to Shannon Parkway and the Country Hills neighborhoods. The feasibility report will include proposed improvements, detailed cost estimates, and funding sources. SUMMARY: Staff recommends Council approval of the attached resolution to authorize the preparation of a feasibility report for the 2010 Street Improvement Project, City Project 428. G: \ENGPROJ \428 \9 -15-09 CC AuthFR CP428 (2).docx ATTEST: Amy Domeier, City Clerk CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2009 A RESOLUTION ORDERING A FEASIBILITY REPORT FOR THE 2010 STREET IMPROVEMENTS PROGRAM CITY PROJECT #428 WHEREAS, the City Council of the City of Rosemount deems it necessary to investigate ,the feasibility of the 2010 Street Improvements Program, City Project 428. NOW THEREFORE BE IT RESOLVED, the City Engineer is directed to have the necessary feasibility report prepared for the 2010 Street Improvements Program, City Project 428. ADOPTED this 15th day of September, 2009. William H Droste, Mayor Motion b Second by Voted in favor. Voted against: Al litti lis mIsliw4WIWAVIIIIWNWAozo IN as vilkiPit■ UN fiv fp, ,Csj ff �I A 1 tageopry 1j,► %NV 4 Igi: :1c 14 !21 1, ■���■���4�1 itin 6 ►Adisi atio 411111M- Illtor lash AO $4 4 ta 40 4 i i •NNEMARA A to p 1 1.! •41.'' /►�1♦0 *11` 1 Y" 1.00 4 LOU otWili �j teV1111 ills I ,111 ►�����11UN las i11 IGGi iiii 111113C''q' *0 OSIP LEGEND ROADWAY IMPROVEMENTS I� SIDEWALK/TRAIL IMPROVEMENTS 701 Xenia Avenue South, Suite 300 WS/../ Minneapolis, MN 55416 www.wsbeng.com Asso c1etos, Inc. ��.a.ss�ssssss� 763 541 4800 Fax 763 541 1700 INFRASTRUCTURE i ENGINEERING PLANNING +CONSTRUCTION 2010 STREET IMPROVEMENT PROJECT PROPOSED IMPROVEMENTS "ROSEMOUNT MINNESOTA WSB Project No.01668 -93 September 15,2009 Figure Number 1