Loading...
HomeMy WebLinkAbout2.b. Special Assessment Overview - 2009 Street Improvements Project, City Project #426AGENDA ITEM: Special Assessment Overview 2009 Street Improvements Project, City Project #426 AGENDA SECTION: PREPARED BY: Morgan Dawley, PE, Project Manager AGENDA NO. 2.0. ATTACHMENTS: Funding Project Costs; Location Map APPROVED BY: nil) RECOMMENDED ACTION: Discussion !C ROSEMOUNT City Council Special Work Session: January 14, 2009 BACKGROUND: SUMMARY: CITY COUNCIL Staff will provide a brief overview of the proposed assessments at the meeting. EXECUTIVE SUMMARY At the December 16, 2008 Regular City Council meeting, the project costs for the 2009 Street Improvements Project, City Project #426 were declared and a public hearing set for January 20, 2009. Prior to the public hearing for the proposed special assessments, Staff would like to review the proposed assessments and assessment methodology with Council. Attached for Council information is a summary of the project costs and proposed assessment rates for the project. G: \ENGPROJ\ 426\ AssessmentPIesentationCSW1- 20- 09.doc Prepared By: PCO Date: 1/8/2009 2009 Street Improvement Project: Estimated Project Cost Estimated Construction Cost Estimated LEAF Estimated Total Surface Improvements 790,800.00 237,300.00 1,028,100.00 Sanitary Sewer Improvements 219,800.00 65,900.00 285,700.00 Watermain Improvements 324,600.00 216,200.00 97,400.00 64,900.00 422,000.00 281,100.00 Storm Sewer Improvements Total 1,551,400.00 465,500.00 2,016,900.00 2009 Pavement Management Program: Estimated Project Cost Seal Coat Improvements 175,700.00 52,200.00 8,800.00 2,600.00 184,500.00 54,800.00 Shannon Parkway Improvements Totals 227,900.00 11,400.00 239,300.00 Proposed Funding 2009 Street Improvement Project 2009 Pavement Management Program Total Street CIP Fund 583,600.00 239,300.00 822,900.00 Special Assessments 420,000.00 420,000.00 Sanitary Sewer Utility Fund 285,700.00 285,700.00 Water Utility Fund 422,000.00 422,000.00 Storm Utility Fund 191,100.00 191,100.00 Storm Core Fund 114,500.00 114,500.00 Total 2,016,900.00 239,300.00 2,256,200.00 2009 Street Improvements Project a z 0 2 U Q z 0 2 U. 148TH ST W J. 156TH 144TH ST W U 145TH ST W DAVENPORT C W D AVENPORT PATH 143RD ST W 155TH ST W DARLING PATH 156TH ST W J U 145TH ST W 153RD ST 154TH CT CROCUS WA e B CR CENT CIR 1 54TH U. 148TH ST VV T' ST W J 149TH ST 148TH ST W UPPER 143RD U. 149TH U. 147TH ST W 148TH ST W WACHTER LAKE R \T6, 149TH a a pptN ZN 0 480 960 1,920 CO LL N _V n T: /GIS /City /Maps /Departmental Maps /Engineering/Chris /2009 Recon Locate 4 2,880 3,840 Feet w z 0 fx Ir 143R WE 142ND ST W N September 2008