HomeMy WebLinkAbout6.f. 2009 Schedule of Rates and FeesAGENDA ITEM: 2009 Schedule of Rates and Fees
AGENDA SECTION:
Consent
PREPARED BY: Amy Domeier, City Clerk
Department Directors
AGENDA NO.
ATTACHMENTS: Draft Resolution
APPROVED BY:
NO
RECOMMENDED ACTION: Motion to Adopt a Resolution Approving Amendments setting
the 2009 Schedule of Rates and Fees.
4 ROSEMO UNT
CITY COUNCIL
City Council Regular Meeting: December 16, 2008
SUMMARY
Staff recommends the approval of the above motion.
EXECUTIVE SUMMARY
ISSUE
The fee schedule is updated on a yearly basis upon review of frequent fees established by City
departments. The common fees issued by all City departments are included in the fee resolution. Staff
and financial consultant, Jessie Hart of Springsted and Associates, have worked together to establish
baseline charges that include work sheets of staff time involved for each fee. After review, fees are
changed as reflected in the attached resolution. The proposed amendments are noted with editing marks.
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2008
A RESOLUTION APPROVING AMENDMENTS SETTING THE
2009 SCHEDULE OF RATES AND FEES
WHEREAS, the City of Rosemount annually conducts a User Fee Study in order to establish
logical and defensible fees for the City of Rosemount; and
WHEREAS, the City of Rosemount has found certain fees and rates in need of adjustments.
THEREFORE, NOW BE IT RESOLVED by the City Council of the City of Rosemount that it
adopts the attached Schedule of Rates and Fees for 2009.
ADOPTED this 16 day of December, 2008 by the City Council of the City of Rosemount.
ATTEST:
Amy Domeier, City Clerk
William H. Droste, Mayor
Motion by: Second by:
Vote in favor:
Voted against:
Member(s) absent:
SCHEDULE OF RATES AND FEES FOR2009 Deleted: 2008
Planning and Zoning Review Fees Page 1
Public Works and Engineering Fees Page 3
Administration Fees Page 11
Fire Prevention Permits and Fees Page 13
Police Department Permits and Fees Page 15
Building Permits and Fees Page 16
Building Value Range Fees Exhibit A Page 21
Residential Building Valuations Exhibit B Page 22
Table A -33B Grading Plan Review Fees Exhibit C Page 23
Parks and Recreation Fees Page 24
Community Center and Arena Page 24
Outdoor Facilities Page 30
Park Dedication Fees Page 32
RESOLUTION,2008i Deleted: 2007
Deleted: 116 J
PLANNING AND ZONING REVIEW FEES
Administrative Appeals
Affidavits Certificate of Authenticity
Appeal of Planning Commission Decisions to the City Council
$250.00
$60.00
$150.00
City Staff Billing
For applications that include excessive staff time, services performed by City personnel will be
billed at two and one -half (2.5) times the actual payroll hourly rate. Services provided by City
consultants will be billed at the current consultant rates.
Comprehensive Guide Plan Amendment Application Fee $3,000.00
Conditional Use Permit $1,000.00
Documents
2020 Comprehensive Guide Plan
Comprehensive Stormwater Management Plan
Zoning Ordinance and Subdivision Ordinance
Zoning Map
Black and White
Color 11" x 17"
Color 24" x 36"
Environmental Assessment Worksheets
Escrow fee for City Consultant Services. Applicant will be responsible
for actual costs incurred by the city.
Interim Use Permits for Seasonal Sales of Christmas Trees For
Periods of Less than 40 Days Per Calendar Year
All Other Interim Use Permits
Mineral Extraction Permit
Application Fee
Annual Fee
Surety Bond
Rental Licensing
RESOLUTION ,2008-,_ Deleted: 2007
$31.00 tax
$92.00 tax
t Same as City wide
document fee
45.00 tax
$10.00 tax
$25.00 tax
$1,800.00
$10,000.00
$40.00
$500.00
Joint Applications
A planned unit development that includes a subdivision may have the fee waived for a
preliminary plat at the discretion of the Community Development Director.
$700.00
$370.00
$7,500.00 per acre
$25.00
Deleted: 116
Deleted: Actual costs will be billed tax,
Deleted: I.00
Planned Unit Development
Concept Plan
Master Development Plan
Final Development Plan
Major Amendment
Minor Amendment
Rezoning $1,200.00
Signs
Permanent Installation $270.00 +electrical
permit
Temporary Signs:
For permits obtained after placing the sign
For permits obtained prior to placing the sign
Site Plan Review $1,200.00
Subdivision Fees
Preliminary Plat $2,000.00 the
following.
Residential $10.00 per unit
Commercial /Industrial $50.00 per acre
Final Plat $1,200.00
Lot Split $1,400.00
Administrative Plat /Simple Plat $1,120.00
Other Subdivision (waiver of subdivision) $800.00
Lot Combination $400.00
TIF (Tax Increment Financing) Application Fee
Parcel in TIF
New TIF District
Transmission Facilities $1,000.00
Variance Petition Application Fee $200.00
Zoning Ordinance Text Amendment $1,800.00
Fee in Lieu of Tree Dedication $100.00 per caliper inch
of tree replacement
2
RESOLUTION ,2008-, Deleted: 2007
Deleted: 116
$2,200.00 +$20 per acre
$2,500.00
$2,000.00
$3,000.00
$900.00
$50.00
$10.00
$775.00
$1,750.00
PUBLIC WORKS AND ENGINEERING FEES
Assessments:
Street Assessments for Total Reconstruction Projects on existing streets are as follows:
Single Family /R -1 Zoned Lot
With Existing Concrete Curb Gutter $„5.600.00
With Existing Bituminous Curb $6,000.00
With Existing Gravel Road Full Cost of
Improvement
Rural and Transitional Residential
With existing bituminous
With existing gravel road
35% of Improvement
Cost
Full Cost of
Improvement
Street Assessments for Rehabilitation Projects on existing streets are as follows:
All Properties 35% of Improvement
Cost
Street Assessments for Overlay Projects on existing streets are as follows:
All Properties 35% of Improvement
Cost
1
City Equipment and Staff Rates:
Equipment
Per hour charge (does not include operator). Equipment charges, including licensed vehicles and
mobile equipment, will be calculated as follows: The true cost of the equipment (including
annual depreciation, annual insurance premiums, annual license taxes if applicable, annual
operating and maintenance expenses, and an annual carrying fee) will be divided by the estimated
hours the equipment is expected to be used annually.
Public Works Staff-Per hour charge
Staff charges for each employee billed will be calculated using the top hourly pay at the overtime
rate plus an additional 20% for FICA, Medicare and PERA expenses.
Engineering Fees:
Administrative Fees: For Chapter 429 or private improvements project charges shall be calculated
at 5% of public improvement construction costs.
Services provided by City consultants will be billed at the current rates plus 5 percent
administrative costs, unless assessed to benefiting property under a 429 project which then
excludes the 5 percent.
3
RESOLUTION 2008 Deleted: 2007
Deleted: 116
Deleted: 5,200.00
Deleted: Special Assessment
Search
Deleted: $80.00
Miscellaneous Public Works Fees:
As- builts /Record Drawings
Electronic Copy
Hard Copy
Feasibility Reports
Geographic information Systems Fees (GIS)
Single family, town homes or multi family
All other Final Plat
Simple Lot /Parcel split or boundary change
Right -of -Way Fees Charges:
Registration Fee
2) Inspection
a) Location before work 0.50 X 40
b) Compliance during work 0.50 X 40
c) Completion after work 0.50 X 40
d) Re- inspection 0.50 X 40
3) Mapping
a) Review data 0.50 X 50
b) Transfer to Autocad 0.50 X 50
c) Insert to overlay to tie in 0.50 X 50
Total Cost
4
RESOLUTION,2008i Deleted: 2007
$10.00 tax
$20.00 tax
$23.47 tax
$60.00 per lot /unit
$120.00 per acre
$300.00
Time X Per Cost
Involved Ho it
(HQ)
Administration 0.25 X 40 10.00
Review 0.50 X 40 20.00
Recording 0.25 X 40 10.00
Total Cost 40.00
Registration fee is due annually and is due by January 15 of the corresponding year.
Excavation Permit Fees
A) Hole
Administration 0.50 X 40 20.00
Verification
1) Plan Review 0.50 X 50 25.00
20.00
20.00
20.00
20.00
25.00
25.00
25.00
$200.00
Plus $0.20 per lineal foot for
each excavation over 1,000
Deleted: 116
B) Emergency Hole
Obstruction Permit Fee
Administration
Inspection after completion
A) Administration
B) Recording
C) Review
0.50 X 40 20.00
1.50 X 30 45.00
Total Cost $65.00
C) Trench
Administration 0.50 X 40 20.00
Verification
1) Plan Review 1.50 X 50 75.00
2) Inspection
a) Location before work 0.50 X 40
b) Compliance during work 1.50 X 40
c) Completion after work 1.50 X 40
d) Re- inspection 0.75 X 40
3) Testing Result Review
a) Compaction 0.25 X 40 10.00
b) Material 0.25 X 40 10.00
4) Mapping
a) Review data 0.50 X 50 25.00
b) Transfer to Autocad 0.50 X 50 25.00
c) Insert to overlay to tie in 0.50 X 50 25.00
Total Cost X60.00
The average trench is 330 lin. ft. past the width of a
hole. Therefore, the number of 100 lin. ft. (or portion
thereof) units is 4. The cost per 100 lin. ft. unit is
360.00 4 $90.00 /100' unit.
Minimum Base Coat
5
feet
20.00
60.00
60.00
30.00
0.50 X 40 20.00
0.25 X 40 10.00
0.75 X 50 37.50
RESOLUTION ,2008 Deleted: 2007
Deleted 116
57.50
Delay Penalty
Plus additional fee based on length
Inspection
1) Compliance during work 1.50 X 40 60.00
2) Completion after 0.25 X 40 10.00
Additional fee on assumed 1000 lin. ft. permit 52.50
Additional cost per lineal foot $70.00 1000 0.07
A) Administration 1.5 X 40 60.00
For up to 3 days of non completion and non -prior notice
before specified completion date.
After 3 days, an additional charge of $20 /day will be levied.
Total Penalty Charge 60.00
(Up to 3 days late)
Each day late over 3 days
Right of Way /Utility Easement Vacation Fee
Sidewalk/Trail Snow Removal
Street Excavation and Curb Cuts
Curb Cuts, Driveway Access Permits, Transit Stop Kiosks
Street Excavation Minimum bond deposit with City
Street Utility Specifications
Weed Inspection
Wetland Notification /Application Form (DepositforCostt Incurred)
Solid Waste Hauling License $320.00
Water Sanitary Sewer, Storm Water Usage Rates:
Water and Sanitary Sewer User Fees
Usage —Based on Quarterly Meter Readings
Water Use
Water Fixed Charge
Sanitary Sewer Use
Sanitary Sewer Fixed Charge
6
RESOLUTION ,20081 Deleted: 2007
Deleted: 116
$60.0O
Plus 2,0.00 /Day
$775.00
$225.00 per lot
$180.00
$2,000.00
$23.47 tax
$580.00
$3,175.00
$1.02 /1000 gallons
$8.90 each account
$1.40 /1000 gallons
$20.00 each account
Water Surcharge and Meter Maintenance Per Chart Below (Quarterly)
Meter Size Surcharge Meter Maintenance
Single Family 5/8" 8.80 0
Multi Family 5/8" 6.80 0
1" 13.50 6.25
1 /z" 28.00 11.25
2" 31.50 18.15
2 39.35 22.20
3" 47.00 26.25
4" 70.00 45.00
6" $154.00 $100.00
8" $170.00 $130.00
*Commercial, Industrial or Institutional /Commercial and Industrial are taxable
*Meter maintenance applied to Base Fixed Water Charge based on meter size.
Sewer Only Users
Bulk Water
Irrigation Meters: Exempt from Sanitary Sewer Usage charges.
Water charge by meter size and Surcharge by meter size.
Miscellaneous Utility Charges:
Meter Disconnection Charge $80.00
Meter Reconnection Charge $80.00
RESOLUTION 008 -f Deleted: 2007
$40.00 per quarter per
SAC unit
$2.00 per 800 gallons
tax
Pays Water Usage charge, Fixed
Deleted: 116
QUARTERLY STORM WATER UTILITY FEES
Storm Fee
Land Use Land Use Description Unit Fee
Category
1 Single family residential, R -1,2, RL, Multi -unit Residential 1.82 -f Deleted: 11.26
residential with individual water meters, R -3,4, Unit
Platted /undeveloped, Minimum charge for all
parcels
2 Rural residential, Agricultural, RR, AG Lot $,12.45 Deleted: 11.26
3 Parks, Golf Courses, Cemeteries, PK Acre x.53* Deleted: z.a1
4 Undeveloped /un- platted Acre $.15*
5 Multi -unit residential without individual water Acre X43.92* -f Deleted: 41.82
meters, Apartments, Churches, Schools, Hospitals,
Government Buildings, Mobile Home Parks
6 Commercial, Industrial and Parking Lots, C- Acre $,54.78
1,2,3,4,IP,IG,PL,WM
*Categories 3,4,5, 6 are subject to the minimum charge of $J1.82. The largest of either the
minimum or application of the above rates will be used for the fee.
Deleted: 52.17
Deleted: 10.72
Manual Meter Read $50.00
Monthly New Customer List
Hard Copy $10.00 tax
Electronic Copy (Must be pre -paid) (Annual Fee Jan. Dec. Fee $50.00
will be pro -rated for partial calendar year, by month)
Total Customer List
100 copies of black and white letter or legal sized copies; or
More than 100 pages and 15 minutes or longer of staff time
Utility Billing Search /Resident
Utility Billing Search/Non- Resident
RESOLUTION,20081_ Deleted:
$.25 /page tax
Actual costs will be
billed tax
No Charge
No Charge
Water Meter Accuracy Check
Testing 5/8" 2# meters $125.00
Testing 3" meters $125.00
Testing 4" meters $125.00
Testing 6" meters $125.00
Water Meter Installation Charges: Water meter charges are the actual cost of meter and
appurtenant parts, plus shipping and handling. Charges are subject to change during the year.
See the most recent Cost of Water Meter schedule.
Water, Sanitary Sewer and Storm Water Capital Charges:
Metropolitan Council Environmental Services Availability Charge (Metro SAC)
Per Sac Unit, as determined by the MCES $t2 000.00
City Sanitary Sewer Availability Charges
CITY SANITARY SEWER Trunk Area Assessments Per SAC Unit as determined by
CHARGES collected with final the MCES and collected with the
plat/subdivision Building Permit
agreement
Single Family Residential
Multi Family Residential $1,075.00 per acre $1,200.00
Institutional, Commercial
and Industrial
Any part of the Trunk Area Assessment that is not collected with a plat /subdivision agreement
will be collected as a connection charge, in addition to any other connection charge established
by this resolution, prior to connection to the sanitary sewer system
City Water Availability Charges
Trunk area assessments collected with final plat /subdivision agreement as follows:
Deleted: 116
Deleted: 1,825.00
All Zoning types $,5.800.00 per acre Deleted: 4,860.00
Any part of the Trunk Area Assessment that is not collected with a plat /subdivision agreement
will be collected as a connection charge, in addition to any other connection charge established
by this resolution.
And Water Access Charge collected with the Building Permit as follows:
Single Family Res $,1.970.00
Multi- Family Res $,1.970.00
Meter $,8.920.00
1 1 /2" Meter $,13,375.00
2" Meter 417.835.00
2 1 /2" Meter $,22,300.00
Meter $,26.770.00
4" Meter 16,3122.11L0
6" Meter $,35,685.00
8" Meter 140.00
1"
3"
Supplemental Water and Sanitary Sewer Connection Charges
In addition to other charges imposed at the time of connection to water and sanitary sewer
systems, supplemental connection charges, set by reference to the portion of the cost of
connection that has been paid by the premises being connected, in comparison with other
premises, will be imposed and collected from the properties, and in the amounts, listed below, for
each connection made:
1 PID Address
X009 Supplemental X009 Supplemental Sewer Deleted: 2008
340201001006
1 340201001009
344430001001
344430001002
344430002001
344430002002
344430003001
344430003002
344430004001
344430004002
344430005001
344430006001
344430007001
344430008001
344430009001
344430000001
Such supplemental
1, 2007, by three an
Water Connection Connection Charges Deleted: 2008
Charges
2771 -132' St. W. Certified Certified
2813 132"' St. W. 4 7. 7 V.654.46
173 CR 42 (2693 Paid in Full Paid in Full
132 Ct W.)
2694 132"' Ct. W Paid in Full Paid in Full
2685 —132"' Ct. W ,$4.767.49 Paid in Full
2684 —132'" Ct. W Paid in Full Paid in Full
2675 132"' Ct. W X4.767.42 x $5.654.46
2686 —132' Ct. W Paid in Full Paid in Full
2665 132' d Ct. W X64.767.49 x $5,654.46
2604 —132' Ct. W Paid in Full Paid in Full
2655 —132"' Ct. W )4.767.49 %5.654.46
2645 132"' Ct. W x $4.767.49 x $5,654.46
2055 —128'' St. W x $4.767.49 )5.654.46
(2635132"' Ct W)
2625 —132"' Ct. W Paid in Full
2615 —132' Ct. W Paid in Full
2605 —132"' Ct. W Paid in Full
connection charges shall be increased each calendar year commencing January
d one -half percent (3.5 from the charges of the preceding year.
RESOLUTION 2008 Deleted: 2007
Paid in Full
Paid in Full
Paid in Full
Deleted: 116
Deleted: 1,630.00
Deleted: 1,630.00
Deleted: 7,370.00
Deleted: 11,055.00
Deleted: 14,740.00
Deleted: 18,425.00
Deleted: 22,120.00
Deleted: 25,800.00
Deleted: 29 ,500.00
Deleted: 33,175.00
Deleted: 4,606.27
Deleted: 5,463.25
Deleted: ;4,606.27
Deleted: ;4,606.27
Deleted: ;5,463.25
Deleted: ;4,606.27
Deleted: ;5,463.25
Deleted: $4,606.27
Deleted: ;5,463.25
Deleted: $4,606.27
Deleted: $5,463.25
Deleted: ;4,606.27
Deleted: $5,463.25
Storm Water Charges
a. For this charge, Newly Developed Properties are defined as any property, including platted or un-
platted parcels, which are improved with buildings, grading, or otherwise creating an impervious
surface. In addition to the following charges, stormwater ponding fees /credits will be determined at
the time of final platting or building permit application.
Connection Charges (STAAC)
collected with the Building
Permit on all Newly Developed
properties
$745 per lot
$280 per housing unit (4 plex 4
units)
$2,200 per acre
$2,200 per acre
*Acres are defined as gross acres of developable property minus pond acreage (at high water
level) and wetlands at delineation line, rounded to the nearest one tenth (1/10' of an acre.
STORMWATER
CHARGES
Single Family
Multiple Family
Public /Institutional
Commercial and Industrial
Trunk Area Assessments
to be collected from
Developers on all newly
developed properties
$6,665 per acre*
Any part of the Trunk Area Assessment that is not collected with a plat /subdivision agreement
will be collected as a connection charge, in addition to any other connection charge established
by this resolution, prior to issuance of a Certificate of Occupancy for use of any property.
Connection Charges (STAC) Collected with the Building Permit on all newly developed properties
that have not paid trunk area assessments listed above (Gross Area):
Single Family $2,960.00 per lot
Multiple Family $8,320.00 per acre
Public /Institutional $8,885.00 per acre
Commercial $8,265.00 per acre
Industrial $8,265.00 per acre
Water Tower Antennas Application Fee $2,500.00
Per year rent payments based on 9" panel Type or 3 A whip type antennas and appropriate
outside equipment area will be charged at the current yearly rate, which is adjusted annually.
Minimum per year lease payment increase 5%
10
RESOLUTION ,2008- Deleted: 2007
Deleted: 116
ADMINISTRATION FEES
Adult Use Establishment License $3,000.00
Check Return Charge $30.00
Videotapes
Audiotapes
Documents
The following fees for copies apply to all
departments.
100 copies of black and white letter
or legal sized copies: or
More than 100 pages and 15 minutes or
longer of staff time; or
Document that is outsourced
Large Public Gathering on City Parkland
Liquor Licenses:
On-Sale Intoxicating
Class A (Jan 1 -Dec 31)
Class B (Jan 1 -Dec 31)
On-Sale Wine
Off-Sale Intoxicating
On-Sale 3.2% Malt (July 1-June 30)
Off-Sale 3.2% Malt (July 1-June 30)
11
$5.00
$5.00
$.25 /page tax
$.30 /page tax (for color)
Actual costs will be billed tax
Actual costs will be billed tax
Faxed copies are $.50 per page plus tax. If more than 100 pages or if long distance
charges apply, actual costs plus tax will be billed to the requester. Mailed copies are
charged the applicable document rate and all handling costs plus tax.
$150.00
$4,500.00
$3,000.00
$550.00
$200.00
$250.00
$210.00
RESOLUTION ,2008-, Deleted: 2007
Deleted: 116
Deleted: Copies
Deleted: City Council, Port Authority,
Planing Commission, Parks Recreation
or Utilities Commission Agendas (mailed)
Deleted: $.25 /page handling tax
Deleted: City Council Port Authority,
Planning Commission, Parks Recreation
or Utilities Commission Minutes (maled)1
*no charge to Rosemount re id er&
Deleted: $.25 /page handling tax
Deleted: The above items are availabk at no
charge to residents ttdocuments an requested on an
individual basis.
Temporary On -Sale Intoxicating $170.00 /event
Temporary On -Sale 3.2% Malt $150 /event
Special Club On -Sale Intoxicating
(Jan 1 -Dec 31)
Membership: under 200 $300.00
between 201 and 500 $500.00
between 501 and 1,000 $650.00
between 1,001 and 2,000 $800.00
between 2,001 and 4,000 $1,000.00
between 4,001 and 6,000 $2,000.00
more than 6,001 $3,000.00
Special Sunday Gan 1 -Dec 31) $250.00
Bottle Club $140.00
One -day Bottle Club $25.00
On Public Premise Annual License $350.00
Gan 1 -Dec 31)
Per event $30.00
Amending an Existing Liquor License $175.00
Massage Therapist License Gan 1 -Dec 31) $90.00
Peddlers, Solicitors and Transient Merchants $90.00
Gan 1 -Dec 31)
Gambling Permits $250.00
RESOLUTION 0_308-, Deleted: 2007
Deleted: 116
Alarm System Permit/Review
As recommended by Exhibit A
Minimum fee Large
Minimum fee Small
Burning Permit Commercial
Day Care Inspection
Fire Dept. Certificate of Occupancy
Inspection/Renewal Fee
Copies of Fire Dept. Officers Report
Fire Dept. Re- inspection Fee
Fire Dept. Special and Miscellaneous
Inspections
Fire Photo (per copy)
I Fire Video Tape
Fire Sprinkler Protection System
State Surcharge:
Copies of Fire Dept. Report
I Fuel Tank Installation or Removal:
Haunted House Operation Permit
Penalty for Failing to Obtain Permit
FIRE PREVENTION PERMITS AND FEES
13
Surcharge
$125.00 Surcharge
$235.00
$50.00
$965.00
fee
$47.00
$130.00
100.00
$880.00
RESOLUTION,2008i Deleted: 2007
d
tame as Citywide document
fee
-5.00
-5.00
As recommended by Exhibit A.
As recommended by the
Minnesota State Code Section
16B.70
Penalty for failing to obtain a
permit prior to starting work
required is two times the regular
permit fee established herein.
Deleted: 116
—f Deleted: 225.00
Deleted: 100.00
Deleted: $.25 /page tax
-f Deleted: $.25 /page tax
Deleted: Actual cost of reproduction
and handling. (Handling charge will be
taxed.)
Deleted: Actual cost of reproduction
and handling. (Handling charge will be
taxed)
Deleted: As recommended by Exhibit A.
Plan Check Fees:
Commercial /Industrial /Multi- family buildings
and structures
Residential buildings
Residential Accessory Structures/additions
alterations/repairs /remodeling
Pyrotechnic Display of Fireworks
Fireworks Sales
State Surcharge
Storage and use of Hazardous Materials
Over quantities listed in current Fire Code
Edition Section 4. Permit valid for twelve
months maximum
Temporary Use of LP Gas $100.00
14
Sixty -five percent (65 of the
building permit fee.
Sixty -five percent (65 of the
building permit fee for the new
single family dwellings.
Sixty -five percent (65 of the
building permit fee.
$200.00
$350.00
As recommended by the
Minnesota State Code Section
16B.70.
50.00
RESOLUTION ,2008- Deleted: 2007
Deleted: 116
Deleted: 615.00
POLICE DEPARTMENT PERMIT AND FEES
Alarm User Permit $160.00
Animal Impound
First impound in 12 month period (same $30.00
animal)
All impounds beyond first in 12 month period $50.00
Animal Licenses
Registration Fees
Annual fee for spayed and neutered $6.00
animals
Annual fee for unsprayed and un- neutered $12.00
Duplicate Tags $5.00
Applicants 62 years of age or older shallpay fifty percent (S0%) of above stated fees
Analog Audio Tape Copies
Background checks
Contractual Overtime
Dangerous Dog Registration State authorked
Pawn Shop License Fee:
0 -20 pawns a day
21 -40 pawns a day
41 and over pawns a day
Initial application includes ,I' 1,500.00 deposit for investigation fee
Photographs:
Traditional copy of photos
Color copy of photo
Digital copies of photos
Copies of Police report
Video Copies
Traditional or Digital
Tattoo Body Piercing Establishments
Annual Business License
Annual Personal Service License
15
$5.00
$18.78 tax ($20.00)
$48.00 per hour
$300.00
$1,500.00 yr
$3,000.00 yr
$5,000.00 yr
as set in City Code
$10.00 per roll tax
$.50 /page tax
$.25 /page tax
$.25 /page tax
$5.00
$250.00
$100.00
RESOLUTION0008 Deleted: 2007
Deleted: 116 3
Pigeons Loft and Fowl Coop $25.00 4- Formatted: Indent Left: o^
Building Permits
As recommended by Value Range Exhibit A.
As -built Survey Escrow Fee $2,000.00
Certificate of Occupancy Inspection and /or 105210
change of use
Administrative Handling Fee
BUILDING PERMITS AND FEES
Building Department Reports $160.00 /year tax
$12.50 /month tax
2. Administrative fee for each permit $10.00
0 to 100 ampere capacity
101 to and including 200 ampere capacity
For each additional 100 ampere capacity or
fraction thereof
16
RESOLUTION,2008i Deleted: 2007
Deleted: 116
A handling fee of $25.00 will be charged
for address and lot changes and for permit
and file editing. These changes must be
done within thirty (30) days of permit
issuance or all prior permit fees will be
forfeited (non refundable).
Electrical Permits
1. Minimum fee for each separate inspection of an $4 .MX! Deleted: 35.00
installation, replacement, alteration or repair limited
to one inspection only.
3. Services, changes or service, temporary services, additions, alterations or repairs on either
primary or secondary services shall be computed separately.
$20.00
$25.00
$8.00
Deleted: 50.00
4. Circuit, installation of, additions, alterations or repairs of each circuit or sub feeder shall be
computed separately, including circuits fed from sub feeders and including the equipment served
except as provided for in Items 4 through 9.
0 to and including 30 ampere capacity
(maximum number of 1 -30 ampere circuits to be
paid on is 30 to any one cabinet)
31 to and including 100 ampere capacity
For each additional 100 ampere capacity or
fraction thereof
17
$7.00
$8.00
$5.00
In addition to the above fees:
A charge of $4.00 will be made for each street lighting standard. A charge of $5.00 will be made
for each traffic signal standard. Circuits originating within the standard will not be used when
computing fees.
In addition to the above fees:
All transformers and generators for light, heat and power will be computed separately at $5.00
per unit plus $.25 per KVA up to and including 100 KVA.101 KVA and over will be computed
at $.20 per KVA
All Transformers for signs and outline lighting shall be computed at $4.00 for the first 500 VA or
fraction thereof per unit plus $40.00 for each additional 100 VA or fraction thereof.
In addition to the above fees (unless included in the fee filed by the initial installer):
Remote control, signal circuits and circuits of less than 50 volts shall be computed at $6.00 pr
each ten (10) openings or devices of each system plus $.50 for each additional opening.
For review of plans and specifications of proposed installations there shall be a minimum fee of
$100.00 up to and including $30,000.00 of electrical estimate, plus 1/10 of one percent (1 on
any amount in excess of $30,000.00 to be paid by persons or firms requesting review.
When re- inspection is necessary to determine whether unsafe conditions have been corrected and
such conditions are not subject to an appeal pending before any court, a re- inspection fee of
$35.00 may be assessed in writing by the inspector.
For inspections not covered herein, or for requested special inspections or services, the fee of
$50.00 per man hour, including travel time, plus the standard IRS allowed mileage reimbursement
per mile traveled, plus the reasonable cost of equipment or material consumed. This section is
also applicable to inspection of empty conduits and such jobs as determined by the City.
For inspection of transient projects including, but not limited to carnivals and circuses the
inspection fees shall be computed as follows:
RESOLUTION ,2008-, Deleted: 2007 J
Deleted: 116
Power supply units according to item 2 of the fee schedule. A like fee will be required on power
supply units at each engagement during the season, except that a fee of $50.00 will be charged for
additional time spent by the inspector if the power supply is not ready for inspection at the time
and date specified on the Request for Inspection as required by law.
Rides, devices or concessions shall be inspected at their first appearance of the season and the
inspection fee shall be $35.00 per unit.
Fees for services, feeders and circuits operating at over 250 volts shall be doubled those listed in
items 3 and 4 above.
A $.50 State surcharge is to be added to each permit.
Grading Permits:
All fees are established in Exhibit D
Plan review fees are found in Exhibit D
State surcharge fee of $.50
Bond Required $3,000.00 per disturbed acre:
minimum one acre
Plan Check Fees:
Commercial/Industrial/Multi- family building and
structures
Residential buildings
Residential Accessory Structures
Plumbing, Heating, Ventilating, Air conditioning
Refrigeration Fees:
Residential (4 or less units)
New Construction
Alteration /repair
Multiple Housing (5 or more units)
New Construction
Alteration /repair
18
RESOLUTION ,2008-, t Deleted: 2007
1 Deleted: 116
Sixty five percent (65 of the building
permit fee.
Sixty-five percent (65 of the building
permit fee for new single family
dwellings /single family additions,
alterations, etc., similar plans per state
statute 1300.0160 twenty -five percent
(25 of the building permit fee.
Additions /alterations /repairs /remodeling:
sixty-five percent (65 of the building
permit fee.
$125.00
$70.00
$100.00 /unit
$70.00 /unit
Commercial /Industrial /Institutional
New Construction:
Commercial /Industrial /Institutional /Public:
Set fee of $75.00 for project valued under $3,500.00 which requires one inspection.
Set fee of $125.00 for project valued under $3,500.00 which requires two inspections.
For projects valued over $3,500.00, 1.5% of the value of the project, with a minimum fee of
$215.00.
Plus $.0005 (valuation) surcharge for all projects.
Sewer and Water Installation Permit Fees:
Municipal Service residential (4 or less units) $55.00
Municipal Service
commercial /industrial /institutional
Municipal Service commercial /industrial /institutional 1.5% of valuation plus $.0005 surcharge.
$105.00 minimum fee plus $,0005
Surcharge.
Private Sewer all classifications
New construction or reconstruction
Dakota County Recording Fee
Septic System Maintenance /Operation Permits
and Fees:
Residential Maintenance Permit
Commercial, Industrial, Public or Institutional
Operational Permit
Late renewal fee for maintenance or operational
permits
Special Individual Sewage Treatment System
(I.S.T.S.) Inspections or Investigations
State Surcharge:
State surcharge added to each permit
19
1.5% of valuation plus $.0005 surcharge
$215.00 minimum fee plus $.0005
surcharge
1.5% of valuation plus $.0005 surcharge.
$105.00 minimum fee plus $,0005
Surcharge
$250.00
50.00
$300.00
No fee
$40.00
$25.00
$100.00
RESOLUTION,2008 Deleted: 2007
As recommended by the Minnesota State
Code Section 16B.70.
Set fee of $.50 per permit permit based on
value is $.0005* value of job
Deleted: 116
MISCELLANEOUS BUILDING FEES
Decks
Demolition Permit
Fences
Fireplaces
Manufactured Homes
Inclusive of all inspections and connections
Moving Permit
Moving Permit Out
Moving Permit In
Penalty for failing to obtain a permit prior to
starting work requiring a permit:
Re- inspection
Roofing, Re- Roofing Residential
Residential —Tear off, Re -roof, and Overlay
Commercial/Institutional/Industrial
Siding Residential
Re- siding
Commercial /Institutional /Industrial
Satellite Dishes and Antennas Residential:
All other antennas and satellite dishes
Single Family Dwelling Basement Finish
Slabs
Residential
Residential /Multi -F. y Slabs /Patios
Commercial /Institutional /Industrial
Special and Miscellaneous Inspections
Swimming Pools
Temporary Construction Trailer
Water Softener Installation
Window Replacement
20
$100.00
85.00
$75.00
$100.00
$100.00
$180.00
$175.00
2 times the regular permit fee as
established herein
$50.00
$75.00
As recommended by Exhibit A Plus
$.0005 surcharge. Minimum fee of
$100.00 +$.0005 surcharge
$75.00
As recommended by Exhibit A
-plus $.0005 surcharge. Minimum fee
$84.00 plus $.0005 surcharge.
No fee
Per Exhibit A Plus $.0005 surcharge.
Minimum fee $84.00 plus $.0005
surcharge
$175.00
$50.00
70.00
$70.00
$75.00
,150.00
$65.00
0.00,
$46.00
RESOLUTION ,2008 Deleted: 2007
Deleted: 116
Deleted: 130.00
Deleted: 15.00
Deleted: (State mandated E«, maximum)
Sample Fee Schedule 2004
EXHIBIT A
Building Value Range Fee Schedule
Building Value Range Fee Range
$0 $500.00
$500.01 $2,000
$2,000.01 425,000
$25,000.01 $50,000
$50,000.01 $100,000
$100,000.01 $500,000
$500,000.01 $1,000,000
$1,000,000.01 and up
$25.00
$25.00 for the first $500
$3.25 per additional $100
$73.50 for the first $2,000
$14.75 per additional $1,000
$413.00 for the first $25,000
$10.75 per additional $1,000
$681.75 for the first $50,000
$7.50 per additional $1,000
$1,056.75 for the first $100,000
$6.00 per additional $1,000
$3,456.75 or the first $500,000
$5.00 per additional $1,000
$5,956.75 for the first $1,000,000
$4.00 per additional $1,000
*Chanties per LMC report of 11/3/03
This fee schedule was developed cooperatively by members of the League of Minnesota
Cities and the Association of Metropolitan Municipalities, with information provided by
the State Building Codes and Standards Division.
21
RESOLUTION ,2008 Deleted: 2007
RESOLUTION ,2008 Deleted: 2007
Deleted: 116
EXHIBIT B
RESIDENTIAL BUILDING VALUATIONS*
Cost Per Square Foot
By reference the City adopts the most recently approved valuation table approved by the Formatted: Left
Minnesota Department of Industry and Labor.
Formatted: Font Garamond, 12 pt,
SINGLE FAMILY DWELLINGS -TYPE V- WOOD FRAME Not Bold
First Floor Deleted: $79.78
Second Floor Deleted: $79.78
SINGLE FAMILY DWELLINGS BASEMENT
Finished Basements
Unfinished Basements
Crawl Space
Conversion
Un- excavated Foundation Areas
GARAGES:
Wood Frame
Masonry Construction
Carport
Pole Building
DECKS, WOOD FRAMED, ENTRY PORCH
FOUR SEASON PORCHES
THREE SEASON PORCHES, WOOD FRAMED
GAZEBOS, WOOD FRAMED /SCREENED
ZERO CLEARANCE FIREPLACES
MASONRY FIREPLACES:
One Level
Each Additional Level
SINGLE FAMILY DWELLING MECHANICAL
INSTALLATION VALUES:
Plumbing
(Up to 2 Full Baths —1 Half Bath Basement R.I. Only)
Plumbing, Each Additional Bathroom
HVAC (No Air conditioning, One Furnace)
HVAC, Air Conditioning
HVAC, Each Additional Furnace
City Sewer /Water Installation
Septic Systems(s):
Standard Trench /Drain field
Mound System
Tanks /Pumped up /Drain field
c
22
—1 Deleted: $15.90
Deleted: $8.16
Deleted: $5.54
Deleted: $4.09
Deleted: $2131
Deleted: $33.68
-1 Deleted: $35.16
-1 Deleted: $16.35
Deleted: $16.25
4 Deleted: $5,900.00
Deleted: $3,000.00
J
J
Deleted: $8,000.00
,1 Deleted: $1,000.00
Deleted: $5,000.00
Deleted: $4,000.00
Deleted: $11,000.00
Deleted: 6,000.00
Deleted: *Permit fees are
J automatically revised in May to reflect
J the new schedule of Building Vahradon
Data issued by the Minnesota
Deparunent of Administration. 1
EXHIBIT "C"
TABLE A -33 -A- GRADING PLAN REVIEW FEES
50 cubic yards (38.2m or less
No fee
50 cubic yards (38.2m or less
$23.50
101 to 1,000 cubic yards (77.2m to 764.6m
$37.00
1,001 to 10,000 cubic yards (765.3m to 7645.5m
$49.25
10,001 to 100,000 cubic yards (7646.3m to 76,455m $49.25 for the first 10,000 cubic yards (7645.5m plus
$24.50 for each additional 10,000 yards (7645.5m or fraction thereof.
100,001 to 200,000 cubic yards (76 456m to 152 911m $269.75 for the first 100,000 cubic yards (76
455m plus $13.25 for each additional 10,000 cubic yards (7645.5m or fraction thereof.
200,001 cubic yards (152 912m or more $402.25 for the first 200,000 cubic yards (152 911m plus $7.25
for each additional 10,000 cubic yards (7645.5m or fraction thereof.
Other Fees:
Additional plan review required by changes, additions or revisions to approved
plans
(minimum charge is one -half hour)
$50.50 per hour*
TABLE A 33 B GRADING PERMIT FEES
50 cubic yards (38.2m or less
$23.50
51 to 100 cubic yards (40m to 76.5m
$37.00
101 to 1,000 cubic yards (77.2m to 764.6m $37.00 for the first 100 cubic yards (76.5m plus $17.50 for
each additional 100 cubic yards (76.5m or fraction thereof
1,001 to 10,000 cubic yards (765.3m to 7645.5m $194.50 for the first 1,000 cubic yards (764.6m plus
$14.50 for each additional 1,000 cubic yards (764.6m or fraction thereof.
10,001 to 100,000 cubic yards (7646.3m to 76,455m $325.00 for the first 10,000 cubic yards (7645.5m
plus $66.00 for each additional 10,000 cubic yards (7645.5m or fraction thereof.
100,001 cubic yards (76 456m or more $919.00 for the first 100,000 cubic yards (76 455m plus $36.50 for
each additional 10,000 cubic yards (7645.5m or fraction thereof.
Other Inspections and Fees:
1. Inspections outside of normal business hours (minimum charge two
hours)
z Re- inspection fees assessed under provisions of Section 108.8
3. Inspections for which no fee is specifically indicated (minimum charge
one half hour)
$50.50 per hr
$50.50 per hr
$50.50 per hr
*Or the total hourly cost to the jurisdiction, whichever is the greatest This cost shall include supervision,
overhead, equipment, hourly wages and fringe benefits of the employees involved.
1 The fee for a grading permit authorizing additional work to that under a valid permit shall be the difference
between the fee paid for the original permit and the fee shown for the entire project
2 Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall indude supervision,
overhead, equipment, hourly wages and fringe benefits of the employees involved.
23
RESOLUTION ,2008 Deleted: 2007
Deleted: 116
PARKS AND RECREATION FEES
I. COMMUNITY CENTER, ARENA, AND FACILITIES
A. Definitions
1. City Groups. Organizations. or Activities (City sponsored activities.)
Includes Rosemount Halloween Festivity, Leprechaun Days, and Shamrock
Awards Banquet.
2. Civic and Non -Profit Groups
Includes civic organizations, political groups, churches, athletic associations,
fraternal groups, charitable groups, and character building organizations devoted to
social, educational, recreational and civic development or other like purposes.
3. Commercial Groups
Includes groups that operate for profit or the purpose of promotion or
advertisement.
4. Governmental Agencies
Includes county, state, federal, and special tax districts serving Rosemount
residents.
5. Non Resident Groups
Includes groups having more than one -half of their members mt living within the
Rosemount City limits.
6. Resident
Any person who maintains a residential address in the City of Rosemount.
7. Resident Groups
Includes groups having more than one -half of their members living within the
Rosemount City limits.
8. School District #196
Includes all directly related school activities including curricular, co- curricular, extra
curricular and all directly controlled school organizations; including Community
Education.
9. Resident Athletic Groups
Includes RAAA and RAHA.
24
RESOLUTION„2008i Deleted: 2007
Deleted: 116
B. Priority for Scheduling Facilities
1. Purpose
Due to the large number of organizations that request Community Center facilities,
the City Council has deemed it necessary to group by activity these organizations and
establish a priority in order to insure that Community Center facilities are made
available so as to best meet community needs.
2. Priority of Users
a. Rosemount Parks and Recreation programs
b. Community events
c. National Guard
d. All others
3. Permits and Rental Agreements
Uses may be determined by permit, contract or rental agreement on such terms as
mutually agreed upon.
C. Facility Fees
1. Purpose
The City Council establishes the following user classifications for the purpose of
setting fees. Specific fee charges are dependent on the purpose of the activities, type
of group, facility that is requested and special services and /or equipment needed,
with consideration to the market place and such other factors as may be deemed
relevant. A fee schedule will be established by the City Council after review and
recommendation of the Parks and Recreation Commission. The fee schedule will be
reviewed as necessary but not less than annually by the Parks and Recreation
Commission. Under supervision of the Parks and Recreation Director, the
management staff at the Community Center would have the ability to negotiate for
last minute rentals, long term rentals, and special events in order to maximize use -of
the Community Centex. Staff would provide quarterly exception reports.
2. Fee Class of Users
a. City sponsored activities
b. Residents, resident civic, resident non -profit groups, ISD 196 schools, and other
Rosemount schools
c. Non residents, non resident civic, non resident non -profit groups, and other
governmental agencies
d. Commercial groups
25
RESOLUTION ,20081 Deleted: 2007
Deleted: 116
3. Fees
a. Auditorium
Auditorium alone:*
FEE CLASS HOURLY RATE 8 HOURS OR MORE
Class 1 Fees based upon cleaning and set -up costs and other costs directly
associated with the event
Class 2 $50 tax per hour $350 tax
Class 3 $55 tax per hour $400 tax
Class 4 $75 tax per hour $550 tax
Auditorium with the Banquet Room and adjoining Lobby:* (all day fee)
FEE CLASS SATURDAY FEE FRIDAY FEE WEEKDAY FEE
(Sun- Thurs)"`
Class 1 $700 Fees based upon cleaning and set -up costs and other
costs directly associated with the event.
RESOLUTION ,2008 Deleted: 2007
Class 2 $800 tax $700 tax $400 tax
Class 3 $950 tax $850 tax $600 tax
Class 4 $1,200 tax $1,100 tax $800 tax
A fee tax will be assessed if using audio visual equipment other than microphones and standard
lighting. (see 3 e. for Audio Visual Equipment fees)
Add $100 tax for Sunday Thursday rentals scheduled past 10:00 p.m., no later than
midnight.
26
Deleted: 116
b. Banquet Room
FEE CLASS SATURDAY FEE FRIDAY FEE WEEKDAY FEE
(Sun- Thurs)
Class 1
$550 tax Fees based upon cleaning and set -up costs and other
costs directly associated with the event.
Class 2 $650 tax $550 tax $300 tax
Class 3 $750 tax $650 tax $350 tax
Class 4 $850 tax $750 tax $400 tax
Add $100 tax for Sunday Thursday rentals scheduled past 10:00 p.m., no later than
midnight
c. Classrooms
FEE CLASS PER CLASSROOM
Class 1 Fees based upon cleaning and set -up costs and other costs directly
associated with the event
Class 2 $25 tax per 3 hours per Classroom
Class 3 $30 tax per 3 hours per Classroom
Class 4 $30 tax per 3 hours per Classroom
Regular use of the Classrooms:
The Classrooms will be available for regular meetings. An organization in Fee Class 2 that is a
resident civic or resident non -profit group can reserve one Classroom at no charge for one meeting
per month. Dependent upon space availability, Rosemount Community Center Staff will
coordinate the free meeting space to best accommodate multiple users. An organization can
reserve up to one year in advance of the reservation period, and is charged a $25 reservation fee.
An additional fee may be assessed relating to cleaning and setup costs.
27
RESOLUTION, 008 (Deleted: 2007
Deleted: 116
d. Gymnasium
FEE CLASS
Class 1
Class 2
Class 3
Class 4
f. Arena
Prime Time Ice
Non Prime Time Ice
Summer Ice
FULL GYM FULL DAY
Fees based upon cleaning and set -up costs and other costs directly associated
with the event
$30 tax per hour
$40 tax per hour
$60 tax per hour
The Gymnasium Kitchen may be rented for $50 tax per day.
Banquets or dance events in the Gymnasium will be charged Banquet Room rates.
Groups of 50 or more using the Gymnasium will be charged a custodial fee of $15 per hour of use.
e. Audio Visual Equipment
Easels, paper and markers may be rented for $15 tax per use. (Easels are free of charge if no
paper and markers are requested.) The remaining equipment including the overhead projectors,
slide projector, and TV /VCR's may be rented for $10 tax per use. There is no charge for use of
microphones and lecterns. A portable LCD projector may be rented for $200 tax per use, subject
to availability.
$175 tax per hour (During Prime Season)
$125 tax per hour (During Prime Season\
$125 tax per hour
I Prime jce Season: January Februarjr, March, September, October, November and December
I Summer Ice Season: April, May, June, July and August
I Prime Time Rental Hours: Monday y 7:00 a.m. 10:00 pm
Non -Prime jtental Hours: Monday- _2.m. 7:00 a.m
Dry Floor Events: Fees tax to be negotiated by management staff
Public Skating Fees:
Evening and Holiday Vacation $4.00 tax included
Daytime Public Skating Fee $2.00 tax included
28
$200 tax
$300 tax
$450 tax per day.
RESOLUTION ,20082 Deleted: 2007
l Deleted: 116
Deleted: and Non -Prime
Deleted: Friday
Deleted: and Saturday and Sunday 6:00
a.tn. to 10:00 p.m.
Deleted: Time
Deleted: Friday
Deleted: 7:00 a.m. 10:00 p.m. and
Saturday and Sunday 6:00 a.m. 10:00 p.m.
Daytime Youth Open Hockey
Open Skate Passes
Skate Sharpening
Skate sharpening Passes
Adult Opening Hockey
$2.00 tax included
8 for $20.00 tax included
$4.00
8 for $20.00 tax included
$4.00 tax included
The order of priority for scheduling of ice time to major users +200 hours per year) is as follows:
1. Community Center sponsored programs (Open Skating, Learn to Skate, events, etc.)
2. Rosemount High School Girls and Boys Hockey games and practices, based on limits
mutually agreed upon.
3. Rosemount Area Hockey Association
4. Other hockey associations or organizations requesting 200 or more hours per year.
After the above groups have been .scheduled consecutively, ice time for secondary users (less than 200 hours per
year) will be scheduled on a first come, first served basis.
5. Cancellations: Cancellations will be subject to 50% of the rental fee.
4. Deposits
a. Specific to Banquet Room events, a damage deposit of $300 is required two weeks prior to
the event. As to the Auditorium and Gymnasium, depending on the type of event and group
size, a damage deposit of up to $300 may be added to rental charges. Pending the rental space
does not incur any damages; the deposit will be refunded within 21 days after the event date.
b. Specific to the Auditorium, Banquet Room and Gymnasium, a non refundable rental deposit
of one -half the fee is required within two weeks of permit issue. The renter will forfeit the
reservation if the rental deposit is not received within two weeks after the permit issue date.
The balance of the room fee is due two weeks prior to the event.
c. Specific to the Ice Arena, a non refundable deposit of 50% of the total contract price is
required upon receipt of the Ice Arena contract for use. The remainder of the contract shall be
paid before the group gets on the ice. RAHA and RHS (ISD 196) are exempt from paying a
deposit and will make full payment for the previous month's ice bill.
d. Specific to the Classrooms, the rental fee is required with the signed permit. The reservation
is not confirmed until both the signed permit and the fees are paid.
29
RESOLUTION,2008 Deleted: 2007
Deleted: 116
Formatted: Indent: Left: 0.25"
II. OUTDOOR FACILITIES
A. Park Facility Priority Use
All City of Rosemount Parks and Recreation Activities will be given priority; all facilities will be
scheduled to accommodate these activities. After all Parks and Recreation activities have been
scheduled accordingly, then requests will be granted to other users in order of their priority as listed
below. User Groups 2, 5, 6 and 7 are charged facility fees for tournaments and camps only. Fees
are not charged for regular season play.
1. City Sponsored Events All Parks and Recreation Activities which include, but are not limited
to, adult leagues, tournaments, playground programs, special events, etc.
2. RAAA, Dakota Rev and RAHA
3. Rosemount Non -Profit and Civic /Service Groups
4. Rosemount Residents
5. Rosemount ISD 196 Schools
6. Rosemount Non -Public Schools
7. Rosemount Colleges and Universities
8. All Other Requests
B. Facility Fees
1. Erickson Softball Complex and Tournament Fees:
Athletic Fields (Ball, Soccer)
Field Maintenance
Chalk
Field Dry
2. Park Shelter Fees:
Open Shelter (does not include other
park amenities)
Enclosed Shelter (does not include
other park amenities)
Amphitheater (comes with use of
Central Park Shelter)
$35 tax /field /day
$30 /hour or cost incurred by City
Cost incurred by City
Cost incurred by City
$30 tax /day (Resident)
$50 tax /day (Non- Resident)
$80 tax /day (Resident)
$130 tax /day (Non- Resident)
$150 tax /day (Resident)
$250 tax /day (Non- Resident)
30
RESOLUTION,2008 Deleted: 2007
Deleted: 116
3. Non League Facility Fees:
Fields (Ball, Soccer)
Tennis Court
Hockey Rink
Volleyball Court
4. Camps
5. Independent League Field Fees:
Fields (Ball, Soccer, Outdoor Rinks)
6. Other Fees:
Portable Toilet
Damage Deposit
Lost Key Fee
$35 tax /field /day
$10 tax /court/4 hours
$15 tax /rink /4 hours
$10 tax /court/day
$45 tax /field /day (Resident)*
$55 tax /field /day (Non- Resident)*
Direct Maintenance Fees for camps will be added to rental
fees
$300 tax /team /12 week season
Based upon price quoted by toilet provider
$150 for all events (refundable)
$50 per key
7. Cancellations will be subject to 50% of the rental fee. No refunds for inclement weather
31
RESOLUTION,200$1_ Deleted: 2007
Deleted: 116
III. PARK DEDICATION FEES
A. Park Dedication Fees
Park dedication fees are outlined in City Subdivision Ordinance and City Ordinance No.
XVII.103
and .107 which states:
In all new residential subdivisions, the City shall require that a sufficient portion of such land
be set aside and dedicated to the public for parks, playgrounds or other public use exclusive
of property dedicated for streets and other public ways. It shall be presumed that a sufficient
amount of land has been dedicated for parks and playgrounds for the present and future
residents of the subdivision, if the subdivider dedicates at least 1/25 of an acre per dwelling
unit that can be constructed in the subdivision. The City upon consideration of the particular
type of development proposed in the subdivision may require larger or lesser amounts of land
be dedicated if the City determines that the present and future residents of the subdivision
would require greater or lesser amounts of land for such purposes. The City shall determine
whether cash in lieu of land dedication is more appropriate. The amount of cash dedication
shall be determined by multiplying the number of acres otherwise required to be dedicated by
the average value of comparable undeveloped land set by resolution by the City Council.
In all new commercial and industrial subdivisions, it shall be presumed that a sufficient
amount of land has been dedicated to serve the needs of the resident and working population
if the sub divider dedicates at least ten percent (10 of the land in the subdivision for parks,
recreation and usable open space. The City upon consideration of the particular type of
development proposed in the subdivision may require larger or lesser amounts of land to be
dedicated if it determines that the present and future residents of the subdivision would
require greater or lesser amounts of land for such purposes. The City shall determine
whether cash in lieu of land dedication is appropriate. The amount of cash dedication shall
be determined by multiplying the number of acres otherwise required to be dedicated by the
average value of comparable undeveloped land set by resolution of the City Council.
Land Values for the dedication of land and /or cash contribution:
New residential subdivision $85,000 /acre
Commercial subdivision $90,000 /acre
Industrial subdivision $50,000 /acre
Business Park development $85,000 /acre
32
RESOLUTION,2008i (Deleted: 2007
Deleted: 116