HomeMy WebLinkAbout3.d. 2008 Public Works Annual ReportAGENDA ITEM: 2008 Public Works Annual Report
AGENDA SECTION:
Department Head Report
PREPARED BY: Andrew J. Brotzler, PE, Director of Public jAGENDA
Works City Engineer
NO. b.A-
ATTACHMENTS: 2008 Public Works Annual Report
APPROVED BY:
Co)
RECOMMENDED ACTION: None
4 ROSEMOUNT
CITY COUNCIL
City Council Meeting: June 16, 2009
Staff will provide a presentation of the 2008 Public Works Annual Report.
EXECUTIVE SUMMARY
BACKGROUND:
Attached you will find the department's fourth edition of the Public Works Annual Report. The
2008 report provides an overview of our accomplishments, and a breakdown of staff -hours and costs
associated with our activities in 2008. It is a comprehensive "look inside" the Public Works
Department.
Our ongoing focus is to maintain the necessary procedures and resources that will allow us to do
our jobs effectively and efficiently, and continue to perform at the desired "service levels." We will
continue to expand our capabilities with CarteGraph, identifying new ways to improve our
workflow, track information, and generate useful data and reports that will help with decision
making in the future.
SUMMARY:
Many of the daily tasks and activities of the Public Works Department are very visible to the
public, often providing immediate benefits to those we serve. It is important that we stay focused
on our accountability to the public by providing the most efficient, cost effective service possible
with the resources we have available. We will continue to prepare a Public Works Annual Report to
summarize our progress and accomplishments.
G: \Chris\PW Annual Report \2008 Annual Report \6 -16-09 CC 2008 PWAnnualReport.doc
Public Works Annual Report
2008
S ROSEMOUNT
PUBLIC WORKS DEPARTMENT
TABLE OF CONTENTS
Purpose and Mission Statement Page 2
The Department Pages 3 -5
Organization Chart Page 3
2008 Highlights Page 6 -9
Right -of -Way Management Page 6
CarteGraph and GIS Pages 6
Fuel Consortium Page 6
Improvement Projects Page 7
Water System Page 7
Construction Projects Page 8
Safe Routes to School Page 9
The Next Generation Page 9
Pavement Management Program Pages 10 -12
Map of 2009 Projects Page 11
Street Maintenance Pages 12 -15
Winter Operations Pages 13 -15
Utilities Pages 16 -21
Water Usage Charts Pages 19 -20
Testing/sampling schedule Page 21
Parks and Grounds Page 22 -23
Irrigation Summary Page 23
Fleet Management Pages 24 -27
Fuel Page 26 -27
Vision for 2009 and Beyond Page 28
Appendix Pages 29 -38
Vehicle Replacement Analysis Charts Pages 30
Vehicle Summary Page 31 -33
Long -term Project Schedule Page 34 -38
Public Works Annual Report 2008
PURPOSE
The purpose of this report is to summarize the activities and initiatives of the
Public Works Department during the calendar year 2008, and to define the
goals and vision for the future of the Department in 2009 and beyond.
MISSION STATEMENT
Our mission is to enhance the quality of life through responsive, efficient, and
cost effective delivery of services consistent with community values. With
sound management, fiscal responsibility and professional care, the
Department will preserve and protect the infrastructure resources of the City,
creating a safe, clean and enjoyable environment for residents and businesses.
Public Works Annual Report 2008
2
THE DEPARTMENT
The Public Works Department includes 26 staff members in both the Engineering
and Public Works Divisions. The Operations Superintendent and Public Works
Supervisor work together to manage a staff of 15 maintenance workers and 2
mechanics. The City Engineer leads a staff of 5 others in the Engineering Division.
Mechanics
Bill Murphy
Dean Sandstrom
Director of Public Works City Engineer
Andy Brotzler
Maintenance Workers
Bob Barfknecht
Randy Bellmore
Tony Caterina
John Cusack
Eric Day
Matt Forse
Doug Holzer
Dick Howe
Mark Joosten
A.J. Korpela
Vern LaBeau
Chris Manship
Ryan Rausch
Steve Strese
Joe Werden
16 Seasonal Workers
Operations Superintendent
Rick Cook
Public Works Supervisor
Jim Koslowski
Public Works Secretary
Cindy Dorniden
"Perfection is not attainable, but if we chase perfection we can catch excellence."
Vince Lombard
Public Works Annual Report 2008
1
Engineering and Support
Morgan Dawley
Mike Kasel
Rich Lonnquist
Christine Watson
Leadership
Andy Brotzler, Jim (Kose) Koslowski, and Rick Cook provide strong
leadership and vision for the Department. Utilizing their many years of
experience in Public Works operations and management, they have initiated
changes in the
Department that have
led to greater efficiency
and effectiveness than
ever before. The
Department has
improved its operations
with new technologies
and procedures that will
provide benefits for
years to come.
Congratulations to Jim Koslowski (pictured above, center) for receiving his
American Public Works Association Certificate in August. Jim's
coursework included classes in Public Works Organization and
Administration, Management and Communications, Operations and
Maintenance, and Technical Aspects of Public Works.
Teamwork Professionalism Integrity Accountability
Public Works Annual Report 2008
Engineering
Andy, Morgan, Mike, Rich, Christine
and Cindy maintain close contact
with developers, contractors and
residents to ensure compliance with
all City policies and codes relating to
our infrastructure.
4
Parks
The parks crew maintains over 260
acres of park space in 23 parks.
Thanks to Tony, Steve, Mark,
Ryan and Joe, our residents can
enjoy the cleanliness and beauty of
our City parks.
Mechanics
Dean and Bill keep all City vehicles
and equipment in peak condition.
Their behind the scenes work
allows staff to operate safely and
efficiently.
Public Works Annual Report 2008
Utilities
Randy, A.J., Doug, Dick and Chris
keep the water supply, sanitary
sewer, and storm water systems
functioning smoothly.
Streets
Vern, Eric, John, Bob and Matt
work together to maintain 102
miles of streets and 92 miles of
sidewalks and bike trails.
5
2008 HIGHLIGHTS
Right of way management
ROWay, a convenient and user friendly web -based right -of -way management
application, was activated on January 1, 2008. This online tool enables efficient and
effective management of the utility permits and right -of -way work that occurs
throughout the City. Combined with the City's right -of -way ordinance adopted in
2007, ROWay allows our Engineering staff to better protect and manage public right
of way construction. In 2008, the City issued 91 utility permits through ROWay.
Based on permit fees established in the Fee Resolution, the right -of -way permit
revenue in 2008 was $20,899.
CarteGraph and GIS
In 2008 we began using CarteGraph's
PAVEMENTview for our Pavement
Management inspections and analysis.
We also expanded our use of
CarteGraph to include WATERview to
record inspections and maintenance
information for all our hydrants.
Aided by interactive maps and other
GIS tools, staff is able to enter valuable
information directly into CarteGraph
from the field using laptops or other
mobile devices. Whether its hydrant
flushing, sign maintenance, pavement
inspections, utility locations, or sewer
jetting, our staff is equipped with time-
Fuel Consortium
In an effort to better deal with fluctuating fuel prices, the City joined a state -wide
fuel consortium late in 2008. Through a state contract administered by MnDOT,
the participating agencies are able to purchase set quantities of fuel at fixed contract
pricing for the 2009 calendar year. This helps to eliminate the impact of market
fluctuations, and allows for more accurate budgeting and expense forecasting.
Combined with a nationwide decrease in fuel prices, the City's membership in the
fuel consortium should provide significant savings in 2009.
Public Works Annual Report 2008
saving devices and information,
enabling them to be more efficient and
effective than ever before.
Rich performs pavement inspections and enters
the results directly into CarteGraph from a
laptop in his truck
6
Improvement Projects
Throughout the year, the Public Works Department coordinated the completion
of several improvement projects, including a new hockey rink at Jaycee Park, a
new tennis court surface at Claret Park, a complete pavement removal and
replacement for the Schwarz Park parking lot, and the interior and exterior
painting of Fire Station #1 and the Public Works north building.
Water System
Construction on our newest well was
completed in 2008. Well #15, located
in the Meadows of Bloomfield
neighborhood, was completed and
will be online early in 2009. The
City also decommissioned Well #3
and demolished the well house,
making room for additional staff
parking on the east side of City Hall.
Public Works Annual Report 2008
Capping Well #3
7
Construction Projects
The Engineering Division coordinated the work on several construction
projects in 2008:
Harmony 5th and Pickens Plat The final phase of the Harmony development
located on the northeast corner of Trunk Highway 3 and Connemara Trail.
Brazil Trail A new pedestrian trail
connects the north end of the Koch Trail
to Brazil Avenue just north of the ball
fields. Another segment provides a
connection along Brazil Avenue from
Upper 138t Street West to the existing
trail on the south side of Connemara
Trail.
CSAH 38 turn lanes at Shannon Parkway This joint project between the
City and Dakota County created an eastbound right turn lane and a
westbound bypass lane on CSAH 38 at Shannon Parkway.
CSAH 42 Shannon Parkway intersection improvements This project
began in 2007 and was completed in 2008. The project included a new signal
system with protective /permissive left -turn phasing on Shannon Parkway,
and a realignment of the north /south thru lanes on Shannon Parkway with
concrete medians.
Public Works Annual Report 2008
8
Safe Routes to School
In November 2008, the City Council
authorized the submittal of two grant
applications for federal funding
through the Safe Routes to School
program, which is administered by
Mn /DOT. The program provides
communities and school districts the
opportunity to secure federal funding
to improve conditions for bicycling
and walking to school. In March
2009, the City was awarded $35,000
for non infrastructure projects that
were included in the application. Staff
will begin planning and implementing
some of the improvements and
activities in 2009.
Public Works Annual Report 2008
SCHOOL
The Next Generation
In August, the City sponsored its first "Take Your Kids to Work" day,
allowing employees to bring their kids in for a first -hand look at how the City
operates. Highlights of the day included tours of the Public Works facilities
where kids were able to climb into the driver's seat of the large equipment, and
take a tour inside the Bacardi water tower and Well House #14. Public Works
staff was available to answer questions and teach the youngsters more about
the importance of Public Works operations.
Family members enjoyed tours of the Public Works facilities during "Take Your Kids to Work" day.
9
PAVEMENT MANAGEMENT PROGRAM
The Pavement Management Program (PMP) is designed to protect and extend
the useful life of paved surfaces throughout the City. With careful planning and
diligent effort, the goal is to maintain the highest performance standards while
reducing the overall long term costs of managing the City's street infrastructure
system.
As part of the PMP, annual field inspections are performed by engineering staff
on a rotating basis so that each street is inspected every three years. Based on
the information gathered from the field inspections, streets are assigned an
Overall Condition Index (OCI) ranging from 1 to 100 to identify surfaces most
in need of improvements. Average target OCI values have been set at 75 for
collector streets and 60 for local streets. In February 2007, Council adopted a
report that identifies a 4 -5 year program for the improvement of streets that fall
below the target OCI values.
The 2008 Pavement Management
Project included surface improvements
to approximately 1.2 miles of urban
streets in the Winds Crossing
neighborhood, including Claret
Avenue, Cornell Trail, 156t Street
West, and Cicerone Path. The contract
amount for this project was $817,047.
This project also included the addition
of approximately 3,520 feet (.7 mi) of
new sidewalk in accordance with the
adopted Trail /Sidewalk Plan.
Street improvements in progress on156 W
A map of the 2009 scheduled street improvements is included on the next page.
Red highlighted streets will receive a sealcoat (this includes Doyle Path in eastern
Rosemount, not shown on map). Blue highlighted streets will receive a full
reconstruction with utility improvements.
Public Works Annual Report 2008
10
City of Rosemount 2009 Street Improvements
Public Works Annual Report 2008
11
STREET, SIDEWALK AND TRAIL MAINTENANCE
The Public Works Department has a crew of five maintenance workers
dedicated to year -round street, sidewalk and trail maintenance. They provide
ongoing structural and operational maintenance for 103 miles of City -owned
streets, 92 miles of sidewalks /trails, 152 cul -de -sacs, and 18 parking lots.
One notable change indicated in the graph below is the decrease in staff -hours
spent on street sweeping since 2006. By eliminating the use of sand for winter
ice control, there has been a noticeable decline in time spent on sweeping,
especially in the spring.
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
2006
Distribution of Staff Time Streets
Other
Sidewalk/Trail
Signs /Lights /Omamental
I] Sweeping
Roads /Lots/Ditches
Plowing/Sanding
2007
2008
Public Works Annual Report 2008
12
Winter Operations
The City of Rosemount Public Works Department performs snow and ice
control operations on 278 lane miles of road. Of these 278 lane miles, 120 lane
miles are considered "priority" they are the first to be plowed and salted.
The remainder of the plowing includes:
158 lane -miles of non priority streets
22 miles of bituminous trails
8 miles of sidewalk
4 water towers
7 wells
7 lift stations
10 ice rinks
7 parking lots (City Hall, Public
Works, Fire Stations 1 and 2,
Bloomfield, Schwarz, Jaycee)
80.0
70.0
60.0
50.0
40.0
U
30.0
20.0
10.0
0.0
Total Annual Snowfall in the Twin Cities
Priority Plow Routes
I i !mg
98/99 99/00 00/01 01/02 02/03 03/04 04/05 05/06 06/07 07/08
Winter Season
Public Works Annual Report 2008
13
2007
Streets
Sidewalks
Trails
Salting Only
Downtown Snow
Removal
Total
of Events
12
12
5
4
Staff Hours
1837
488
36
284
2644
Avg Hours per Event
153
41
7
71
272
of Total Hours
69%
18%
1%
11%
100%
Salt Usage (tons)
1105
0
154
0
1259
2008
Streets
Sidewalks
Trails
Salting Only
Downtown Snow
Removal
Total
of Events
18
18
13
3
Staff Hours
2069
613
290
212
3184
Avg Hours per Event
115
34
22
71
242
of Total Hours
65%
19%
9%
7%
100%
Salt Usage (tons)
918
0
362
5
1285
Snowplowing Summary
Above is a snowplowing summary for the calender years 2007 and 2008. A few notable highlights are
explained in more detail below.
Average hours per street plowing event decreased 25% from 153 to 115, due mainly to the
following factors
Minor route and equipment changes led to increased plowing efficiency
Varied weather conditions
Average hours per salting event increased significantly from 7 to 22, due mainly to the following
factors
Exreme weather conditions in the winter of 2008 required more attention to salt
applications (colder temps with more rain /sleet precipitation)
Increased salting as a preventive measure to reduce the amount of plowing necessary
Several weather events in 2008 required salt applications two days in a row. When
tracked as one event, this significantly increases the "per event" number.
Salt usage during plowing events decreased 17% despite 50% more events. This is due mainly to
improving our application techniques and reducing the application rates to 200 400 pounds per
lane mile (down from 400 800 pounds per lane mile used in the past). Further explanation of
this can be found on the next page.
Public Works Annual Report 2008
14
2004 2005
2005 2006
Sand and Salt Purchases
2006 2007
2007 2008
Salt San. rave 11 otal ost
Public Works Annual Report 2008
2008 2009
15
$75,000
$65,000
$55,000
$45,000
$35,000
$25,000
$15,000
$5,000
Beginning in November 2008, efforts were made to reduce the amount of salt applied for
winter ice control. By training staff on proper application techniques and utilizing the on-
board computers for tracking salt usage, we are better able to monitor our ice control
operations and reduce the amount of unnecessary salt applied during each event. The desired
application rate is between 200 and 400 pounds per lane mile, depending on the type of salt
used and the weather conditions. In past years, salt was being applied at a rate of 400 to 800
pounds per lane mile. As a result, the City reduced its overall salt usage by 35% over the
2007/2008 winter, despite having double the number of events requiring salt.
Salt
Sand/ Gravel
Total
Winter
Tons
Cost
Avg Cost/Ton
Tons
Cost
Avg Cost/Ton
Cost
2003 2004
793
$28,700
$36.20
2469
$9,476
$3.84
$38,175
2004 2005
1059
$39,472
$37.29
902
$3,552
$3.94
$43,024
2005 2006
1386
$56,173
$40.52
1122
$4,200
$3.74
$60,373
2006 2007
1192
$51,521
$43.24
499
$1,969
$3.95
$53,490
2007 2008
1618
$74,831
$46.26
102
$1,320
$12.94
$76,151
2008 2009
1055
$64,963
$61.61
85
$1,403
$16.46
$66,366
Totals
7101
$315,660
$44.45
5179
$21,920
$4.23
$337,580
2004 2005
2005 2006
Sand and Salt Purchases
2006 2007
2007 2008
Salt San. rave 11 otal ost
Public Works Annual Report 2008
2008 2009
15
$75,000
$65,000
$55,000
$45,000
$35,000
$25,000
$15,000
$5,000
Beginning in November 2008, efforts were made to reduce the amount of salt applied for
winter ice control. By training staff on proper application techniques and utilizing the on-
board computers for tracking salt usage, we are better able to monitor our ice control
operations and reduce the amount of unnecessary salt applied during each event. The desired
application rate is between 200 and 400 pounds per lane mile, depending on the type of salt
used and the weather conditions. In past years, salt was being applied at a rate of 400 to 800
pounds per lane mile. As a result, the City reduced its overall salt usage by 35% over the
2007/2008 winter, despite having double the number of events requiring salt.
Utility Statistics
2006
2007
2008
Miles of water main
116
119
119
Miles of sanitary sewer
85
90
90
Miles of storm sewer
75
78
81
Hydrants*
1,049
1,082
1,279
Sumps
1,758
1,745
1,739
Total gallons pumped
944 MG
938 MG
910 MG
Average gallons of water pumped per day
2.59 MG
2.57 MG
2.49 MG
Average gallons of water pumped per day
(Jun Aug)
5.08 MG
4.79 MG
4.79 MG
Max gallons pumped in a single day
6.37 MG
(July 30)
7.63 MG
(Aug 1)
6.65 MG
(July 3)
UTILITIES
The Public Works Department has a crew of five maintenance workers dedicated to
the ongoing maintenance of the water, sanitary sewer and storm sewer systems. The
following table summarizes the components of the utility systems:
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
Hydrant numbers for 2006 and 2007 are estimates
Some catch basins were wrongly identified as sumps in 2006 and 2007.
Distribution of Staff Time Utilities
2006 2007 2008
Public Works Annual Report 2008
AII other tasks
Sump cleaning
Structures
Hydrants
Water meters
Locations
"'Jetting
Well house lift station
16
Sanitary Sewer
The quality standard for sanitary sewer maintenance is to clean 1/3 of the 68
miles of City- maintained sewer annually (City staff does not clean private lines
or lines greater than 12 inches in diameter). In the past two years, nearly 2,000
staff hours were spent on jetting activities, with an average cost (staff time and
equipment) of $3,060 per mile cleaned.
Utilizing a truck- mounted laptop with CarteGraph and ArcGIS, maintenance
workers record jetting activities on -site for each line as it is cleaned. They are
also able to document issues and create reports to follow up on any necessary
maintenance or repairs.
30
25
20
10
5
0
Miles of Sewers Cleaned
2000 2001 2002 2003 2004 2005 2006 2007 2008
Public Works Annual Report 2008
17
Storm Sewer
For the past three years, all catch basin sumps have been inspected annually and
measured for debris. All sumps that are more than 50% full are cleaned and
documented in order to comply with NPDES requirements. Prior to 2006, sumps
were cleaned on a rotating basis,
approximately once every 3 years. This
method was inefficient and costly; some
sumps were unnecessarily cleaned year
after year, while other sumps that needed
cleaning were skipped until their next
"rotation." The chart below illustrates the
cost and time savings the City has realized
since switching to the new method of
inspection /cleaning in 2006.
f
Inspection= $3 each (staff +equipment, avg 3 minutes)
2004
2005
Sump Cleaning History
2006
2007
mil# Cleaned —0—Estimated Cost
2008
Public Works Annual Report 2008
2009 estimated
$25,000
$20,000
$15,000
$10,000
$5,000
In accordance with the Public Works Quality Standards, inspections of all the storm
pond inlet: and outlets began in 2008 and will continue throughout 2009. On -site
inspections allow our maintenance staff to assess the condition of each structure and
document any necessary repairs or updates needed.
18
0
U
Water Supply
In 2008, the amount of water pumped through our system decreased 3% from the
previous year, going from 938 million gallons in 2007 to 910 million gallons in
2008. Peak usage occurs in June, July and August when our average daily usage is
nearly double what it is during the rest of the year.
Our water system's firm pumping capacity in 2009 will be 8.64 million gallons
per day once well #15 is online. The firm capacity is calculated by adding the
pumping capacity of all the urban wells together, leaving out the well with the
largest capacity (well #9, 2.3 million gallons per day).
1,000
900
800
700
600
500
400
300
200
100
Average gallons per day
2006: 2,586,482
2007: 2,568,605
2008: 2,494,239
1999
2000
2001
2002
Water Usage By Year
(total gallons pumped)
2003
2004
Public Works Annual Report 2008
2005
2006
2007
Qtr 1 Qtr 2 Qtr 3 e Qtr 4 Total I
19
2008
Rainfall (inches)
:y
2004
May
6.39
Jun I
3.06
Jul 1 Au
3.36 1.19
Se
4.21
Total
18.21
2005
2.78
424
2.94 5.22
4.44
19.62
2006
2007
156
2.81
1.29 t 6.90
244
15.10
1.99
205
3.29 1 9.32
6.04
22.69
2008
2.53
2.70
2.13 3.35
1.78
12.49
•source Univer
15.35
ury of Minnesota
14.86
climate
13.01 25.98
weDSlte
18.91
88.11
A ir li
.4111/ 1 \Il lk
AlAllirff.:0" x
irffir x i
fir
�f
N
0
200
180
160
140
C
co
p 80
Water Usage By Month
Jan
Average gallons per
day in 2008:
2,494,239
Feb
Mar
Apr
Average gallons per day in
Jun, Jul, and Aug 2008:
4,794,400
May Jun Jul Aug Sep Oct Nov Dec
-0-2004 -t 2005 2106 2007 2008
Public Works Annual Report 2008
20
Water Testing and Sampling
Regular water testing and sampling ensures safe, clean drinking water for all residents.
Samples are taken by members of the utility crew, and come from various locations
throughout the City, such as gas stations, apartment buildings, businesses, park
shelters, etc. This list of sampling sites is numbered and given to the health
department, and the sites are referred to by number only, not by address. The main
requirements for a testing site are:
The sites must allow daily, long -term access for us to draw samples
The sites must be distributed evenly across the system, not clustered in one
area
Testing and sampling activities are performed according to the following schedule:
Collected first Wednesday of each month
Tested every 3 years (done in 2007)
Collected and tested by State
Chlorine
Residual
Radiochemicals
Monitored by City
X Collected and tested by State
Public Works Annual Report 2008
21
PARKS AND GROUNDS
The Public Works Department has a crew
of five maintenance workers dedicated to
the maintenance of 267 acres in 23 parks.
Over 11,000 (full -time and part -time) staff
hours were spent on park related tasks in
2008 in an effort to provide a safe, clean and
attractive environment for residents to
enjoy.
Steve gets the ball fields at Shannon Park ready
for game play
Public Works Annual Report 2008
In July 2008, our maintenance crews spent
over 730 staff -hours helping hundreds of
residents clean up debris after a major
storm passed through the south metro.
Using CarteGraph, we were able to
estimate the cost of the storm clean-up
efforts to be nearly $31,000 in labor and
equipment. In 2007, similar storm clean -up
efforts cost an estimated $26,000.
Crews clean up debris after a major storm in July
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
Distribution of Staff Time Parks and Grounds
2006
2007
2008
AII other tasks
Playgrounds /structures
Seed /Fertilize /Irrigate
ORink maintenance
OLandscape Trees
Field maintenance
Mowing /trimming
22
In 2008, efforts were made to reduce the amount of water consumption in City
buildings and parks. Despite a 10 -inch decrease in rain from 2007, staff was
successfully able to reduce the amount of water usage by carefully timing and
monitoring the irrigation activities. The following chart and table illustrate the
results.
Location
35
30
25
20
15
0
ca
10
City Hall
Acres Irrigated ..........................._1.1
Avg inches/ week- 200'
Avg inches/ week 2008 1.1
change
Water Consumption in City Buildings and Parks
1999 2000 2001 2002 2003 2004 2005 2006 2007 2008
Community
Center
2.6
07
0.4
-43%
Fire
Station 1
Irrigation Summary 2007 2008
10
07 i 03
-30% -50%
1 5 1.3 3.7
1.2 3.0 0.9
1.0 1 1 0.7
-17% -63% -22%
Connemara
07
06
-14%
Public Works Annual Report 2008
Jaycee
Meadows
127 1 69
0.6
Fire Station 2 only irrigated for about 8 weeks in 2007 (new sod seed)
Shannon
Winds Total
14.3 23 495
0 5 0.9 0.8
0.5 0.8 0.6
0% -11% -25%
23
FLEET MANAGEMENT
The Public Works Department
employs two full -time mechanics
responsible for maintenance and repair
of 63 City vehicles, 31 heavy
machines, and more than 200 pieces of
small equipment. Over 3,500 staff
hours were dedicated to maintenance
and repair in 2008, with an additional
1,600 staff -hours spent on equipment
cleaning, seasonal changes, and supply
runs.
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
Distribution of Staff Time Fleet Maintenance
Other
Seasonal
o Cleaning
Maintenance
Repair
2006
2007
Public Works Annual Report 2008
The mechanics' behind the scenes work
keeps our fleet running smoothly
2008
24
J
10
9
8
7
U6
t
5
43 4
z
3
2
1
0
0 -2 yrs
3 -5 yrs
Age of Equipment
(excludes Fire Department)
6 8 yrs
2004 2005 2006 2007 2008 2009
5.6 5.5 4.9 5.3 5.5 6.5
Fleet Maintenance Cost Distribution in 2008
(includes parts and labor costs)
I Fire Police PIN Mowers Misc I
Public Works Annual Report 2008
9 -12 yrs more than 12 years
25
Fuel
The Public Works Department supplies fuel for all City vehicles and equipment. In
2008, the City spent $175,400 on 59,700 gallons of fuel. Consumption for 2008 was
slightly below the 4 -year average of 60,800 gallons. Fuel usage is historically the
highest in the summer months when street and park maintenance is at a peak, and it
can be significantly impacted from year -to -year depending on the amount of winter
precipitation. See Appendix A for a detailed mileage and fuel usage summary for the
City's fleet.
Fuel Purchases from 2002 to 2008
Change in Cost/Gallon Diesel Unleaded Total
2006 to 2007 12.2% 12.3% 11.8%
2007 to 2008 21.4% 9.9% 14.2%
2004 to 2008 141.9% 72.0% 89.2%
Change in Cost Diesel Unleaded Total
2006 to 2007 26.7% 21.8% 23.7%
2007 to 2008 21.6% -3.1% 6.5%
2004 to 2008 286.6% 131.2% 181.6%
Change in Gallons Diesel
2006 to 2007 12.5%
2007 to 2008 0.4%
2004 to 2008 60.1
Unleaded
7.3%
-12.4%
27.7%
Total
9.3%
-7.4%
39.6%
Avg /Gal includes .20 per gallon state fuel tax through March, 2008.
From April through July 2008, the state fuel tax is .22 per gallon.
From August and September 2008, the state fuel tax is .225 per gallon.
Beginning in October 2008, the state fuel tax is .255 per gallon
Public Works Annual Report 2008
26
Diesel
Unleaded
Total
2002
18,011
$17,445.47
$0.97
30,208
$35,547.84
$1.38
48,219
$52,993.31
$1.30
2003
17,003
$17,412.62
$1.02
30,307
$38,141.27
$1.46
47,310
$55,553.89
$1.37
2004
15,670
$20,223.17
$1.29
27,109
$42,054.77
$1.75
42,779
$62,277.94
$1.66
2005
23,004
$43,265.29
$1.88
37,107
$69,452.97
$2.07
60,111
$112,718.26
$2.08
2006
22,203
$50,759.27
$2.29
36,810
$82,381.07
$2.44
59,013
$133,140.34
$2.46
2007
24,988
$64,297.66
$2.57
39,508
$100,339.47
$2.74
64,496
$164,637.13
$2.75
2008
25,095
$78,183.09
$3.12
34,613
$97,218.69
$3.01
59,708
$175,401.78
$3.14
Fuel
The Public Works Department supplies fuel for all City vehicles and equipment. In
2008, the City spent $175,400 on 59,700 gallons of fuel. Consumption for 2008 was
slightly below the 4 -year average of 60,800 gallons. Fuel usage is historically the
highest in the summer months when street and park maintenance is at a peak, and it
can be significantly impacted from year -to -year depending on the amount of winter
precipitation. See Appendix A for a detailed mileage and fuel usage summary for the
City's fleet.
Fuel Purchases from 2002 to 2008
Change in Cost/Gallon Diesel Unleaded Total
2006 to 2007 12.2% 12.3% 11.8%
2007 to 2008 21.4% 9.9% 14.2%
2004 to 2008 141.9% 72.0% 89.2%
Change in Cost Diesel Unleaded Total
2006 to 2007 26.7% 21.8% 23.7%
2007 to 2008 21.6% -3.1% 6.5%
2004 to 2008 286.6% 131.2% 181.6%
Change in Gallons Diesel
2006 to 2007 12.5%
2007 to 2008 0.4%
2004 to 2008 60.1
Unleaded
7.3%
-12.4%
27.7%
Total
9.3%
-7.4%
39.6%
Avg /Gal includes .20 per gallon state fuel tax through March, 2008.
From April through July 2008, the state fuel tax is .22 per gallon.
From August and September 2008, the state fuel tax is .225 per gallon.
Beginning in October 2008, the state fuel tax is .255 per gallon
Public Works Annual Report 2008
26
Public Works
60%
Department Share of Total
Gallons of Fuel Pumped in 2008
Other Fire
3% 4%
Totals for 2008
Public Works 37,602 gal
Police 20,370 gal
Fire Department 2,682 gal
Other Departments 1,913 gal
Police
33%
8,000
7,000
6,000
5,000
0
4,000
3,000
2,000
1,000
0
Jan
2003 54,052 gal
2004 56,048 gal
Fuel Usage by Month
moor ,z
rrurl oc\oi
C)
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2005 58,914 gal
2006 54,562 gal
2007 64,008
2008 62,568
l 5 year Average 2008 I
Public Works Annual Report 2008
27
VISION FOR 2009 AND BEYOND
Technology leading the way!
We recognize that the future is shaped by the decisions and actions of today. As the
City continues to grow, our services must adapt to meet the changing needs of a
diverse population. We must embrace technological change, and utilize our past
experiences to continually improve upon our services, today and in the future. Our
goal in 2009 and beyond is to continually strive to meet the goals of Council, to
become more proactive and efficient in our activities, and to consistently fulfill the
objectives defined in the Public Works Quality Standards.
We will continue to expand our capabilities with CarteGraph and GIS, finding
new ways to improve our workflow, track information, and generate useful
reports that will help with decision making in the future.
Improved mobile technologies will allow us to complete routine activities more
efficiently and effectively than ever before. Using our mobile technologies, the
following projects are scheduled for completion in 2009:
Comprehensive streetlight inventory
Detailed inspection of all catch basins
Detailed inspection of all storm pond inlets and outlets (started in 2008)
Increased attention to long -term planning will ensure greater efficiency and
accuracy during budgeting, as well as provide clear direction for future projects
and activities (see "Vehicle Replacement Analysis" and "Long -Term Project
Schedule" in the Appendix for examples of planning and budgeting tools).
Public Works Annual Report 2008
28
The following charts were developed as a budgeting tool to help determine the ideal
replacement date for Public works pickup trucks and dump trucks. In general, replacement
should be considered when the cumulative maintenance costs exceed the value of the asset.
On average, this occurs at 10 years for pickup trucks and 12 years for dump trucks.
$40,000
$35,000
$30,000
$25,000
$20,000
$15,000
$10,000
$5,000
$0
Maintenance and Repair Costs
0
Vehicle Replacement Analysis Public Works Pickups
2
4
Trucks used are model years 1997 (1), 1999 (2) and 2000 (3)
6
8 10
Age in Years
12
$160,000
$140,000
$120,000
$100,000
$80,000
$60,000
$40,000
$20,000
$0
0
Vehicle Values
2
Vehicle Replacement Analysis Public Works Dump Trucks
4
Estimated salvage value 25% of purchase cost
6
8 10
Age in Years
12
Public Works Annual Report 2008
30
N LL V)
E
N C
c
0
0
N C
0) 7 (p x
w C N
a >a` c O
2
NM0 N M Tr OOO T- N NCC00( Tr MM M (0CA N.O
C f� CA 00 CV Y OD O O CV CD UD
N O N O O CO
U2 r- O OD D innMM CD111nzr Y— U NO o C0 Y 000�CA
c
0
0
0
U
E
Z
0 000000000000 0 000 00 0000000
0 0 0 0 0 0 0 0 0 0 0 0 0 0 00
co •a- co co O M O N st co CO M N M NOM N. (O (O n
LC) to Cn (O V CA O (n
EA to to to to E9 to EA to E9 E9 E9 to 69 'j to to to 69 to to to E9 to o to
U/ 4 0) M CO 0) CO 10 0) CO M st
t
st O o 0 N 00 0) O st O 0 CO 0 co (O N Tr d 00 O 0 M
M d' tf) N N O N O) co t1) O) co C O CO (n 0 to 0 st 00 M l[) (O
cs) co CO d M st CO 0
to co 69 69 69 69
E9 Ea Ea Ea Ea Ea Ea Ea EA 69 Ea E9 69 Ea
4
OD CD .at 0. co CO N CO L() n- M p) N M OD O O a-- nit O) M a- CO M CO I�
N c0 st O O O CD OD M OD N st sY CD CD CO Q1 CD CO Is. I- OD 0) CO
O O O CO CO O CO CO N N N N K)
69 LO N ����69E9�69COEa E9 E9E969696969E9Ea69Eafa
r"NO .-C)MC100�^ 40(0 4v( t`NM(0
CV D ONn OM N. ci o) ti NO et� 0(1 ON
N M
CO N N (0 CO CO Co) N N N M
EA. N N E9 E9 CV N to CV M faEa6969EA6969Ef9
61 EA EH 69 69 EA 69 69
N�( C CO O 00 Of) Is- CV NOD CV M 0) 0 000O)0et
ON OD 0 N st CC) CO C N D N. O C:-1 1) N N M 01 0) -0)
O MNN MNO 0V 0V CO��hOCOM
N 0)0 00 (0000000).
NMCV OOMCV co0)
0 CO 0 0 0 0 0 0 0 0 0
m c c c Ea o c c m c m c m
23334)033'12373316
7 0 0 0 0 0 aao 0.0 0.
F a 0 0 0 0 0 g U I E
O 10 17 U 17 17 17 17 17 13 17 'D 17 17
CO Ca CO Ca CO Ca Ca Ca CO la (a CO CO Ca
7777777=77777=
Cr Cr Cr Cr Cr Cr Cr Cr Cr Cr Cr Cr Cr Cr
V) 0) CO CO V) CO CO CO CO CO CO CO 0) CO
O O O O O O O O O O O O O O
Nco) 10 OOt-00O) O N� (A
MMM
MMOg
Yi;M CC! 0 00N1. NCD
0) CC CD N N 00 CV O 06 0V
O N O O N N N O O O O N N
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
N O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0
N (4) CO LO 0 0 C17 O (p (4) CO CO (1) 10 0 0 M O (O (O
to. CA 6 N 4 6 N N
9 69 EH VD 49 0N9 H A. EA 6 d9
N 00 CO 00 O O CO CO s t a- N 4 10 co M 0) O 1) M O 10 O 4 O g h
Ca o. MM Mco CO -00 f, Cn to l� �I� (�N O�� 81,2,94
a v to CV 606 t 696964 EA t ER 6 0 9 t 604 a Di Z.; CO ce) E 6 0 9
0 ON.00 Is- 0)000Oh .—O(0(()hCO OM0)CO. 000C�Y NCOCO
O) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0) 0) 0) O O
c CO CO D 0 0 0 4 0 0 4 1 NI r-st CD O CO OD .stet
2 0 O O.— O.— O'— N N O Y N O O N O N N O O N O O N
7 M 03 co CDC1)(1)000Oh M 0 .-P� (n -M('-
CL 0 0000- 00000000 000 000
222
o (9 (.9 S
j 0 .E 0 0
0
N V c) E j U U U 2 al a)
d d J d d d d 0. d I CC
N N N N 2 2 N N 2 N N N
LL it it it it 11_ it it LL it LL it
O M N M stCO h tO
NN�
O00000)0
N O u) (1) 11) (O CO 11) CO (1) CO O
MM C')MMMMMMMMM
C Q
O
i5 15 O O O O O O O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 O O O O 0 0 0 0 0 0 O O O O O O O O 0 O. 0 0 0 0 0 0 0 0
C U N N ti O e- CC) M r M N N CO O I.-- O t` O O CO O k.:'. et CO O (0 N N N O (0 0)
C c M N M N N N N N N N N N M 00 N M 3 O a0 f` r O o0 CV
N 7 EA) EA)fA) EA) EA) ffl EA) ff)EA) EA EA) EA) to EA) EA) EA) EA EA) EA)fA) SEA) Ffl EA) EA) EA) EA EA) EA) ea EA) ea EA) ea
a O
17 0)
(U f0 C U
co 0 E N
N C 0 0
w 0
N
(1) LE m
t0
E 0
y C
U
C) 0 CO x
0
N c c
Q Q CO
2
0) 0
N
et
C N
t N
U 2
O (0 mt d° O N 00 (0 N CO CA CO (0 O M M d' N 0) 0) CA M N (0 O
M O a M e r O e- N CO M M 0 N M CO M CO 0 0 N
(0 N M N N N N CM M N N N N st N C") d M (O N- ("5
EA) EA) EA) Ea 03 EA) 69 Ea Ea Ea EA) Ea EA) Ea2;;Ea Ea EA)fA) Ea Ea Ea EA) EA) Ea Ea
C0 O w n O O) r- r- s- (1) F- O O M C0 M MN- M O 0) N
O 0) 0 I N CON N 0) CA C O CO ti 0 O< N- CON O) C O C D C V N- QM
N CO f` 0) N ((1 N- N- CO CO O O In mr N O O CA mt O mr m
EA) EA) 69 69 EA) ER 0) 69 EA) Ea EA) EA) EA) Ea( �Ea
CO Tr OO M Nf-O O( M O
O M COrs O(A CA Nr M NO O O COO 0 NOO
M(nNM C'0 N(0N �MM(n (0 0)0) CO 0) N
EA) EA) EA)Efl EA) EA) 69 EA) EA) El, ffl
MMMTr Tr Tr CAMe (O SMTr NNf- Tr 00 O CID OD01 00N mt OOMMCOODCV OD CD
0 M Off) CO CA 0 OD 04 OD N O M O N OD CD InO O D NO
M aS6r: Ah(A'i(A (A(nr: C6 Nf:(A(ri rs MN I: Tr' r: 0/
M_ 0p O) O O Is. OD 00 CO Nr N N N 10 M CA e-
(0 h (n Mt CA Nr N (A (A r- CC) Tr CO M M 0) CO M
OD (0 00 (n (A O M 1.11 O f- 00 CA (A M (A M 1- M
M 0 N mr mr N. cci m M N M DO V 0 (0— O M.- O
N '7 N O.-NMNc) if) .—ONN0CAO.
O C7 CC66ciri6000OC 66ri CV criODCV r)
M0000) CD
0) OD OD 000
CO O
CD 0 p C M N O (0
Ea Ea
.-,-(*).-01,01 N
CO M a0 O CO CO
(0 CO F O M
EA) d4 EA) EA) EA)I EA)E)
co r N (M DI M co
EA) 69 a EA) EA)
EA
M (f)(Of- O 0) 100 OD N.— (0
5R 000O hMI- I- NTr O g f�
OD m f` ma: N C' co co O) CO M
co (0 C OD M.- 0) M M co 0 M
N O° N N O M N
O O O O O O O O O O O O O O O O O O O O 0 0 0 O N N O 0 0 0 0 0 0 0 0
O 0000000000000000000
000
O 00 m> O m> O ((10000100000000
n I- 1,7 (O (0 CO O (0 CO CO CO (O CO N- h 10 (C) 1- CO
to EA) EA) EA) EA) EA) EA) EA) 69 EA ER EA EA 0) ER. EflEflEAEf)
p 000 p 0 o 000
O 0 00 0 0 0 0 0_ 0 0
(1) O)
6
O 0000000
0 0 0 0 0 0 0 0
0
000)01 100
M (ONNMM'-
la fa EA) EA) EA) EA) EA)
03.11 e-C a 0 0. e 0CNC 0001 NN NO�f CO. ON OGNOOMCD(00
0)(O(nMe CVr.mr DOONr-mt mt OON(0OD O NTr(Oa0
L
C;aDM CC; CC; ma CC; I.: CC; :O CC; MNMCM ma N<4 0 O'— N coOOOv.; C e;
d ta to t It toto ea d9 EA)EA) EA)EA)EA) EA)EA)EA)EA) E9
O 0) 0)MM mt CO h1'-00f-CD OD000— .-(O 0 (O
(O CO 0) CO 0OO
co O 0) O O O O O O O O O O O O 0) O O O O O O O) 0 0 0 0 0 0) O 0) O O O O C A
CO 0 01 (0NOD000Omt 10 V 0000MM N000DOD .—NCO .—I -h I.N00M aD 0000.—
U O N'— O O N r- O O N M O O O N.— O— O O N N N N N N N O O O. N 0
a O 0 mt 0 0 0 0 0 sr 0 0 0 0 M 0 0 0 mt 0 CO 0 0 0 CO 0 0 0 0 0 0 0 0 0 0 0
CI 3
0 0000000000000000000 a� a� 0 d m m m Ul C (0(0(0 (0M( 0 00 0 )0/0/0( 0 /CV C C0 0 0 1M +)0) 0)1)2 C 0) C y C lit O_ C=
LL LL LL CL LL CL CL LL IL LL LL CL CL CL LL LL CL LL LL CL C _C c_ 6 C 0 t0 C co O 0 1
CD. O. O. O. O. 0. a 0. O. O. an 0. a 0.0. aaa 0. U) (n U) 5 4 F2 1 1 y 0
c 0.0. 0. 0.a 0.0.
o 0 3 2
y Y Y Y Y Y Y Y- Y- E E E E E E E Y C a U U g c c
N U V U U U U V U U U U U U U U U U U U U A>>>> CO CO x 0 0 co CO CO
0 a ft. CI_ a ti. aaa 'EL aaa 0000000 0 idu LH CC
aid
O 0 COhC —N100) NM 10000 N M NI' (0 00 O N M.— MNM
a) 7 00 OD0101 NMMM 010101 V C (0 00 00 01C OD
jZ MMMMMMMMMMMMM MM CC''�7M M
C a
0
g•(a a 0 0 00 o 0 0°? 000 corn °OO
o co v_ r
O 0 3 69 CO 6 9 EA E9 69 ca 69 69 69 EA 69 69 69
0 0)
7.G to O O 00 O (0 O N (O N M N (O 00
N OD f- O N 00 0) 0 0 (0 N- M 0 U)
C U) d M N Lo 0) a M N Oo 0) N
U M 0 EA 66169 (0 e 9 U L1.1 0
m O ODOTr -00Met 0 0 r-
E 15 C M cOM N. U)CDMMMM O 0De -00et
co C V 6 6 1E9 661 b9FflE969 61� 69 69 61
L11 C
a)
U
�f0 N* X 0 0 0 0 M O p.( O OP.y-et1- M O
N C y N U O) N0 U)rOM� 000
C us
Q Q V (0) w). 69 69 EA E9 E9 69 E9 44 E9 69
2
O) CO r r O (0 O) 0 CO 00 CO CO 00 U)
U
(O CO O) is t v, CO r 10 0) CO CO
N r N r et O N et N N M
Ji
ao 0 CO 0 L0 r r 0 CO
t 0) c 1,-c
C) M r N r n r r r 0) T (1 r r
yy
O L NN OONOO (Or(p0°MM r0
(n 0 07tH (V r OD c0100 6 �N�F(`M�
0
F, d m
E N f0 0 CO 0 N N N N.- N N N O O- ul
w w N
W J
a)
E m 0 O O O o pp o 0 0 0 0 0 0 c
---.g- 0 0 0 0 0 0 D 00 0 0 0 0 j 0 0 00 0 0 0 0 0 0 00 0
000 00
C o
EE
t N
OD 0 0 (O M� OM CV (0 I) C o
1� 1.s L°. U] O) m (b 7 N Iti
N.
U a P O ON �N fV o N<-
a OO 1p 0
N 1
d g 2 MOOrlO r^�,a a4 c 0 CO
O O O O r O r 0 0 0 0 O
c u) .0 o
CI N
i E :o c
w r 0 8 g
E v 0 0 e 8f, o0
d N d U m a w o
y N
y CO c bj E
c CO CO m H 0 c z E
L o n r S a- S co
m 2 2 2 p2 c 2 2 2- 2 8 03 Q) 8
0 0 0 C9 H JHHC90)JJ(n(n `-6 vi v c
C C 0 l0 C: 0
U� (DOO (ON-(00)Mf.0) -0) 10( (0 H u
0) E 0 0 0 g g g g g a g g g g S o v
>z CD 2 m d
z z LL
EN
0
ƒ
a.
k
k
k
cci
8
8
7\
k
8.
k
8
k
o
0
0
8
}7
7
8
CZ'
t
7
k
k
K
K
g
5.
8
SZOZ
000'04$
$12,000
009'1$
O
009 L$
000'13
000'3
,r
000'
0 00'ZL$
000
000'9£$
000'0£$
000'OL$
000'ZZ$
009'1$
004`SZL$
000'9c$
zz02
$35,000
$1,500
000'00$
000'Zz$
00S`Stt$
000'91$
1
009'
000'Ll$
OOS`L6$
OOS'69$
OZOZ
$35,000
009'1$
000'9e$
009'13
000 1$
11
000'015
009'1$
I
000'zes
00066$
009 t0t$
91.00
009' 13
000'04$
000'0t.$
00
0091
009 '901$
000
I 000'11$
000
INIMME
went
090 `09$
000' c$
000'13
000'01$
000' 1$
000 ZZ$
0006a$
000`06$
000'01:$
000'00$
000'00$
000 on
009'001$
000'9$1.$
009
000' 1$
000'ze5
000'oES
000'005
000 13
Pi
000'13
000 015
000'1$
I 000'1$
S.
009'065
000'04$
000' 1S
000'005
000'015
000'1$
000'015
001'995
000'05
(9002) Wiled Jouelul
uogoedsul loom I
(8000) Wiled Jouepc
(6000) Ouuoog /tedre0 I
aouwwlu!ew loom
mled Jou
Joulo
I Exterior paint
Roof inspection
(900Z) OuUooli /Para
eousueWlew yooI
Other
Interior paint (2002) (moved from 2009 to 2012)
(8002) uo!Wedsul yoom
(600Z) lured Jouep(3
Roof maintenance
Carpet flooring (2002) (some PD areas in 2009)
11
I Exterior paint
Roof inspection
Roof maintenance (2009)
Other
Interior paint mechanics (2009)
Interior paint truck bays
uo9oedsu! pod I
'led Jouepg
(6000) uo!'edsul loom
(9000) lined Jouelx3
(9000) wed Jouelul
Jey10
eoueueesew loom
I Roof maintenance
Carpet flooring (all but Rick's office 2009)
Other
Building Maintenance Totals
Avenge of next 5 years
CD
3
0
N
L
0
Y
O
O
U
n.
7 E
a�
m
1 7
0)
c
J
Building Maintenance
A
CO
N
0
0
0
8
43
m
0
N
H
E
a
a
h
(0
r
8
r
2
E
10
8
co
5
8
F
F
E
a
O
a
a
0
N
N
Y
a
P
v
Q
a
f
a
2
8
m
0)
E
a
0)
d
CT!
a
N
0
o
8
8
r
Q.
m
Q
a
E
a
d
O
a
E
0.
frl
2
a
O
8
F
E
a
c
Q
a
a
S
Long-Term Project Schedule
Park Maintenance
GA2010 EtudgehLong Term Project Schedule 2010
Public Works
000'9$
3;
000'SL$
0 00'06$
000'9$
000'96!
wW
000'9$
z 000'06$
000'9L$
$155,000 $80,000 $105,000
MEIM
000'99$
000'9$
009'9914
000'008!
00006$
000'
000 9$
000Y9t$
000`06i$
ooz Ls
000 9924
ozz$
000 L9z4
000 0I.$
oo0'9L$
000'S
000'0
o0r'zszs
000'9LZ$
000 9$
oo►zoz4
00006!
000'06$
000'9L$
000
IIMMM
000'95
00z'44L4
000'9
MEMI
oor'695
000 ICS
000'06$
000 SL$
006 8L4
0o9$9L4
00 rs
o06 sz$
000`91!
000 01$
!!eil
Playground equipment
Pla round border
Ice rink (re-built 2008)
Shelter (carpet)
iuewdmbe punwbAe!d
Pall
PI= a round border
PI= round border
Playground equipment
Pla round border
Basketball court
Shelter
6uewdrnbe punatbteld I
I!eil
iepioq Puna eld
6uetud!be punwbte!d I
!!ail
Pla round border
Basketball court stri in 2004
Playground equipment
Playground border
Park Maintenance Totals
Average of next 5 years
Long-Term Project Schedule
Park Maintenance
GA2010 EtudgehLong Term Project Schedule 2010
Public Works
N
o
N
o
N 4.
N
000'011
v
N
N
0
o
0
O
r$
000ta li
N
O
N
O
o
O
MIME
$25 000
N
N
O
N
000'$
000'9$
N
O
N
O y
wens
000'6P$'
R
R
III
000'08$
r.
ei
h
009'4$
004e$
co
O
N
oo9e84
000'00
g
oos'9zs
000'18$
R
ooE'4zs
00019$
000'98
N
O
N
OOL`6n4
000'8$
000
O
8
N
Mites
oo4Yi8$
l
N
x+
M
00Ee84
000'x$
N
N
O
a
IN
wN
R
N
009`14
000tJ$
O
4
p
a
004'4$
City Parldng Lots
Community Center east sealcoat 2004)
Community Center west sealcoat 2002)
Fire Station #1 (new 1997, sealcoat 2008)
Fire Station #2 (new 2008)
Park Ride sealcoat 2008)
Public Works (overlay 1998, sealcoat 2008)
Upper City Hall (overlay 1998, sealcoat 2008)
Lower City Hall
Bloomfield Park
Central Park w/PD sealcoat 2003)
Connemara Park sealcoat 2003)
Erickson Park
Family Resource Center sealcoat 2008)
Innisfree Park (new 2002)
Jaycee Park (sealcoat 2008)
Meadows Park
Schwarz Park (recon 2008)
Winds Park
C ity Parking Lot Totals
Average of next 5 years
Parking Lot Maintenance
Long-Term Project Schedule
GA2010 Budget Long Term Project Schedule 2010
Public Works