HomeMy WebLinkAbout6.j. Consider Quotes for Paving Schwartz Pond Park Parking Lot ROSEI \4OUI\T 1T EXECUTIVE SUMMARY
CITY COUNCIL
City Council Meeting: July 15, 2008
AGENDA ITEM: Consider Quotes for Paving Schwarz AGENDA SECTION:
Pond Park Parking Lot Consent
PREPARED BY: Rick Cook, Operations Superintenden AGENDA NO. 1O
Andrew J. Brotzler, PE, City Engineer •J
ATTACHMENTS: Quotes APPROVED BY:
RECOMMENDED ACTION: Motion to Accept Quote and Authorize Work to Commence for
Schwarz Pond Park Parking Lot Paving
ISSUE:
Consider contracting improvements for Schwarz Pond Park parking lot.
BACKGROUND:
The 2008 budget includes funding for the re- paving of Schwarz Pond Park parking lot in the amount of
$52,500 (line item 101 45202 -01- 530.04). In addition to this, funding is included under line item 101-
43121-01- 415.00 for the rental of a paving machine to complete the work with city crews. Based on the
increases in bituminous prices for city purchase of materials, the total estimated hard cost for materials and
equipment rental (paving machine) to complete the work with city crews is approximately $58,000. This
cost does not include City labor, equipment and fuel.
Based on discussions with paving contractors this year, it became apparent that the city may be able to
contract the completion of the work at a comparable cost. One of the reasons for this is the value of
removed bituminous to contractors for recycling which the city will not realize if the work is completed by
city crews to remove and dispose of the existing bituminous. Prior to proceeding with the work by city
crews, the attached quotations were obtained. A summary of the quotes is as follows:
Pine Bend Paving, Inc. $60,000.00
McNamara Contracting, Inc. $69,311.50
Northwest Asphalt, Inc. $81,075.00
Upon review of the above quotes and considering the savings in city soft costs for labor (estimated at 260
hours), equipment and fuel, the low quote amount of $60,000.00 is reasonable.
SUMMARY:
Staff is requesting Council consideration to authorize the contracted completion of the work by Pine Bend
Paving, Inc. in the amount of $60,000.00.
G: \Budget 2008 \Schwarz estimate CC7- 15- 08.doc
9..: t. 7 7. 7. S e
06/26/2008 11:55 6514377960 PINE BEND PAVING PAGE 01/02
r J1 I {N N„ r v 1
11
w
pu n Bold Ra� Vi_ 5
me.
651-437-2333 R s hl 55076 P. x r Proleg.
1 651 437 -2333 •FAX 651 -437.7 6O w rmflklon, MN
PROPOSAL
LATE OF PROPOSAL PROPOSED COMPLEDON DATE o I
r 0
CDP
La t j V JOB NAME I
JOS LOCATION
,o6
WE ARE PLEASED TO OFFER YOU MATERIALS AND SERVICES AS ONLY AT OUR BELOW, ON. YOUR H A
E INDICATED EPTANCE WR BE ACC
IS NOT 8Y
ACCEPTED WITHIN THIRTY DAYS, IT THEN MAY BE AOCE P
COMPLETING AND RETURNING TO US THE ORIGINAL OF THIS FOAM.
PRICE 1 AMOUNT
110
ITEM, DESCRIPTION OR SPECIFICATION
P NBC kiL._',
I f 4 0 M a s 4 gailkElliM
III
r U y 1 tirAlM A
1
0 O 00
ro II i r I y l milinim fl
NJ PRICE QUOTATION MATERIAL LUMP UM TOTAL AMOUNT Cyr O r
ID UNIT PRICES 0 SOUAtE YARD w
T THE TOTAL
DAY PERIOD SHALL BEAR INTEREST CIiARGES OF 8 PER ANNUM T UNTIL PAYMENT IS MADE N FULL I3Y THE OWNER.AID AFTER
i
THE 3Q PROMPTNESS BY THE CONTRACTOR, BUT THE CONTRACTOR SHALL NOT BE
R 2. THIS PONS B E FOR DELAYS OR FAI IN C MP E ON
M RESPONSIBLE 0AUSED BY WEATHER, NFAVOR BLE TO CARRYING OUT QA NVOLV D,
S FIRE, EXPLOSION, FAILURE OF EQUIPMENT, STRIKES, DIFFERENCES WITH WORKMEN, COMPLIANCE WITH ORDERS OF A GOVERNME
AGENCY, INTERRUPTION IN DELIVERY OF MATERIALS, OR FROM ANY CAUSE BEYOND HIS REASONABLE CONTROL.
3. THE CONTRACT PRICE DOES NOT INCLUDE ANY TAXES EXCEPT AS STATED, AND ANY TAX IMPOSED BY GOVERNMENTAL AUTHORITY
G WHICH AFFECTS THE CONTRACT PRICE SHALL BE IN ADDITION THERETO.
O 4. THIS CONTRACT CONTAINS THE ENTIRE AGREEMENT BETWEEN THE PARTIES, THERE ARE NO ORAL PROMISES, AGREEMENTS OR
N WARRANTIES AFFECTING IT ANY ALTERATION OR DEVIATION FROM THE. ABOVE QUANTITIES AND SPECIFICATIONS OR OTHER CHANGE IN
D THE CONTRACT MUST BE IN WRITING AND EXECUTED BY AUTHORIZED REPRESENTATIVES OF THE PARTIES,
k 5. ANY PERSON OR COMPANY SUPPLYING LABOR OR MATERIALS FOR THIS IMPROVEMENT TO YOUR PROPERTY MAY FILE A LIEN AGAINST
T YOUR PROPERTY, IF THAT PERSON OR COMPANY IS NOT PAID FOR THE CONTRIBUTIONS. UNDER MINNESOTA LAW, YOU HAVE THE RIGHT
I TO PAY PERSONS WHO SUPPLIED LABOR OR MATERIALS FOR THIS IMPROVEMENT DIRECTLY AND DEDUCT THIS AMOUNT FROM OUR
N CONTRACT PRICE, OR WITHHOLD THE AMOUNTS DUE FROM US UNTIL 120 DAYS AFTER COMPLETION OF THE IMPROVEMENT UNLESS WE
S N GIVE YOU A LIEN WAIVER SIGNED Sy PERSONS WHO SUPPLIED ANY LABOR OR MATERIAL FOR THE IMPROVEMENT AND WHO GAVE YOU
TIMELY_ NOTICE,
P E REND PAVI INC. l, CCEPTED FOR OWNER
DAT>:,
BY o co W 1.. E
T ITLE 1 CL
ICP 5.05053
JUN-17-2008 08:50 P 02/02
16700 Chippendale Ave
Rosemount, MN 55068
C. Fax: 651.322-5550
Estimate it Agreement
Location:
Submitted to:
tyOtRo5emaunt Rosemooni 8117/2008
Engineer. Propped
..X.i.•••••••
Proje Date of Plan: Time Of Bid:
Item No. Description I Quantity Unit Price Extended Amt.
Skate Park Parking Addition-18'x75' For 0 Parking Stalls
Excavation And Class 5 By City Forces
2.5" MV3B Wearing Course 150 sy 15.00 2,250.00
Park Parking Lot-Remove And Replace
Remove Bit Pavement 4895 sy 1.60 7,832.00
Regrade And Install 3" Class 5 Recycle 4895 sy 2.25 11,013.75
3" MV3B Wearing Course 4895 sy 9.85 48,215.75
CI Forces To Do Restoration And Stri ing
Ouote Assumes PG 58.28 Asphalt cement TOTAL BID 69A11.50
Price Includes Tax and Wit supply8 and il Needed
No Traffic Control
Na Wster Condiions
T Quote is Per the AGC %Indeed Sub-Contract Ageernent for Highway/Heavy I ndusitial
Division (1956 Edition, Revised 1866. Revised 1980 and Sider 1986 Revision)
Comments:
The specifications, conditions, attachments, terms and contract are satisfactory, and 1/We
hereby authorize the performance of this work.
This Estimate and Agreement is void 30 days from date unless signed and retumed to bidder.
Dare
Maibmarer *zap,- c 0 0
TOTAL P.02
S. 11.5• 7•. •S
07/07/2008 15:07 9524451056 NORTHWEST ASPHALT IN PAGE 01/01
rep9%df
NORTHWEST ASPHALT. INC
ALT INC. r jc�;�tvt IRJiv 64 UiILr
ASH 1451 STAGECOACH ROAD SHAICOPEE, MN 55379 -2797
PHONE (952)445 -1003 FAX (952)445 -1056
1 WWW.I1wasphait.tlet
eimat p 8511322-2095
City of Apple Valley EAL 651/322-2049
Attn: Jim Kozlozski
,0 Name, Schwarz Pond Park
&Tata Dote of pions pato Bid Submitted
Ju 7,2008
DUE TO THE VOLATILITY IN THE OIL INDUSTRY,OUR ASPHALT MATERIAL SUPPLIER WILL ONLY EXTEND FOR CONTRACT CONSIDERATION THE MATERIAL
PRICES IN THIS PROPOSAL. FOR TIN DAYS FROM THE ABOVE DATE. AFTER TEN DAYS OUR PROPOSAL PRICE WILL BE SUBJECT TO ASPHALT
MATERIAL PRICE ADJUSTMENTS. THESE ELE=MENTS ARE OUTSIDE OF OUR CONTROL WE APOLOGIZE FOR ANY INCONVENIENCE. THIS MAY CREATE.
AREA FIGURED OM 150 SY 3 2112
4,635 SY 3 3
WORK TO BE DONE BRIEFLY AS FOLLOWS:
1 REMOVE EXISTING BITUMINOUS
2) FURNISH INSTAL A 3" CL -5 RECYCLED AGGREGATE BASE
3) CONSTRUCT A 2 112 3" MHD SPEC LV3WE8 ONE LIFT BITUMINOUS WEAR COURSE
4) PRICE $81,075.00
PLEASE NOTE:
1) THIS PROPOSAL MAY BE WITHDRAWN BY U8 IF NOT ACCEPTED WITHIN 'YEN DAYS
2) PRICE IS GOOD FOR 2008 CONSTRUCTION SEASON
3) NO T.C., LAYOUT, SIGNAGE, ADJUSTS OR TESTING
4) NO SUBGRADE PREP FOR NEW 75' X 18' AREA INCLUDED
MOBILIZATION FOR MILLING 1 ADDN MOB FOR MILLING $700.00 EACH
MOBILIZATION OF BITUMINOUS WEAR 1 ADDN MOB FOR BITUMINOUS WEAR $695.00 EACH
NQ3UBGRADE CORRECTIONS INCLUDED
utlm Led N ANDERSON PROJECT MANAGER
111111
.LS. Nod". Thispropose1 may be vanckinvn MusdmtecaapJeduai* TEI■ days.
,i',arjvta to ofPr9p9%aL•
The above prices, specifications and conditions are salisfoctaty and are hereby accepted. You are authorized to do the work as specified.
payment will be made as outlined above.
Dale ofAcoeptan e: Suture:
.w FqU 1. aPPaafuMITY iG/PLOYBP