HomeMy WebLinkAbout6.o. Receive Feasibility Report/Set Public Hearing/Declare Costs/Set Assessment Hearing-2009 Street Improvements Project, City Project #426AGENDA ITEM: Receive Feasibility Report/Set Public
Hearing /Declare Costs /Set Assessment
Hearing -2009 Street Improvements
Project, City Project #426
AGENDA SECTION:
Consent
PREPARED BY: Andrew J. Brotzler, PE, City Engineer
AGENDA NO. O.
O.
ATTACHMENTS: Resolutions; Map; Project Cost and
Funding Summary; Feasibility Report
APPROVED BY:
c. CU
RECOMMENDED ACTION: 1) Motion to Adopt a Resolution
Report and Setting a Public Hearing for the 2009 Street Improvements
#426.
And
2) Motion to Adopt a Resolution Declaring Costs to be Assessed
of Proposed Assessment and Calling for Hearing on the Proposed
2009 Street Improvements Project, City Project #426
Receiving the Feasibility
Project, City Project
and Ordering Preparation
Assessment for the
ROSEMOUNT
CITY COUNCIL
City Council Meeting: December 16, 2007
BACKGROUND:
On September 2, 2008 the Rosemount City Council authorized the preparation of a Feasibility Report for
the 2009 Street Improvements Project. This project has been designated as City Project #426. A full
presentation of the Feasibility Report and the proposed improvements contained within will be made at
the Public Hearing.
A brief review of the proposed 2009 improvements is as follows:
1. LOCATION
EXECUTIVE SUMMARY
The 2009 Street Improvement Program Project includes surface improvements to approximately 3,370
feet (0.64 miles) of 28 -foot wide urban streets including the following.
Damask Avenue West (between Dodd Boulevard and Upper 150 Street West)
Upper 150 Street West (from Dallara Avenue to the west end)
Dallara Avenue West (from Dodd Boulevard to Upper 150 Street West)
Damask Court (30 feet wide)
The attached location map illustrates the proposed project area.
2. PROPOSED IMPROVEMENTS
Initially addressed in the 2007 -2010 Street Improvement Program Feasibility Report, City Project 410,
(received by Council February 6, 2007) the proposed surface improvements to the above streets and
parking lot include full-depth roadway reconstruction including bituminous pavement, curb and gutter
removal and replacement, concrete driveway aprons, and roadway subgrade corrections.
G: \ENGPROJ\ 426\ ReceiveFR- Set PH- DeclareCostAssessmentCC12- 16- 08.doc
Proposed utility improvements include both replacement of watermain and sanitary sewer. Additionally,
lateral water and sewer utility services would be replaced to the right -of -way for each property. The streets
included in the project currently do not contain storm sewer, the lack of which has contributed to the
advanced state of deterioration of the roadway surface as well as localized minor flooding and erosion
problems, and therefore the inclusion of lateral storm sewer is proposed throughout the project. Trunk
storm sewer improvements are also included, providing a proposed outlet for the landlocked Twin
Puddles pond to provide flood protection to surrounding properties. The Twin Puddles pond outlet is an
identified capital improvement in the Comprehensive Surface Water Management Plan. Raingardens, to
be privately maintained by residents, may be included in the project as alternative stormwater treatment
measures if site conditions and public interest warrant. One such raingarden was included in the 2008
Street Improvement Project on Biscayne Way.
Proposed park improvements to Twin Puddles Park were considered but have been found to be financially
unfeasible at this time and are not recommended to be considered with this project.
The final section of the report, the Pavement Management Program Maintenance Projects, contains
identification of road segments comprised of approximately 1,060,000 square feet of roadway surface to be
scheduled for seal coating in 2009 as apart of the Pavement Management Program's goal of extending the
life of roadways through seal coating and crack sealing as a part of regularly scheduled maintenance. A
seal coat of Shannon Parkway from 145 Street West to Connemara Trail is also detailed, which would
allow for the restriping of that road segment to a 3 -lane section as previously discussed by City Council.
3. ESTIMATED COSTS AND FUNDING
The total estimated project cost for the 2009 Street Improvement Project is $2,268,400. The project is
proposed to be funded as follows:
Street CIP Fund $583,600
Special Assessments $420,000
Sanitary Sewer Utility Fund $285,700
Water Utility Fund $422,000
Storm Utility Fund $191,100
Storm Core Fund $114.500
$2,016,900
The total estimated project cost for the 2009 Pavement Management Maintenance Project is $184,500 and
is proposed to be funded by the Street Capital Improvement Fund (CIP). The total estimated project cost
for the Shannon Parkway seal coat and restriping is $54,800 and is also proposed to be funded by the
Street CIP. The combined estimated project costs proposed to be funded by the Street CIP for the 2009
Street Improvement Project, the Pavement Management Program Management Program Maintenance
Projects, and Shannon Parkway improvements is $822,900. The attached tables also outline estimated
project costs and funding.
4. PROJECT HEARING SCHEDULE
It should be noted that this item includes two resolutions. The first resolution for Council consideration is
for the receipt of the Feasibility Report and scheduling a public hearing for the project. The second
resolution declares the project costs and orders the preparation of the assessment roll and scheduling the
assessment hearing concurrently with the public hearing.
2
As the prepared assessments are set based on the fee resolution and are independent of the final project
cost, it is proposed to assess the project at the January 20, 2009 regular City Council meeting The
proposed assessment of the project at this time will allow for the focus of the hearing to be on the
assessment amounts and benefit and will allow for the identification of potential appeals prior to
proceeding with the project.
As before, the assessments will be certified with Dakota County in 2009 for payment with property taxes
in 2010. Similar to past reconstruction projects, the proposed assessments comprise 42% of the proposed
project funding for street improvements. For past reconstruction projects this percentage has ranged from
35 to 50 percent of the project funding.
SUMMARY:
Staff recommends Council adoption of a resolution receiving the feasibility report and setting the public
hearing for the 2009 Street Improvements Program Project, City Project #426 for January 20, 2009.
Additionally, Staff recommends as a second, separate action Council adoption of a resolution declaring the
costs to be assessed and setting a public assessment hearing for City Project #426 for January 20, 2009.
3
WHEREAS, the City Council deemed it necessary and expedient that the City of Rosemount, Minnesota,
construct certain improvements, to -wit: City Project #426, 2009 Street Improvements Project, in the City as
described in and in accordance with the feasibility report prepared by the City Engineer; and
WHEREAS, the City Council has been advised by the City Engineer that said utility and street improvements,
City Project #426 is feasible, and should best be made as proposed, and the City Engineer's report to this effect
has heretofore been received by Council, and filed with the City Clerk on December 16, 2008; and
WHEREAS, the statute provided that no such improvements shall be made until the Council has held a public
hearing on such improvements following mailed notice and two publications thereof in the official newspaper
stating time and place of the hearing, the general nature of the improvement, the estimated costs thereof, and
the area proposed to be assessed, in accordance with the law.
NOW THEREFORE BE IT RESOLVED, the City Council of the City of Rosemount accepts the feasibility
report for City Project #426 and places it on file.
NOW THEREFORE IT BE FURTHER RESOLVED, by the City Council of the City of Rosemount that
the public hearing be scheduled to consider City Project #426, 2009 Street Improvements Project, to be held on
Tuesday, January 20, 2009 at 7:30 o'clock p.m. or as soon thereafter as possible, in the Council Chambers of the
City Hall.
ADOPTED this 16th day of December, 2008.
ATTEST:
Amy Domeier, City Clerk
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2008-
A RESOLUTION RECEIVING THE FEASIBILITY REPORT AND
SETTING THE PUBLIC HEARING FOR THE
2009 STREET IMPROVEMENTS PROJECT
CITY PROJECT #426
William H. Droste, Mayor
Motion by: Seconded by:
Voted in favor:
Voted against:
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2008
A RESOLUTION DECLARING COST TO BE ASSESSED AND ORDERING
PREPARATION OF PROPOSED ASSESSMENT, AND CALLING
FOR HEARING ON THE PROPOSED ASSESSMENT
2009 STREET IMPROVEMENTS PROJECT
CITY PROJECT #420
WHEREAS, public improvements have been ordered for the 2009 Street Improvements Project and the
estimated construction cost for such improvement is $1,744,900.00, and the estimated expenses to be
incurred in the making of such improvements amount to $523,500.00, so that the total cost of the
improvement will be $2,268,400.
NOW, THEREFORE, BE IT RESOLVED by the City Council of Rosemount, Minnesota:
1. The portion of the cost of such improvement to be paid by the City is hereby declared to be
$1,848,400.00. The portion of the cost to be assessed against benefited property owners is declared
to be $420,000.00.
2. Assessments shall be payable in equal annual installments extending over a period of 10 years, the
first of the installments to be payable with general taxes for the year 2010, and shall bear interest at
the rate of 2% points per annum above the interest rate paid by the City for its bonds from date of
the adoption of the assessment resolution, or 2% over our financial consultant's estimated true
interest cost (TIC) for a 10 -year bond transaction for the City of Rosemount issued in April /May of
this year.
3. The City Clerk, with the assistance of the City Engineer shall forthwith calculate the proper amount
to be specially assessed for such improvement against every assessable lot, piece or parcel of land
within the district affected, without regard to cash valuation, as provided by law, and she shall file a
copy of such proposed assessment in her office for public inspection; and
BE IT FURTHER RESOLVED by the City Council of Rosemount, Minnesota:
1. A hearing shall be held on the 20th day of January, 2009 in the Council Chambers at 7:30 p.m. or as
soon thereafter as possible, to pass upon such proposed assessment and at such time and place all
persons owning property affected by such improvement will be given an opportunity to be heard
with reference to such assessment.
2. The City Clerk is hereby directed to cause a notice of the hearing on the proposed assessment to be
published once in the official newspaper at least two weeks prior to the hearing, and she shall state
in the notice the total cost of the improvement. She shall also cause mailed notice to be given to the
owner of each parcel described in the assessment roll not less than two weeks prior to the hearings.
Resolution 2008
BE IT FURTHER RESOLVED by the City Council of Rosemount, Minnesota:
The owner of any property so assessed may, at any time prior to certification of the assessment to
the County Auditor, pay the whole of the assessment on such property, with interest accrued to the
date of payment, to the City, except that no interest shall be charged if the entire assessment is paid
within 30 days from the adoption of the assessment. The owner may at any time thereafter, pay to
the County Auditor the entire amount of the assessment remaining unpaid, with interest accrued to
December 31 of the year in which such payment is made. Such payment must be made before
November 15 or interest will be charged through December 31 of the succeeding year.
ADOPTED this 16 day of December, 2009.
ATTEST:
Amy Domeier, City Clerk
William H. Droste, Mayor
Motion by: Seconded by:
Voted in favor:
Voted against
4
2009 Street Improvements Project
U. 148Th
ST W
U145THSTW
DAVENPORT
C
W AVENP•R PATH
AR11IOOR
CT
EE
Cr
DECEMBER
151ST ST W
155TH ST W
U 145Th ST 1Y
52NDCTW
153RD ST
151ST
RT
146TH ST W
41 W 1 7
VALLEY
OAK
POND
148TH ST W
U. 148TH ST
UPPER
CORNELL TRL W
I 156THSTW
148TH ST W
WACHTER
LAKE
aL 1�•P'iN
0 480 960
1,920
A
'MIS/City/Maps/Departmental Maps/Engineering/Chris/2009 Recon Locate
CO LL
W
2,880 3,840
Feet
143R
w
re 144T
05TH ST
148TH
143RD
IST W
H
I L. 147TH
u
a I 147TH ST W
U. 147TH ST W I
WE
142NDSTW
143RDSTW
ST W
LOWED
W
O
W
2
1
September 2008
2009 Street Improvement Project
C Project #426
W SB "_Project `14166g:6
Prepared By:
PCO
Date:
12/10/2008
2009 Street Improvement Project: Estimated Project Cost
Estimated Construction Cost
Estimated LEAF
Estimated Total
Surface Improvements
790,800.00
237,300.00
1,028,100.00
Sanitary Sewer Improvements
219,800.00
65,900.00
285,700.00
Watermain Improvements
324,600.00
97,400.00
422,000.00
Storm Sewer Improvements
216,200.00
64,900.00
281,100.00
Park Improvements
193,500.00
58,000.00
251,500.00
Total! 1,744,900.00 j
523,500.00
2,268,400.00
2009 Pavement Management Program: Estimated Project Cost
Seal Coat Improvements
175,700.00
I 8,800.00
I 184,500.00
Shannon Parkway Improvements
I 52,200.00
2,600.00
54,800.00
Total! 227,900.00
I 11,400.00
I 239,300.00
Proposed Funding
2009 Street Improvement( 2009 Pavement
Project I Management Program
Total
Street CIP Fund
583,600.00
239,300.00
822,900.00
Special Assessments
420,000.00
420,000.00
Sanitary Sewer Utility Fund
285,700.00
285,700.00
Water Utility Fund
422,000.00
422,000.00
Storm Utility Fund
191,100.00
191,100.00
Storm Core Fund
114,500.00
114,500.00
Park Fund
251,500.00
251,500.00
Total
2,268,400.00
1 239,300.00
1 2,507,700.00