HomeMy WebLinkAbout6.i. Change Order #1, Akron Avenue Trunk Utility & Railroad Improvements, City Project #417AGENDA ITEM: Change Order #1 Akron Avenue Trunk Utility Railroad Improvements, City Project #417 AGENDA SECTION: Consent PREPARED BY: Andrew J. Brotzler, PE, City Engineer AGENDA NO. 0.1. ATTACHMENTS: Change Order #1; Map APPROVED BY: !/1-1 RECOMMENDED ACTION: Motion to Approve Change Order #1 for the Akron Avenue Trunk Utility Railroad Improvements, City Project #417. 4 ROSEMOUNT City Council Meeting: February 17, 2009 BACKGROUND: Attached for Council consideration is Change Order #1 for the Akron Avenue Trunk Utility Railroad Improvements, City Project #417. This change order represents additional costs incurred as a result of the following work: Connecting to 24" MCES sewer stub not located where shown on plans. These changes result in a net increase of $22,448.37 for a revised contract amount of $3,124,630.03 Item to be funded 100% by MCES as per cost participation agreement on Schedule D of the contract. SUMMARY: CITY COUNCIL EXECUTIVE SUMMARY Staff recommends Council approval of Change Order No. 1 for the Akron Avenue Trunk Utility Railroad Improvements, City Project #417. G: \ENGPROJ \417\ ChangeOrder1CCO2- 17- 09.doc WSB Assoc- Infrastructure Engineering Planning Construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763 541 -4800 February 5, 2009 Mr. Andy Brotzler, PE City Engineer City of Rosemount 2875 145 Street West Rosemount, MN 55068 Re: Change Order No. 1 Akron Avenue Trunk Utility and Railroad Improvements City of Rosemount Project No. 417 WSB Project No. 1668 -30 Dear Mr. Brotzler: Please find enclosed Change Order No. 1 (four copies) for the above referenced project. The change order reflects a net increase to the contract amount of $22,448.37 for a revised contract total of $3,124,630.03. This contract amount increase is 100% funded by MCES. If the attached meets with your approval, please sign and process. If you have any questions or comments regarding the enclosed, please contact me at 651 -322- 2724. Thank you. Sincerely, WSB Associates, Inc. Morg Projec k A I ger Enclosures cc: Cindy Dorniden, City of Rosemount Joseph LaTour, LaTour Construction, Inc. tsf ACEC 2008 Firm of the Year Minneapolis St. Cloud Equal Opportunity Employer AKRON AVENUE TRUNK UTILITY AND RAILROAD IMPROVEMENTS CITY ROSEMOUNT PROJECT NO. 417 WSB PROJECT NO. 1668 -30 OWNER: CITY OF ROSEMOUNT 2875 145TH STREET WEST ROSEMOUNT, MN 55068 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: ADDITIONAL WORK, AS SHOWN ON THE ATTACHED DETAIL, AS A RESULT OF MCES 24" SEWER STUB NOT LOCATED AS SHOWN ON PLANS. IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE. CHANGE IN CONTRACT PRICE: ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: N/A CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: NET INCREASE OF THIS CHANGE ORDER: CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: RECOMMENDED BY: APPROVED BY: MORGAN DAWLEY, PE, PROJECT MANAGER WSB ASSOCIATES, INC. ENGINEER CITY ENGINEER DATE OF COUNCIL ACTION I GE ORDER NC $3,102,181.66 $0.00 $3,102,181.66 $22,448.37 $3,124,630.03 CONTRACTOR: LATOUR CONSTRUCTION, INC. 2134 CO. RD. 8 NW MAPLE LAKE, MN 55358 CHANGE IN CONTRACT TIME: ORIGINAL CONTRACT TIME: NET CHANGE FROM PREVIOUS CHANGE ORDERS: CONTRACT TIME PRIOR TO THIS CHANGE ORDER: NET INCREASE WITH CHANGE ORDER: CONTRACT TIME WITH APPROVED CHANGE ORDERS APPROVED BY: CONTRACTOR SIGNATURE LATOUR CONSTRUCTION, INC. CONTRACTOR CITY ADMINISTRATOR G: IENGPRO.M1T166d -30 Change Order IC0-1 1/9/2009 9/1/2009 NONE 9/1/2009 0 DAYS 9/1/2009 AKRON AVENUE TRUNK UTILITY AND RAILROAD IMPROVEMENTS CITY ROSEMOUNT PROJECT NO. 417 WSB PROJECT NO. 1668 -30 ADDED ITEMS Item No. Mat. No. Description 172 2503.601 CONNECT TO EXISTING SANITARY SEWER 1 1 LUMP SUM $22,448.37 $22,448.37 TOTAL ADDED ITEMS CHANGE ORDER NO. 1 DELETED ITEMS Item No. Mat. No. Description Qty Unit Price Extended Amount TOTAL DELETED ITEMS CHANGE ORDER NO. 1 TOTAL ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT G:%ENGPRO.M17N668 -30 Change Order ICO1 Detail 1/9/2009 Note Qty Unit Price Extended Amount $22,448.37 $0.00 $22,448.37 1. COMPENSATION IN FULL FOR PRIME CONTRACTOR ADDITIONAL WORK INVOLVED IN CONNECTING TO 24" MCES SEWER STUB NOTES: NOT LOCATED WHERE SHOWN ON PLANS. ITEM TO BE FUNDED 100% BY MCES AS PER COST PARTICIPATION AGREEMENT ON SCHEDULE D. SEE ATTACHED DOCUMENTATION. Akron Avenue Trunk Utility and Railroad Im rovements ROSEMOUNT P ;L OR. IEP RT NT 145TH ST W (CSAH T /GIS/City/Maps/Departmental Maps /EnglneeringlChris/CR73 Utibty Locate.mxd