HomeMy WebLinkAbout6.f. Payment #6 and Final - Downtown Regional Pond, City Project #420 ROSEN4OLII EXECUTIVE SUMMARY
CITY COUNCIL
City Council Meeting: November 17, 2009
AGENDA ITEM: Payment #6 and Final Downtown AGENDA SECTION:
Regional Pond, City Project #420 Consent
PREPARED BY: Andrew J. Brotzler, PE, Director of Pub i AGENDA NO. tef
Works /City Engineer
ATTACHMENTS: Letter; Final Pay Voucher; Map APPROVED BY:
RECOMMENDED ACTION: Motion to Approve Payment 6 and Final for the Downtown
Regional Pond, City Project #420, to Stocker Excavating and Accepting it for Perpetual
Maintenance
BACKGROUND:
This item is on the agenda to request Payment #6 and Final to Stocker Excavating for the Downtown
Regional Pond, City Project #420.
The Downtown Regional Pond project included the construction of a stormwater treatment pond and
restoration work at Erickson Pond located within Central Park. This pond, which is also a preserved
wetland, is the primary receiving water body for the stormwater system from the downtown area.
Downtown redevelopment triggered the need for improvements at Erickson Pond to meet current
regulations. The primary regulation to be met was the treatment of surface water run -off prior to
discharging to a wetland.
The final construction amount of $402,216.76 is 13% above the revised contract amount of $356,095.44.
Items that contributed to the increased construction cost are discussed detailed in the attached letter to the
City Engineer.
SUMMARY:
Staff recommends that Council approve Payment #6 and final for the project, and accept the project for
perpetual maintenance subject to the following conditions.
1. Satisfactorily showing that the contractor has complied with the provisions of Minnesota Statutes
290.92 requiring withholding state income tax.
2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the
contract have been fully paid or satisfactorily secured.
3. Consent of Surety to Final Payment certification from the contractor's surety.
4. Two -year maintenance bond.
G: \ENGPROJ \420 \111709 CC Payment6- Final.doc
WSB
Associates, Inc Infrastructure Engineering is Planning Construction 701 Xenia Avenue South
Suite 300
Minneapolis, MN 55416
Tel: 763 -541 -4800
Fax: 763 541 -1700
November 11, 2009
Mr. Andy Brotzler, PE
City Engineer
City of Rosemount
2875 145 Street West
Rosemount, MN 55068
Re: Summary of Quantities
Erickson Pond Water Quality Improvement
and Habitat Enhancement Project
City of Rosemount Project No. 420
WSB Project No. 1668 -37
Dear Mr. Brotzler:
Please find enclosed the final Construction Pay Voucher No. 6 in the amount of $20,110.84 for
the above referenced project. This voucher represents payment for the 5% retainage. All punch
list items have been completed.
The final contract amount is $402,216.76. This compares to the original contract amount of
$356,095.44. The increased amount reflects additional work in three main areas:
Item 18: Modular Block Retaining Wall during the construction of the retaining walls,
it was observed that additional wall height should be adjusted in selected areas to better
match the surrounding ground elevations. Based on the field modifications, the wall
quantity was increased by 775 square feet. This amounted to additional costs of
$15,577.50.
Item 35: Random Riprap, Class III once the grading was completed at the 72 -inch RCP
outfall in the south end of the pond, it was requested that the in -place riprap be
supplemented with additional riprap. This riprap was grouted to provide added
protection from erosion. The additional cost for this work was $34,171.61.
Item 45: Clean Root Cutting during clearing and grubbing work for the project, it was
determined to save significant trees rather than full clear cutting for the trail and retaining
wall installation. In order to reduce the impact to trees from the original plan, additional
root cutting was necessary. This amounted to additional costs of $12,985.00.
These additional costs are partially offset by other contract items coming in with a final quantity
less than estimated quantity. As you may know, the contract amount is based on estimated
quantities that are subject to change based on changes in conditions in the field.
Minneapolis St. Cloud
Equal Opportunity Employer
K: 01668- 37 Admi Construction Admin\Pay Vouchers \LTR FINAL VO6 CTY-a brotzla -091109 .docx
Mr. Andy Brotzler
November 11, 2009
Page 2
During the development of the preliminary estimates for the project, the original estimated cost
was $580,000 of which $500,000 of grant funding has been awarded. While the final contract
amount is higher than the original contract amount award, the final contract cost is within the
previously identified project funding.
We hereby recommend that the City of Rosemount approve Construction Pay Voucher No. 6 for
Stocker Excavating, Inc. pending submittal of the original Consent of Surety to Final Payment
and the two -year maintenance bond.
If you have any questions or comments regarding the enclosed, please contact me at
763- 287 -7164. Pete Willenbring will be at the November 17, 2009 City Council meeting to
answer any questions the Council may have regarding these items.
Thank you.
Sincerely,
WSB Associates, Inc.
Steven G. Gurney, PE
Project Manager
Enclosures
cc: Cindy Dorniden, City of Rosemount
Troy Stocker, Stocker Excavating, Inc.
tsf
K:\01668- 37\Admin \Construction Admin\Pay Vouchers \LTR FINAL VO 6 CTY-a brotxler-091109 .docx
WSB
Associates, Infrastructure 1 Engineering 1 Planning 1 Construction 701 Xenia Avenue South
Suite 300
November 9, 2009 Minneapolis, MN 55416
Tel:763- 541 -4800
Fax: 763 -541 -1700
Honorable Mayor and City Council
City of Rosemount
2875 145th Street W.
Rosemount, MN 55068
ATTN: Cindy Domiden
Re: Construction Pay Voucher No. 6 (Final)
Erickson Pond Water Quality Improvement
and Habitat Enhancement Project
City of Rosemount Project No. 420
WSB Project No. 1668 -37
Dear Mayor and Council Members:
Please find enclosed the final Construction Pay Voucher No. 6 (Final) for the above- referenced
project in the amount of $20,110.84. We recommend final payment subject to receipt of the
following items:
1. Satisfactory showing that the contractor has complied with the provisions of Minnesota
Statutes 290.92 requiring withholding state income tax.
2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the
contract have been fully paid or satisfactorily secured.
3. Consent of Surety to Final Payment certification from the contractor's surety.
4.. Two -year maintenance bond.
Please make payment in this amount to Stocker Excavating, Inc. at your earliest convenience.
Sincerely,
WSB Associates, Inc.
G
Steven G. Gurney, PE
Project Manager
Enclosures
cc: i�+t,4City of Rosemount
Troy Stocker, Stocker Excavating, Inc. tsf
Minneapolis 1 St Cloud
Equal Opportunity Employer K.101668-371Admin1Cawrwrion Admin1Pay VouchmILTR V06f.d CTr10276Ddoe
Owner: City of Rosemount Date: 10/27/2009
2875 145th Street West
(,41_, S Rosemount, MN 55068 -4941
For Period: 10/1/2009 to 10/27/2009 Request No.: 6 FINAL
Contractor: Stocker Excavating, Inc.
12336 Boone Avenue
Associates, Inc. Savage, MN 55378
Pay Voucher
RSMT Downtown Regional Ponding Improvements
Client Contract No.: 420
Project No.: 01668 -37
Client Project No.: 420
Project Summary
1 Original Contract Amount $356,095.44
2 Contract Changes Addition $0.00
3 Contract Changes Deduction $0.00
4 Revised Contract Amount $356,095.44
5 Value Completed to Date $402,216.76
6 Material on Hand $0.00
7 Amount Earned $402,216.76
8 Less Retainage $0.00
9 Subtotal $402,216.76
10 Less Amount Paid Previously $382,105.92
11 Liquidated Damages $0.00
12 AMOUNT DUE THIS PAY VOUCHER NO. 6 FINAL $20,110.84
I HEREBY CERTIFY THAT A FINAL EXAMINATION HAS BEEN MADE OF THE ABOVE NOTED CONTRACT, THAT THE
CONTRACT HAS BEEN COMPLETED, THAT THE ENTIRE AMOUNT OF WORK SHOWN IN THE FINAL VOUCHER HAS
BEEN PERFORMED AND THE TOTAL VALUE OF THE WORK PERFORMED IN ACCORDANCE WITH, AND PURSUANT TO,
THE TERMS OF THE CONTRACT IS AS SHOWN IN THIS FINAL VOUCHER.
Recommended for Approval by: Construction Observer:
WSB Associates, Inc.
Approved by Contractor: Approved by Owner:
Stocker Excavating, Inc. City of Rosemount
Specified Contract Completion Date: Date:
11/28/2008
Comment:
1 of 4
R ROSEMOU
Downtown Regional Pond
PUBLIC WORKS DEPARTMENT
%o 00\`',"„,„, °a o f Brway
jI 1 •f Park
MM E Q� CONNEMARA Lte
C tl 137TH ST Q Q Q J V
0
0 2 U
138TH STW
VAN
Schwarz Pond PI 1 38TH ST WI wP r---------
0 S T
CO SCHWARZ r 1 39TH STW Q
Q W W W
POND m z a a a
z w
A t hwarz Pond Park 00 z a g BARN
0 140TH STW G h Cr EY BELM
`r�� 1- W
rolls m i W
)ods 142ND ST c i- m Z B L.FA
ark 0 Erickson 1
Park r'
J� v
47 X rci
143R STW r Q 14 RD ST V I a Q O
UPPER 143RD
Z Central
I 45TH BEECH
ST ti harlie•s Park t a R /45TH ST W
gir W W
R 146TH ST W Q li P r
a
V 146T1- T Q
r
L. 147TH W o
H STW L. R LOWER 147TH STW t iks 4 I
e BI SC
a 147TH STW a w 6�- .MF�E�
s
Q Q BOYSENBERRY C 0- 0.
z Z�� z
H ST W U. 147TH ST W —J Q o f i i i
0 BOSTON BOISE
148TH ST W w 27 IR CIR
x W 4 Q Q a In
H ST
a) l- w v 148TH ST p
tii a z N
i ST l a U. 1 STW c I w BR
?1 CT
49TH m
H ST LI L. 150TH STW y
N
W +E
0 430 860 1,720 2,580 3,440 S
i Feet
T: /GIS/City /Maps /Departmental Maps/Engineering /Chris/Downtown Pond Locate September 2008