RECOMMENDED ACTION: 1) Motion to Adopt a Resolution Accepting a Municipal
Cooperative Agreement Funding for the Minnesota Department of Transportation for Trunk
Highway 3 (143 to145 Street and Signal Improvements, City Project #421;
2) Motion to Adopt a Resolution Authorizing the Preparation of Plans and Specifications
for Trunk Highway 3 (143 to 145 Street and Signal Improvements, City Project
#421;
-and
3) Motion to Approve Option 1 to Coordinate Improvements with MnDOT in the most
efficient and least disruptive manner.
4 ROSEMOUNT
City Council Special Meeting: March 18, 2009
BACKGROUND:
CITY COUNCIL
EXECUTIVE SUMMARY
On September 2, 2008, Council authorized the request of funding from Mn /DOT through the Municipal
Agreement Program for Trunk Highway (TH) 3 at 145 Street and 143r Street. In a letter dated February
17, 2009 (attached), Mn /DOT representatives announced the decision that the project had been selected
for funding at the requested amount. The proposed improvements include a southbound right turn lane at
143` Street, as well as signal replacement at 145 Street with a fully actuated signal system, including
updated signal phasing to provide a protective /permissive left-turn phase.
Mn /DOT presently has a pavement mill and overlay project scheduled on TH 3 in the same area for their
fiscal year 2011 (July 2010 June 2011), and on March 5, 2009, City staff met with Mn /DOT
representatives to discuss the potential for coordination of the two projects. From that meeting, three
coordination options were identified that would be acceptable to Mn /DOT. A brief summary of those
options follows:
Option 1: The City would include all work in their project from a point approximately 550 feet north of
143r Street to the 145 Street intersection. The project would not only include the elements originally
proposed in the Municipal Agreement, but also include the pavement mill and overlay for the full width of
the roadway. For this option, all work within project limits is in one project and constructed in the same
year and therefore would be the most efficient and least disruptive to motorists. All improvements are
constructed in 2010, and will provide the earliest possible benefit to residents and motorists travelling
G: \ENGPROJ 421 3- 18- 09MNDOTCoopAgree143rd- 145thCC.doc
through Rosemount. Mn /DOT would provide funding for the mill and overlay portion in addition to the
2010 Municipal Agreement Program funds, so there is no additional cost to the City for this option.
Option 2: Mn /DOT does all the roadway work in 2011 including right turn lane construction at 143'
Street, and the City does the signal replacement at 145t Street in 2010. This option delays the benefit of
the right turn lane by a year, and is not as efficient as Option 1 as it requires some of the signal work done
in 2010 to be replaced in 2011 due to overlap in project limits. Option 2 also creates more disruption for
the public with the work being conducted over two years.
Option 3: The City would do work as originally proposed in the Municipal Cooperative Agreement in
2010, and Mn /DOT conducts their mill and overlay project as originally scheduled in 2011. Although the
turn lane would be constructed in 2010, it is preferred practice to pave an adjacent through lane at the
same time, which would not be the case with Option 3. As with Option 2, project limit overlap causes
inefficiencies with some of the signal work, and more construction impacts in the project vicinity.
Should Council choose to consider the coordination of the City's Municipal Cooperative Agreement
project with Mn /DOT's mill and overlay of Trunk Highway 3, Staff recommends Option 1 as the most
efficient, most cost efficient, and least disruptive and inconvenient to the public.
SUMMARY:
Staff recommends Council adoption of the above resolutions.
2
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2009
A RESOLUTION ACCEPTING MUNICIPAL COOPERATIVE AGREEMENT FUNDING FROM
THE MINNESOTA DEPARTMENT OF TRANSPORTATION FOR
TRUNK HIGHWAY 3 (143 to 145 STREET AND SIGNAL IMPROVEMENTS
CITY PROJECT #421
WHEREAS, the City of Rosemount wishes to improve the operation and safety of the intersections of
TH 3 at 145 Street and TH 3 at 143` Street; and
WHEREAS, the City of Rosemount had requested financial participation in the project from the
Minnesota Department of Transportation (Mn /DOT) through the Municipal Agreement Program; and
WHEREAS, the City of Rosemount is committed to providing the local share of the costs if the project is
selected as part of the upcoming Municipal Agreement Program; and
WHEREAS, the Minnesota Department of Transportation has sent written confirmation awarding funding
for the project; and
WHEREAS, the Trunk Highway 3 (143` to 145 Street and Signal Improvements Project includes
southbound right turn lane at 143 Street, a new traffic signal at 145 Street and a full width mill and overlay
from 145 Street to the end of the 143r Street turn lane.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
ROSEMOUNT, DAKOTA COUNTY, MINNESOTA:
The City of Rosemount hereby accepts funding from Mn /DOT for the Trunk Highway 3 (143` to 145`
Street and Signal Improvements.
BE IT FURTHER RESOLVED, that the City Clerk is hereby authorized and directed to forward certified
copies of this resolution to Mn /DOT.
ADOPTED by the City Council this 18 day of March, 2009.
ATTEST:
William Droste, Mayor
Amy Domeier, City Clerk
Motion by: Seconded by:
Voted in favor:
Voted against:
ADOPTED this 18th day of March, 2009.
ATTEST:
Amy Domeier, City Clerk
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2009
A RESOLUTION AUTHORIZING
THE PREPARATION OF THE PLANS AND SPECIFICATIONS FOR
TRUNK HIGHWAY 3 (143 TO 145 STREET AND SIGNAL IMPROVEMENTS
CITY PROJECT #421
WHEREAS, the City Council has accepted Municipal Cooperative Agreement Funding from the Minnesota
Department of Transportation for City Project #421.
NOW THEREFORE BE IT RESOLVED, that the City Council of the City of Rosemount orders the
preparation of plans and specifications for the Trunk Highway 3 (143rd to 145th) Street and Signal
Improvements, City Project #421.
William H. Droste, Mayor
Motion by: Seconded by:
Voted in favor:
Voted against:
Minnesota Department of Transportation
Metro DIstrict
Office of State Aid
1500 West County Road B2
Roseville, MN 55113 -3174
February 17, 2009
Mr. Charles T. Rickart
WSB Associates
701 Xenia Avenue South, Suite 300
Minneapolis, MN 55416
RE: Request for FY 2010 Municipal Agreement Program Funding
TH 3 at 143` Street and 145 Street
in the City of Rosemount
Dear Mr. Rickart:
An equal opportunity employer
Office Tel: 651 234 -7780
Office Fax: 651- 234 -7765
robert.vasek@dot.state.mn.us
I am writing to inform you of the decision reached on January 22, 2009 by the Fiscal Year (FY) 2010
Municipal Agreement Program Selection Committee regarding the above referenced project.
After considering 30 candidates submitted for inclusion in the FY 2010 Program, the Selection
Committee has decided to offer a maximum contribution by Mn/DOT of $289,900 (this includes $31,800
for Construction Engineering and Inspection). The award is for the construction of the turn lane at 143`
Street and signal reconstruction at 145 Street. The proposal was categorized as a Preservation project
with Management components and was 5th out of 11 projects selected for funding.
Mn/DOT presently has a mill and overlay project scheduled in this area for FY 2011 and there may be
opportunities to coordinate the work. I would recommend we meet soon to discuss the options since that
may affect the award.
The referenced funding amount is the maximum amount of Mn/DOT FY 2010 Municipal Agreement
funding available for this project. Municipal Agreement funds can only be used for construction items
that can be justified in accordance with the Mn/DOT Cost Participation Policy. If the cost of eligible
items falls below this maximum amount, the funds awarded will be reduced to match the cost of the
eligible items. A copy of the Mn/DOT Cost Participation Policy can be viewed at
http://www.dot.state.mn.us/stateaid/forms/ds12_1.pdf
If this funding is accepted by your agency you will be expected to provide project plans and
specifications to my office that conform to a Mn/DOT format. They will be reviewed and commented on
by Mn/DOT functional groups. Please contact the Metro functional groups directly for specific questions
relating to their area and copy the State Aid Project Manager on correspondence. We will provide the
Municipal Agreement Program process information upon request. All Right -of -Way costs and
acquisition, Utility Relocation as applicable and Preliminary Engineering are the responsibility of the
local agency. An agreement will be written by Mn/DOT's Office of Technical Support and must be fully
executed prior to award of the project. To receive the funds, this project must be let by June 30, 2010.
After that date the money becomes unavailable to our office.
Please reply in writing by March 20, 2009 if the City of Rosemount would like to accept this funding.
The written confirmation should include acceptance of the conditions of Right -of -Way, Utility
Relocation and Design along with the funding level proposed. Jim Myers will be the Project Manager
for this job if funding is accepted and he can be reached at 651- 234 -7776.
Mr. Charles T. Rickart
Page 2
February 17, 2009
If you have any questions about the selection process and /or funding situation please feel free to contact me.
Sincerely,
Robert (Bob) asek, P.E.
Cooperative Agreement Engineer
cc: Greg Coughlin, Mn/DOT Metro State Aid
Lynn Clarkowski, Mn/DOT -South Area Manager
Ken Johnson, Mn/DOT-South Area Engineer
Andrew Brotzler, Rosemount City Engineer
Jim Myers, Mn/DOT -Metro State Aid
File
Electronic Copy Only
Dawley, Morgan
From: Brotzler, Andy
Sent: Wednesday, March 11, 2009 4:29 PM
To: Robert Vasek
Cc: Dawley, Morgan; Dale Nelson; Dave VanDeusen; James Myers; Ken Johnson;
CRickart@wsbeng.com
Subject: RE: TH 3 from 143rd Street to 145th Street Project CoordinationOptions
Bob
Thanks for the e-mail.
We will be bringing this item to our Council next Tuesday as discussed to present the option.
Andy
Andrew J. Brotzler, P.E. 1 City Engineer 1 City of Rosemount
2875 145th Street West 1 Rosemount, MN 55068
Direct: 651.322.2025 1 Fax: 651.322.2694 1
----Original Message--
From: Robert Vasek mailto :Robert.Vasek @dot.state.mn.us]
Sent: Wednesday, March 11, 2009 11:57 AM
To: Brotzler, Andy
Cc: Dawley, Morgan; Dale Nelson; Dave VanDeusen; James Myers; Ken Johnson; CRickart@wsbeng.com
Subject: TH 3 from 143rd Street to 145th Street Project CoordinationOptions
Andy, Per our meeting on March 5, we checked on the funding for the following options. The funding year and project
letting schedule is addressed in bold:
Option 1. City would do all work proposed from the north end of the RTL at 143rd to intersection of 145st. Mn /DOT would
provide funding for the M &O portion in addition to the FY 2010 Municipal Agreement Program A rough estimate of the
additional work is $250K which includes replacing a segment of the SB through lane adjacent to the proposed RTL
($50K). I had offerred $258,100 plus 8% for CE for $289,900 for the turn lane and signal reconstruct. All work within
project limits is in one project and most efficient and least disruptive to motorists. Additional $50K Muncipal Agreement
funds tentatively available for thru lane replacement. Municipal Agreement Program funds would remain in FY 2010 and
Mn /DOT Preservation funds would remain in FY 2011. Letting date would have to be in early FY 2011(July /August 2010)
since "debt management/future year payback" to the city is not an option.
Option 2. Mn /DOT does all the roadway work in 2011 and City does the Signal work at 145th in FY 2010. This delays the
SB RTL construction which may be an issue for the City. Signal Loops may need to be replaced twice unless an
alternative is figured out. Funding transfers between the Municipal Agreement Program and Pavement Preservation for
the turn lane and thru lane replacment is an internal Mn /DOT issue that could be addressed. Project letting date could be
as early as July 2010 but that is Mn /DOT's discretion.
Option 3. City does work as they originally proposed in FY 2010 and M &O happens in FY 2011. More project overlap
and coordination issues with the TL and Signal work and may require replacing signal loops on north leg of intersection
twice unless an alternative is figured out. Preliminary estimate of $50K for the SB through lane replacement adjacent to
the proposed SB right turn lane. Municipal Agreement program could tentatively provide additional $50K for the thru lane
replacement cost.
All of the cost figures are preliminary at this point and subject to change, but do provide a good basis for discussion of the
options. The SB through lane replacement could be dropped from all options as well if cost increases significantly or
funding is not available. The "tentative" additional funding is based on current program commitments and that can change
as time goes on. Further refinement of cost estimates and schedule discussions can take place once a preferred option is
determined.
Please let me know if you have any questions and what direction you get from City Council on March 18th.
Bob
Bob Vasek
Cooperative Agreements Engineer
Minnesota Department of Transportation
Metro District State Aid
1500 West County Road B2
Roseville, MN 55113
Tel. 651 234 -7780
FAX. 651- 234 -7765
Email: robert.vasek(cr dot.state.mn.us
Dote: Printed: 3/6/2009
WSB Filename: 6: \01668 -65 \Cad \Layout \143rd ROLL.dgn
W
Pt
N
O
C")
IV
O
0 C
CD -in
o
cn
0
Fir CO4
O
O
CD
03
C
0D
0D
3
CD
em■
03
k Ft
MR
MOM
«r
a
3 e,
1
I
145th STREET
W
4
A
n co
N
CD G
o- 0
0
Cs
C C)
—4 XI
-4 R1
m-4
7:4
4
4
4
aissa
0
0
ilk
143rd STREET