Loading...
HomeMy WebLinkAbout6.n. Approve Final Payment for Fire Station No. 2 Contractor - Weather Proof SystemsAGENDA ITEM: Approve Final Payment for Fire Station No. 2 Contractor Weather Proof Systems AGENDA SECTION: Consent PREPARED BY: Kim Lindquist, Community Development Director AGENDA NO. (0- ft ATTACHMENTS: Application and Certificate for Payment APPROVED BY: oil) RECOMMENDED ACTION: Motion to approve final payment for Weather Proof Systems for work completed on the Fire Station No. 2 project in the amount of $4,932.60. 4 ROSEMOUNT CITY COUNCIL City Council Regular Meeting: March 18, 2009 EXECUTIVE SUMMARY ISSUE This item is on the agenda to get the Council's approval to make a final payment to a contractor for work completed on Fire Station No. 2. BACKGROUND Fire Station No. 2 has been complete for some time and final payments have been made to all of the sub contractors except for Weather Proof Systems due to unresolved issues related to the roofing contract. These issues included substandard flashing and roof coping installation. The coping (the metal covering the roof edge /top of the exterior wall) had an inadequate number of fasteners. There were also flashings between the main building and dispatch that leaked and required rework. The problems have now been corrected and final payment can be made. RECOMMENDATION Staff requests Council's approval of final payment to Weather Proof Systems for work completed on the Fire Station No. 2 project in the amount of $4,932.60. }-eb 24 09 02:20p Ad Sakaye 763-427-1352 p.2 tedi.:1 \c) Nn(i,A 11 cc I (MIMI, Slll.l. l 1 I 1 1 4 1 1 1 1 1 a .a 3 t 1 1 1 FNt)M 1'H APPLICATION 114 F.) viS Ce5 •:11 u cs ;4.1'IVA 41111.111:111:)S trl a 9 kn g S Fs cis o 4 a g r '4 C. 4:2 3 C g 9- r -4- .2 g ..p ....,_g g Nn.%-r) cp _.,6 6 6 V V v et M T X11 I`' Feb 24 09 02:20p Art Sakaye 11 r E R .I C y u 7 Z rs 2 it V y y E F. L. is C E c w c F •2 G1 2 763 -427 -1352 t 7 s O T 1 1 t l l t 0 C o j 1 1 a v l v RS cc} m p.3 CONTINUATION SHEET