Loading...
HomeMy WebLinkAbout6.t. Payment #4 & Final - Brazil Avenue Trail Improvements, ENG 134AGENDA ITEM: Payment #4 Final Brazil Avenue Trail Improvements, ENG 134 AGENDA SECTION: Consent PREPARED BY: Andrew J. Brotzler, PE, City Enginee AGENDA NO. ATTACHMENTS: Payment #4 Final APPROVED BY: Doi RECOMMENDED ACTION: Motion to Approve Payment #4 and Final to Sunram Construction for Brazil Avenue Trail Improvements, ENG 134, and Accept for Perpetual Maintenance. 4 ROSEMOUNT CITY COUNCIL City Council Meeting: December 16, 2008 EXECUTIVE SUMMARY BACKGROUND: This item is on the agenda to request Payment #4 and Final to Sunram Construction for Brazil Avenue Trail Improvements, ENG 134. This project included the construction of a 10 -foot wide bituminous path that connects the existing Koch Trail to Brazil Avenue near the north end of Erickson Park. Another segment of the trail provides a connection from Upper 138 Street to the existing trail on the south side of Connemara Trail. Costs associated with this project were funded with a combination of funds from the 2007 MPCA SEP Grant, the MPCA Mercury settlement, and the City's Park Improvement Fund. The final construction amount of $95,513.96 is 4.4% below the contract amount of $99,869. SUMMARY: Staff recommends that Council approve Payment #4 and Final for the project and accept the project for perpetual maintenance subject to the following conditions. 1. Satisfactory showing that the contractor has complied with the provisions of Minnesota Statutes 290.92 requiring withholding state income tax. 2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the contract have been fully paid or satisfactorily secured. 3. Consent of Surety to Final Payment certification from the contractor's surety. 4. Two -year maintenance bond (warranty start date to coincide with the date Council approves final payment). G: \ENGPROJ \ENG 134 Brazil Avenue Trail \Payment #4&FinalCC12- 16- 08.doc WSB ssoci Infrastructure 1 Engineering 1 Planning 1 Construction 701 Xenia Avenue South Suite 300 December 9, 2008 Minneapolis, MN 55416 Tel: 763-541-4800 Honorable Mayor and City Council Fax: 763- 541 -1700 City of Rosemount 2875 145 Street West Rosemount, MN 55068 Attn: Cindy Dorniden, City of Rosemount Re: Construction Pay Voucher No. 4 (Final) Brazil Avenue Bituminous Trail Improvements City of Rosemount Project No. ENG 134 WSB Project No. 1556 -99 Dear Mayor and Council Members: Please find enclosed the final Construction Pay Voucher No. 4 for the above referenced project in the amount of $4,775.70 Also enclosed are the following documents required for processing final payment for the above referenced project: 1. Satisfactory showing that the contractor has complied with the provisions of Minnesota Statutes 290.92 requiring withholding state income tax. 2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the contract have been fully paid or satisfactorily secured. 3. Consent of Surety to Final Payment certification from the contractor's surety. 4. Two -year Maintenance Bond (warranty start date to coincide with the date Council approves final payment). We recommend that you make final payment in the amount of $4,775.70 for Sunram Construction, Inc. at your earliest convenience. Please contact me at 651- 322 -2724 if you have any questions or comments regarding the attached information. Thank you. Sincerely, WSB Associates, Inc. Morg Assis Enclosures tsf Engmeer cc: Andy Brotzler, City of Rosemount Ryan, Sunram, Sunram Construction, Inc. Minnea I 1 St lou� ¢adVocalSeM slTempouryInternet File s1OLK843ILTRVO4FNLC7 7- hmcc- 170408MAW' Equal Opportunity Employer Project Summary 1 Original Contract Amount $99,869.00 2 Contract Changes Addition $0.00 3 Contract Changes Deduction $0.00 4 Revised Contract Amount $99,869.00 5 Value Completed to Date $95,513.96 6 Material on Hand $0.00 7 Amount Earned $95,513.96 8 Less Retainage $0.00 9 Subtotal $95,513.96 10 Less Amount Paid Previously $90,738.26 11 Liquidated Damages $0.00 12 AMOUNT DUE THIS PAY VOUCHER NO. 4 FINAL $4,775.70 01556 -99 Pay Voucher 4 WSB Associates, Inc. I HEREBY CERTIFY THAT A FINAL EXAMINATION HAS BEEN MADE OF THE ABOVE NOTED CONTRACT, THAT THE CONTRACT HAS BEEN COMPLETED, THAT THE ENTIRE AMOUNT OF WORK SHOWN IN THE FINAL VOUCHER HAS BEEN PERFORMED AND THE TOTAL VALUE OF THE WORK PERFORMED IN ACCORDANCE WITH, AND PURSUANT TO, THE TERMS OF THE CONTRACT IS AS SHOWN IN THIS FINAL VOUCHER. Recommended for Approval by: WSB Associates, Inc. Approved by Contractor: Specified Contract Completion Date: Date: Comment: Owner: City of Rosemount 2875 145th Street West Rosemount, MN 55068 -4941 For Period: 9/27/2008 to 12/4/2008 Contractor: Sunram Construction 20010 75th Avenue North Corcoran, MN 55340 Pay Voucher RSMT Brazil Avenue Trail Extension Client Contract No.: Project No.: 01556 -99 Client Project No.: ENG 134 Construction Observer: Approved by Owner: Sunram Construction City of Rosemount Thursday, December 04, 2008 Date: 12/4/2008 Request No.: 4 FINAL 1 of 3