HomeMy WebLinkAbout6.v. Paynebt #12 & Final - Glendalough 7th Street and Utility Improvements, City Project #401AGENDA ITEM: Payment #12 Final Glendalough 7 Street and Utility Improvements, City Project #401 AGENDA SECTION: Consent PREPARED BY: Andrew J. Brotzler, PE, City Engineer AGENDA NO. 6.V• ATTACHMENTS: Payment Voucher, Map APPROVED BY: \i/ RECOMMENDED ACTION: Motion to Approve Payment #12 and Final for the Glendalough 7 Street and Utility Improvements, City Project #401, to A -1 Excavating, Inc., and Accepting it for Perpetual Maintenance. 4 ROSEMOUNT City Council Meeting: August 4, 2008 BACKGROUND: This item is on the agenda to request Payment #12 and Final in the amount of $44,457.48 to A -1 Excavating, Inc. for the Glendalough 7 Addition, City Project #401. This project included the construction of streets, utilities, sidewalks and trails within the Glendalough 7 Addition. The contract for this project also included, as a change order, the installation of utilities and construction of roadway improvements to Dodd Boulevard as part of the Rosemount Family Housing site, City Project #404. The final construction amount of $2,160,100.01 is 2.0% below the contract amount of $2,205,288.86. SUMMARY: CITY COUNCIL EXECUTIVE SUMMARY Staff recommends that Council approve Payment #12 and final for the project and accept the project for perpetual maintenance subject to the following conditions. 1. Satisfactorily showing that the contractor has complied with the provisions of Minnesota Statutes 290.92 requiring withholding state income tax. 2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the contract have been fully paid or satisfactorily secured. 3. Consent of Surety to Final Payment certification from the contractor's surety. 4. Two -year maintenance bond. G: \ENGPROJ \401 \Payment 12&FinalCC8-4-08.doc WSB Associates. Infrastructure Engineering Planning Construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763 541 -4800 Fax: 763 541 -1700 July 21, 2008 Honorable Mayor and City Council City of Rosemount 2875 145 Street West Rosemount, MN 55068 Attn: Cindy Dorniden, City of Rosemount Re: Construction Pay Voucher No. 12 (Final) Evermoor's Glendalough 7 Addition Street and Utility Construction City of Rosemount Project No. 401 WSB Project No. 1556 -63 Dear Mayor and Council Members: Please find enclosed the final Construction Pay Voucher No. 12 for the above referenced project in the amount of $44,457.48. We recommend final payment subject to receipt of the following items: 1. Satisfactory showing that the contractor has complied with the provisions of Minnesota Statutes 290.92 requiring withholding state income tax. 2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the contract have been fully paid or satisfactorily secured. 3. Consent of Surety to Final Payment certification from the contractor's surety. 4. Two -year Maintenance Bond (warranty start date to coincide with the date Council approves final payment). We recommend that you make final payment in the amount of $44,547.48 for A -1 Excavating, Inc. at your earliest convenience. Please contact me at 651- 322 -2724 if you have any questions or comments regarding the enclosed information. Thank you. Sincerely, WSB Associates, Inc. Mor_.an A Daw1', PE Assistant City Engineer Enclosures cc: Andy Brotzler, City of Rosemount Charlie Storing, A -1 Excavating, Inc. ACEC 2008 Firm of the Year Minneapolis St. Cloud Equal Opportunity Employer tsf Project Summary 1 Original Contract Amount 2 Contract Changes Addition H Changes Deduction Contract Revised Contract Amount 5 Value Completed to Date CO Hand Material on Amount Eamed 8 Less Retainage 9 Subtotal 10 Less Amount Paid Previously 11 Liquidated Damages 12 FINAL 12 AMOUNT DUE THIS PAY VOUCHER NO. ,,,.556 -63 Pay Voucher 12 W I HEREBY CERTIFY THAT A FINAL EXAMINATION HAS BEEN MADE OF THE ABOVE NOTED B EEN PE RFORME T HAS B AND THE TOTAL VALUE OF THE I WORK PERFORMED R IN ACCORDANCE WITH, AND U PURSUANT TO, BEEN PED AND THE THE TERMS OF THE CONTRACT IS AS SHOWN IN THIS FINAL VOUCHER. Recommended for Approval by: Construction Observer: WSB Associates, Inc. Appro A -1 E 05' o 8 Specified Contract Completion Date: 11/22/2006 Comment: d .y Cont •r: ti g, I Owner: City of Rosemount 2875 145th Street West Rosemount, MN 55068 -4941 For Period: 12/1/2007 to 7/15/2008 Contractor: A -1 Excavating, Inc. PO Box 90 Bloomer, WI 54724 Pay Voucher RSMT Glendalough 7th Addition Client Contract No.: Project No.: 01556 -63 Client Project No.: 401 Approved by Owner: City of Rosemount Date: Friday, July 25, 2008 Date: 7/21/2008 Request No.: 12 FINAL $386,245.76 $0.00 $1,819,043.10 $2,205,288.86 $2,160,100.01 $0.00 $2,160,100.01 $0.00 $2,160,100.01 $2,115,642.53 $0.00 $44,457.48 1 of 8 Glendalou h 7th Addition 4 ROSEMOUNT MINNESOTA CROLLY CT .ARE G S C 4.1 CRp`NF 0 4 t r► 0 4 OrtNCI mow 0 like' HTpWN -o 0 255 510 0 r 1,020 1 0 3 SCH t RZ 137TH ST z a g VQ' 0 c 0 1,530 CHARLSTON WAY 2,040 131ST ST W 142ND ST W Feet 132ND CT 132ND L. z 140TH ST W BRONZE CT B RON ZE PKv4Y CONNEMARA 138TH ST W 138TH ST W U. 138TH ST 10 139TH ST W 1 November 2006 FILE: /snap2/ sharel /GIS /City/Maps/Departmental Maps /Engineering /Chris/Glendalough 7th Locate.mxd