Loading...
HomeMy WebLinkAbout6.t. Change Order #1 - 2008 Street Improvement Project, City Project #418AGENDA ITEM: Change Order #1 2008 Street Improvement Project, City Project #418 AGENDA SECTION: Consent PREPARED BY: Andrew J. Brotzler, PE, City Engineer AGENDA NO. 6."1 ATTACHMENTS: Change Order #1 APPROVED BY: V RECOMMENDED ACTION: Motion to Approve Change Order #1 for the 2008 Street Improvement Project, City Project #418. 4 ROSEMOUNT CITY COUNCIL Special City Council Meeting: August 4, 2008 EXECUTIVE SUMMARY BACKGROUND: Attached for Council consideration is Change Order #1 for the 2008 Street Improvement Project, City Project #418. This change order represents additional costs incurred as a result of the following work: 1. Replacing gate valve boxes that either broke or were unable to adjust and required additional materials to raise to the correct grade. 2. Replacing a catch basin and storm sewer pipe at the intersection of Chippendale and 156 Street that was severely deteriorated. 3. Installation of block retaining wall in areas where the sidewalk installation is to occur to potentially reduce the amount of property impacts. These changes result in a net increase of $14,543.74 for a revised contract amount of $817,046.97. SUMMARY: Staff recommends Council approval of Change Order No. 1 for the 2008 Street Improvement Project, City Project #418. G: \ENGPROJ \418 \ChangeOrderlCC8- 4- 08.doc WSB infr astructure 1 Engineering 1 Planning 1 Construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 July 30, 2008 Tel: 763- 541 -4800 Fax: 763- 541 -1700 X Associates, Inc. Mr. Andy Brotzler, PE City Engineer City of Rosemount 2875 145 Street West Rosemount, MN 55068 Re: Change Order No. 1 2008 Street Improvement Project City of Rosemount Project No. 418 WSB Project No. 1668 -31 Dear Mr. Brotzler: Please find enclosed Change Order No. 1 that results in a net increase in project cost of $14,543.74 for the above referenced project. Change Order No. 1 increases the contract amount from $802,503.23 to a new revised contract amount of $817,046.97. The major items of work included as part of Change Order No. 1 are as follows: ADDED ITEMS: Item 66: Salvage Gate Valve and Box Contract items only included adjustments of gate valves and once construction began it was realized that two of the gate valve boxes were not adjustable and needed partial replacement. Item 67: Concrete Storm Sewer At the intersection of Chippendale Avenue and 156 Street there was a catch basin that was severely deteriorated and required replacement along with approximately 6 feet of 12 -inch RCP pipe. Item 68: Block Retaining Wall As part of the sidewalk review it was determined that some of the property impacts associated with the sidewalk installation may be minimized with the addition of small retaining walls. The exact quantity is unknown at this time but has been estimated as part of the change order. Please review the attached change order and obtain necessary approvals and return back to nee for final processing. If you have any questions or comments regarding the enclosed, please contact me at 763 -231 -4844. Sincerely, WSB Associates, Inc. Anthony A. A rhold, PE Project Manager Enclosures cc: Cindy Dorniden, City of Rosemount Mike McNamara, McNamara Contracting, Inc. tsf ACEC 2008 Firm of the Year Minneapolis 1 St. Cloud Equal Opportunity Employer u+;.. n,,.f,,,, m� ::,,x „a -r:, V:Un.,.<co/ cr v.a ter „z 2008 STREET IMPROVEMENT PROJECT CITY ROSEMOUNT PROJECT NO. 418 WSB PROJECT 1668 -31 OWNER: CONTRACTOR: CITY OF ROSEMOUNT 2875 145TH STREET WEST ROSEMOUNT, MN 55068 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: ADDED ITEMS: ITEM 66: SALVAGE GATE VALVE AND BOX ADJUSTMENTS WERE NOT POSSIBLE AS SPECIFIED AND REPLACEMENT OF VALVE BOX SECTIONS WERE REQUIRED ITEM 67: CONCRETE STORM SEWER REPLACEMENT OF 12" RCP AND CATCH BASIN REQUIRED AT CHIPPENDALE AND 156TH INTERSECTION ITEM 68: BLOCK RETAINING WALL RETAINING WALL PROPOSED IN SPECIFIC AREAS TO MINIMIZE PROPERTY IMPACTS AS A RESULT OF SIDEWALK INSTALL DELETED ITEMS: IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE. CHANGE IN CONTRACT PRICE: ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: NET INCREASE OF THIS CHANGE ORDER: CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: RECOMMENDED BY: ANTHONY ADERHOI PE, PROJECT MANAGER APPROVED BY: WSB ASSOCIATES, INC. ENGINEER CITY ENGINEER DATE OF COUNCIL ACTION CHANGE ORDER NO. 1 $802,503.23 $0.00 5802,503.23 $14,543.74 $817,046.97 Page 1 MCNAMARA CONTRACTING, INC 16700 CHIPPENDALE AVE ROSEMOUNT, MN 55068 CHANGE IN CONTRACT TIME: ORIGINAL CONTRACT TIME: NET CHANGE FROM PREVIOUS CHANGE ORDERS: CONTRACT TIME PRIOR TO THIS CHANGE ORDER: NET INCREASE WITH CHANGE ORDER: CONTRACT TIME WITH APPROVED CHANGE ORDERS APPROVED BY: CONTRACTOR SIGNATURE MCNAMARA CONTRACTING, INC. CONTRACTOR CITY ADMINISTRATOR 1668 -31 Change Order 1 07/31/08 8/29/2008 0 8/29/2008 NONE 8/29/2008 2008 STREET IMPROVEMENT PROJECT CITY ROSEMOUNT PROJECT NO. 418 WSB PROJECT 1668 -31 ADDED ITEMS Item No. Mat. No. Description 66 2104.523 SALVAGE GATE VALVE AND BOX 1 EACH $558.74 $558.74 67 2503.601 CONCRETE STORM SEWER 1 LUMP SUM $5,285.00 $5,285.00 68 2540.618 BLOCK RETAINING WALL 300 SD FT $29.00 $8,700.00 TOTAL ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT CHANGE ORDER NO1 DETAIL 07/31/08 Note Qty Unit Price Extended Amount $14,543.74 K:V166841VIdmtnlConstructlon AdminlRebldtPay Voucherst1668.31 Change Order 1Detall