HomeMy WebLinkAbout6.e. Final Payment #8 - 2008 Street Improvements Project, City Project #418AGENDA ITEM: Final Payment #8 2008 Street Improvements Project, City Project #418 AGENDA SECTION: Consent PREPARED BY: Morgan Dawley, PE, Assistant City-AN Engineer AGENDA NO. ATTACHMENTS: Final Pay Voucher, Map APPROVED BY: Div RECOMMENDED ACTION: Motion to Approve Payment 8 and Final for the 2008 Street Improvements Project, City Project #418, to McNamara Contracting and Accepting it for Perpetual Maintenance 4 ROSEMOUNT CITY COUNCIL City Council Meeting: July 21, 2009 EXECUTIVE SUMMARY BACKGROUND: This item is on the agenda to request Payment #8 and Final to McNamara Contracting for the 2008 Street Improvements Project, City Project #418. The 2008 Street Improvements Project included surface improvements to approximately 6300 feet (1.2 miles) of 32 -foot wide urban streets including the following. Claret Avenue (between 155 Street West and Cornell Trail West) Cornell Trail (between Claret Avenue and east end) 156 Street West (between Claret Avenue and Chippendale Avenue) Cicerone Path (from Cornell Trail West southwest approximately 720 feet) Surface improvements to the above streets included pavement rehabilitation, installation of sidewalk and pedestrian ramps, and replacement or adjustment of utility castings. The final construction amount of $762,283.05 is 6.7% below the revised contract amount of $817,046.97. SUMMARY: Staff recommends that Council approve Payment #8 and final for the project, and accept the project for perpetual maintenance subject to the following conditions. 1. Satisfactorily showing that the contractor has complied with the provisions of Minnesota Statutes 290.92 requiring withholding state income tax. 2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the contract have been fully paid or satisfactorily secured. 3. Consent of Surety to Final Payment certification from the contractor's surety. 4. Two -year maintenance bond. G: \ENGPROJ \418 \7 -21-09 CC FinalPayment 8.doc WSB .q Infrastructure Engineering Planning Construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763 541 -4800 Fax: 763 -541 -1700 July 1, 2009 Mr. Andy Brotzler, PE City Engineer City of Rosemount 2875 145 Street West Rosemount, MN 55068 Attn: Cindy Dorniden, City of Rosemount Re: Construction Pay Voucher No. 8 (Final) 2008 Street Improvement Project City of Rosemount Project No. 418 WSB Project No. 1668 -31 Dear Mr. Brotzler: Please find enclosed the final Construction Pay Voucher No. 8 for the above referenced project in the amount of $16,325.50. Also enclosed are the following documents required for processing final payment for the above referenced project: 1. Satisfactory showing that the contractor has complied with the provisions of Minnesota Statutes 290.92 requiring withholding state income tax. 2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the contract have been fully paid or satisfactorily secured. 3. Consent of Surety to Final Payment certification from the contractor's surety. 4. Two -year Maintenance Bond (warranty start date to coincide with the date Council approves fmal payment). We recommend that you make final payment in the amount of $16,325.50 for McNamara Contracting, Inc. at your earliest convenience. Please contact me at 651- 322 -2724 if you have any questions or comments regarding the attached information. Thank you. Sincerely, WSB Associates, Inc. Mor Proje ag Enclosures cc: Cindy Domiden, City of Rosemount Mike McNamara, McNamara Contracting, Inc. tsf Project Summary 1 Original Contract Amount $802,503.23 2 Contract Changes Addition $14,543.74 3 Contract Changes Deduction $0.00 4 Revised Contract Amount $817,046.97 5 Value Completed to Date $762,283.05 6 Material on Hand $0.00 7 Amount Eamed $762,283.05 8 Less Retainage $0.00 9 Subtotal $762,283.05 10 Less Amount Paid Previously $745,957.55 11 Liquidated Damages 0.00 12 AMOUNT DUE THIS PAY VOUCHER NO. 8 FINAL $16,325.50 Recommended for Approval by: B Associates Inc. Approv McNa Specified Contract Completion Date: 11/1/2008 Comment: wsB Associates, Inc, Owner: City of Rosemount 2875 145th Street West Rosemount, MN 55068 -4941 For Period: 5/29/2009 to 6/23/2009 Contractor: McNamara Contracting, Inc. 16700 Chippendale Avenue Rosemount, MN 55068 Pay Voucher RSMT 2008 Street Improvements Project Client Contract No.: Project No.: 01668 -31 Client Project No.: 418 I HEREBY CERTIFY THAT A FINAL EXAMINATION HAS BEEN MADE OF THE ABOVE NOTED CONTRACT, THAT THE CONTRACT HAS BEEN COMPLETED, THAT THE ENTIRE AMOUNT OF WORK SHOWN IN THE FINAL VOUCHER HAS BEEN PERFORMED AND THE TOTAL VALUE OF THE WORK PERFORMED IN ACCORDANCE WITH, AND PURSUANT TO, THE TERMS OF THE CONTRACT IS AS SHOWN IN THIS FINAL VOUCHER. Request No.: 8 FINAL Construction Observer: Approved by Owner: City Ro :a' ount Date: Date: 6/23/2009 1 of 4 2008 Street Improvements ROSEMOUNT •ii_ l 1 54TH 153RD ST W 155TH ST CORNELL TRL W 156TH ST W E-- CO- ►ELL VALL Y Rr1ELL TRL OCU C N OAK G� z o POND pP CO LL 4 CT GP aO`\*\P- 00 0 158TH ST W O �Ft n w STW 153RD ST W _7 CHILI CT 151ST 0< CINNA CASCADE t JV (CSAH 46) w Q 0 0 260 520 1,040 1,560 2,080 Feet T: /GIS/City /Maps /Departmental Maps/Engineering/Chris/2008 Recon Locate WE 7 December 2007