Loading...
HomeMy WebLinkAbout6.f. 2009 Schedule of Rates and FeesAGENDA ITEM: 2009 Schedule of Rates and Fees AGENDA SECTION: Consent PREPARED BY: Amy Domeier, City Clerk Department Directors AGENDA NO. ATTACHMENTS: Draft Resolution APPROVED BY: NO RECOMMENDED ACTION: Motion to Adopt a Resolution Approving Amendments setting the 2009 Schedule of Rates and Fees. 4 ROSEMO UNT CITY COUNCIL City Council Regular Meeting: December 16, 2008 SUMMARY Staff recommends the approval of the above motion. EXECUTIVE SUMMARY ISSUE The fee schedule is updated on a yearly basis upon review of frequent fees established by City departments. The common fees issued by all City departments are included in the fee resolution. Staff and financial consultant, Jessie Hart of Springsted and Associates, have worked together to establish baseline charges that include work sheets of staff time involved for each fee. After review, fees are changed as reflected in the attached resolution. The proposed amendments are noted with editing marks. CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2008 A RESOLUTION APPROVING AMENDMENTS SETTING THE 2009 SCHEDULE OF RATES AND FEES WHEREAS, the City of Rosemount annually conducts a User Fee Study in order to establish logical and defensible fees for the City of Rosemount; and WHEREAS, the City of Rosemount has found certain fees and rates in need of adjustments. THEREFORE, NOW BE IT RESOLVED by the City Council of the City of Rosemount that it adopts the attached Schedule of Rates and Fees for 2009. ADOPTED this 16 day of December, 2008 by the City Council of the City of Rosemount. ATTEST: Amy Domeier, City Clerk William H. Droste, Mayor Motion by: Second by: Vote in favor: Voted against: Member(s) absent: SCHEDULE OF RATES AND FEES FOR2009 Deleted: 2008 Planning and Zoning Review Fees Page 1 Public Works and Engineering Fees Page 3 Administration Fees Page 11 Fire Prevention Permits and Fees Page 13 Police Department Permits and Fees Page 15 Building Permits and Fees Page 16 Building Value Range Fees Exhibit A Page 21 Residential Building Valuations Exhibit B Page 22 Table A -33B Grading Plan Review Fees Exhibit C Page 23 Parks and Recreation Fees Page 24 Community Center and Arena Page 24 Outdoor Facilities Page 30 Park Dedication Fees Page 32 RESOLUTION,2008i Deleted: 2007 Deleted: 116 J PLANNING AND ZONING REVIEW FEES Administrative Appeals Affidavits Certificate of Authenticity Appeal of Planning Commission Decisions to the City Council $250.00 $60.00 $150.00 City Staff Billing For applications that include excessive staff time, services performed by City personnel will be billed at two and one -half (2.5) times the actual payroll hourly rate. Services provided by City consultants will be billed at the current consultant rates. Comprehensive Guide Plan Amendment Application Fee $3,000.00 Conditional Use Permit $1,000.00 Documents 2020 Comprehensive Guide Plan Comprehensive Stormwater Management Plan Zoning Ordinance and Subdivision Ordinance Zoning Map Black and White Color 11" x 17" Color 24" x 36" Environmental Assessment Worksheets Escrow fee for City Consultant Services. Applicant will be responsible for actual costs incurred by the city. Interim Use Permits for Seasonal Sales of Christmas Trees For Periods of Less than 40 Days Per Calendar Year All Other Interim Use Permits Mineral Extraction Permit Application Fee Annual Fee Surety Bond Rental Licensing RESOLUTION ,2008-,_ Deleted: 2007 $31.00 tax $92.00 tax t Same as City wide document fee 45.00 tax $10.00 tax $25.00 tax $1,800.00 $10,000.00 $40.00 $500.00 Joint Applications A planned unit development that includes a subdivision may have the fee waived for a preliminary plat at the discretion of the Community Development Director. $700.00 $370.00 $7,500.00 per acre $25.00 Deleted: 116 Deleted: Actual costs will be billed tax, Deleted: I.00 Planned Unit Development Concept Plan Master Development Plan Final Development Plan Major Amendment Minor Amendment Rezoning $1,200.00 Signs Permanent Installation $270.00 +electrical permit Temporary Signs: For permits obtained after placing the sign For permits obtained prior to placing the sign Site Plan Review $1,200.00 Subdivision Fees Preliminary Plat $2,000.00 the following. Residential $10.00 per unit Commercial /Industrial $50.00 per acre Final Plat $1,200.00 Lot Split $1,400.00 Administrative Plat /Simple Plat $1,120.00 Other Subdivision (waiver of subdivision) $800.00 Lot Combination $400.00 TIF (Tax Increment Financing) Application Fee Parcel in TIF New TIF District Transmission Facilities $1,000.00 Variance Petition Application Fee $200.00 Zoning Ordinance Text Amendment $1,800.00 Fee in Lieu of Tree Dedication $100.00 per caliper inch of tree replacement 2 RESOLUTION ,2008-, Deleted: 2007 Deleted: 116 $2,200.00 +$20 per acre $2,500.00 $2,000.00 $3,000.00 $900.00 $50.00 $10.00 $775.00 $1,750.00 PUBLIC WORKS AND ENGINEERING FEES Assessments: Street Assessments for Total Reconstruction Projects on existing streets are as follows: Single Family /R -1 Zoned Lot With Existing Concrete Curb Gutter $„5.600.00 With Existing Bituminous Curb $6,000.00 With Existing Gravel Road Full Cost of Improvement Rural and Transitional Residential With existing bituminous With existing gravel road 35% of Improvement Cost Full Cost of Improvement Street Assessments for Rehabilitation Projects on existing streets are as follows: All Properties 35% of Improvement Cost Street Assessments for Overlay Projects on existing streets are as follows: All Properties 35% of Improvement Cost 1 City Equipment and Staff Rates: Equipment Per hour charge (does not include operator). Equipment charges, including licensed vehicles and mobile equipment, will be calculated as follows: The true cost of the equipment (including annual depreciation, annual insurance premiums, annual license taxes if applicable, annual operating and maintenance expenses, and an annual carrying fee) will be divided by the estimated hours the equipment is expected to be used annually. Public Works Staff-Per hour charge Staff charges for each employee billed will be calculated using the top hourly pay at the overtime rate plus an additional 20% for FICA, Medicare and PERA expenses. Engineering Fees: Administrative Fees: For Chapter 429 or private improvements project charges shall be calculated at 5% of public improvement construction costs. Services provided by City consultants will be billed at the current rates plus 5 percent administrative costs, unless assessed to benefiting property under a 429 project which then excludes the 5 percent. 3 RESOLUTION 2008 Deleted: 2007 Deleted: 116 Deleted: 5,200.00 Deleted: Special Assessment Search Deleted: $80.00 Miscellaneous Public Works Fees: As- builts /Record Drawings Electronic Copy Hard Copy Feasibility Reports Geographic information Systems Fees (GIS) Single family, town homes or multi family All other Final Plat Simple Lot /Parcel split or boundary change Right -of -Way Fees Charges: Registration Fee 2) Inspection a) Location before work 0.50 X 40 b) Compliance during work 0.50 X 40 c) Completion after work 0.50 X 40 d) Re- inspection 0.50 X 40 3) Mapping a) Review data 0.50 X 50 b) Transfer to Autocad 0.50 X 50 c) Insert to overlay to tie in 0.50 X 50 Total Cost 4 RESOLUTION,2008i Deleted: 2007 $10.00 tax $20.00 tax $23.47 tax $60.00 per lot /unit $120.00 per acre $300.00 Time X Per Cost Involved Ho it (HQ) Administration 0.25 X 40 10.00 Review 0.50 X 40 20.00 Recording 0.25 X 40 10.00 Total Cost 40.00 Registration fee is due annually and is due by January 15 of the corresponding year. Excavation Permit Fees A) Hole Administration 0.50 X 40 20.00 Verification 1) Plan Review 0.50 X 50 25.00 20.00 20.00 20.00 20.00 25.00 25.00 25.00 $200.00 Plus $0.20 per lineal foot for each excavation over 1,000 Deleted: 116 B) Emergency Hole Obstruction Permit Fee Administration Inspection after completion A) Administration B) Recording C) Review 0.50 X 40 20.00 1.50 X 30 45.00 Total Cost $65.00 C) Trench Administration 0.50 X 40 20.00 Verification 1) Plan Review 1.50 X 50 75.00 2) Inspection a) Location before work 0.50 X 40 b) Compliance during work 1.50 X 40 c) Completion after work 1.50 X 40 d) Re- inspection 0.75 X 40 3) Testing Result Review a) Compaction 0.25 X 40 10.00 b) Material 0.25 X 40 10.00 4) Mapping a) Review data 0.50 X 50 25.00 b) Transfer to Autocad 0.50 X 50 25.00 c) Insert to overlay to tie in 0.50 X 50 25.00 Total Cost X60.00 The average trench is 330 lin. ft. past the width of a hole. Therefore, the number of 100 lin. ft. (or portion thereof) units is 4. The cost per 100 lin. ft. unit is 360.00 4 $90.00 /100' unit. Minimum Base Coat 5 feet 20.00 60.00 60.00 30.00 0.50 X 40 20.00 0.25 X 40 10.00 0.75 X 50 37.50 RESOLUTION ,2008 Deleted: 2007 Deleted 116 57.50 Delay Penalty Plus additional fee based on length Inspection 1) Compliance during work 1.50 X 40 60.00 2) Completion after 0.25 X 40 10.00 Additional fee on assumed 1000 lin. ft. permit 52.50 Additional cost per lineal foot $70.00 1000 0.07 A) Administration 1.5 X 40 60.00 For up to 3 days of non completion and non -prior notice before specified completion date. After 3 days, an additional charge of $20 /day will be levied. Total Penalty Charge 60.00 (Up to 3 days late) Each day late over 3 days Right of Way /Utility Easement Vacation Fee Sidewalk/Trail Snow Removal Street Excavation and Curb Cuts Curb Cuts, Driveway Access Permits, Transit Stop Kiosks Street Excavation Minimum bond deposit with City Street Utility Specifications Weed Inspection Wetland Notification /Application Form (DepositforCostt Incurred) Solid Waste Hauling License $320.00 Water Sanitary Sewer, Storm Water Usage Rates: Water and Sanitary Sewer User Fees Usage —Based on Quarterly Meter Readings Water Use Water Fixed Charge Sanitary Sewer Use Sanitary Sewer Fixed Charge 6 RESOLUTION ,20081 Deleted: 2007 Deleted: 116 $60.0O Plus 2,0.00 /Day $775.00 $225.00 per lot $180.00 $2,000.00 $23.47 tax $580.00 $3,175.00 $1.02 /1000 gallons $8.90 each account $1.40 /1000 gallons $20.00 each account Water Surcharge and Meter Maintenance Per Chart Below (Quarterly) Meter Size Surcharge Meter Maintenance Single Family 5/8" 8.80 0 Multi Family 5/8" 6.80 0 1" 13.50 6.25 1 /z" 28.00 11.25 2" 31.50 18.15 2 39.35 22.20 3" 47.00 26.25 4" 70.00 45.00 6" $154.00 $100.00 8" $170.00 $130.00 *Commercial, Industrial or Institutional /Commercial and Industrial are taxable *Meter maintenance applied to Base Fixed Water Charge based on meter size. Sewer Only Users Bulk Water Irrigation Meters: Exempt from Sanitary Sewer Usage charges. Water charge by meter size and Surcharge by meter size. Miscellaneous Utility Charges: Meter Disconnection Charge $80.00 Meter Reconnection Charge $80.00 RESOLUTION 008 -f Deleted: 2007 $40.00 per quarter per SAC unit $2.00 per 800 gallons tax Pays Water Usage charge, Fixed Deleted: 116 QUARTERLY STORM WATER UTILITY FEES Storm Fee Land Use Land Use Description Unit Fee Category 1 Single family residential, R -1,2, RL, Multi -unit Residential 1.82 -f Deleted: 11.26 residential with individual water meters, R -3,4, Unit Platted /undeveloped, Minimum charge for all parcels 2 Rural residential, Agricultural, RR, AG Lot $,12.45 Deleted: 11.26 3 Parks, Golf Courses, Cemeteries, PK Acre x.53* Deleted: z.a1 4 Undeveloped /un- platted Acre $.15* 5 Multi -unit residential without individual water Acre X43.92* -f Deleted: 41.82 meters, Apartments, Churches, Schools, Hospitals, Government Buildings, Mobile Home Parks 6 Commercial, Industrial and Parking Lots, C- Acre $,54.78 1,2,3,4,IP,IG,PL,WM *Categories 3,4,5, 6 are subject to the minimum charge of $J1.82. The largest of either the minimum or application of the above rates will be used for the fee. Deleted: 52.17 Deleted: 10.72 Manual Meter Read $50.00 Monthly New Customer List Hard Copy $10.00 tax Electronic Copy (Must be pre -paid) (Annual Fee Jan. Dec. Fee $50.00 will be pro -rated for partial calendar year, by month) Total Customer List 100 copies of black and white letter or legal sized copies; or More than 100 pages and 15 minutes or longer of staff time Utility Billing Search /Resident Utility Billing Search/Non- Resident RESOLUTION,20081_ Deleted: $.25 /page tax Actual costs will be billed tax No Charge No Charge Water Meter Accuracy Check Testing 5/8" 2# meters $125.00 Testing 3" meters $125.00 Testing 4" meters $125.00 Testing 6" meters $125.00 Water Meter Installation Charges: Water meter charges are the actual cost of meter and appurtenant parts, plus shipping and handling. Charges are subject to change during the year. See the most recent Cost of Water Meter schedule. Water, Sanitary Sewer and Storm Water Capital Charges: Metropolitan Council Environmental Services Availability Charge (Metro SAC) Per Sac Unit, as determined by the MCES $t2 000.00 City Sanitary Sewer Availability Charges CITY SANITARY SEWER Trunk Area Assessments Per SAC Unit as determined by CHARGES collected with final the MCES and collected with the plat/subdivision Building Permit agreement Single Family Residential Multi Family Residential $1,075.00 per acre $1,200.00 Institutional, Commercial and Industrial Any part of the Trunk Area Assessment that is not collected with a plat /subdivision agreement will be collected as a connection charge, in addition to any other connection charge established by this resolution, prior to connection to the sanitary sewer system City Water Availability Charges Trunk area assessments collected with final plat /subdivision agreement as follows: Deleted: 116 Deleted: 1,825.00 All Zoning types $,5.800.00 per acre Deleted: 4,860.00 Any part of the Trunk Area Assessment that is not collected with a plat /subdivision agreement will be collected as a connection charge, in addition to any other connection charge established by this resolution. And Water Access Charge collected with the Building Permit as follows: Single Family Res $,1.970.00 Multi- Family Res $,1.970.00 Meter $,8.920.00 1 1 /2" Meter $,13,375.00 2" Meter 417.835.00 2 1 /2" Meter $,22,300.00 Meter $,26.770.00 4" Meter 16,3122.11L0 6" Meter $,35,685.00 8" Meter 140.00 1" 3" Supplemental Water and Sanitary Sewer Connection Charges In addition to other charges imposed at the time of connection to water and sanitary sewer systems, supplemental connection charges, set by reference to the portion of the cost of connection that has been paid by the premises being connected, in comparison with other premises, will be imposed and collected from the properties, and in the amounts, listed below, for each connection made: 1 PID Address X009 Supplemental X009 Supplemental Sewer Deleted: 2008 340201001006 1 340201001009 344430001001 344430001002 344430002001 344430002002 344430003001 344430003002 344430004001 344430004002 344430005001 344430006001 344430007001 344430008001 344430009001 344430000001 Such supplemental 1, 2007, by three an Water Connection Connection Charges Deleted: 2008 Charges 2771 -132' St. W. Certified Certified 2813 132"' St. W. 4 7. 7 V.654.46 173 CR 42 (2693 Paid in Full Paid in Full 132 Ct W.) 2694 132"' Ct. W Paid in Full Paid in Full 2685 —132"' Ct. W ,$4.767.49 Paid in Full 2684 —132'" Ct. W Paid in Full Paid in Full 2675 132"' Ct. W X4.767.42 x $5.654.46 2686 —132' Ct. W Paid in Full Paid in Full 2665 132' d Ct. W X64.767.49 x $5,654.46 2604 —132' Ct. W Paid in Full Paid in Full 2655 —132"' Ct. W )4.767.49 %5.654.46 2645 132"' Ct. W x $4.767.49 x $5,654.46 2055 —128'' St. W x $4.767.49 )5.654.46 (2635132"' Ct W) 2625 —132"' Ct. W Paid in Full 2615 —132' Ct. W Paid in Full 2605 —132"' Ct. W Paid in Full connection charges shall be increased each calendar year commencing January d one -half percent (3.5 from the charges of the preceding year. RESOLUTION 2008 Deleted: 2007 Paid in Full Paid in Full Paid in Full Deleted: 116 Deleted: 1,630.00 Deleted: 1,630.00 Deleted: 7,370.00 Deleted: 11,055.00 Deleted: 14,740.00 Deleted: 18,425.00 Deleted: 22,120.00 Deleted: 25,800.00 Deleted: 29 ,500.00 Deleted: 33,175.00 Deleted: 4,606.27 Deleted: 5,463.25 Deleted: ;4,606.27 Deleted: ;4,606.27 Deleted: ;5,463.25 Deleted: ;4,606.27 Deleted: ;5,463.25 Deleted: $4,606.27 Deleted: ;5,463.25 Deleted: $4,606.27 Deleted: $5,463.25 Deleted: ;4,606.27 Deleted: $5,463.25 Storm Water Charges a. For this charge, Newly Developed Properties are defined as any property, including platted or un- platted parcels, which are improved with buildings, grading, or otherwise creating an impervious surface. In addition to the following charges, stormwater ponding fees /credits will be determined at the time of final platting or building permit application. Connection Charges (STAAC) collected with the Building Permit on all Newly Developed properties $745 per lot $280 per housing unit (4 plex 4 units) $2,200 per acre $2,200 per acre *Acres are defined as gross acres of developable property minus pond acreage (at high water level) and wetlands at delineation line, rounded to the nearest one tenth (1/10' of an acre. STORMWATER CHARGES Single Family Multiple Family Public /Institutional Commercial and Industrial Trunk Area Assessments to be collected from Developers on all newly developed properties $6,665 per acre* Any part of the Trunk Area Assessment that is not collected with a plat /subdivision agreement will be collected as a connection charge, in addition to any other connection charge established by this resolution, prior to issuance of a Certificate of Occupancy for use of any property. Connection Charges (STAC) Collected with the Building Permit on all newly developed properties that have not paid trunk area assessments listed above (Gross Area): Single Family $2,960.00 per lot Multiple Family $8,320.00 per acre Public /Institutional $8,885.00 per acre Commercial $8,265.00 per acre Industrial $8,265.00 per acre Water Tower Antennas Application Fee $2,500.00 Per year rent payments based on 9" panel Type or 3 A whip type antennas and appropriate outside equipment area will be charged at the current yearly rate, which is adjusted annually. Minimum per year lease payment increase 5% 10 RESOLUTION ,2008- Deleted: 2007 Deleted: 116 ADMINISTRATION FEES Adult Use Establishment License $3,000.00 Check Return Charge $30.00 Videotapes Audiotapes Documents The following fees for copies apply to all departments. 100 copies of black and white letter or legal sized copies: or More than 100 pages and 15 minutes or longer of staff time; or Document that is outsourced Large Public Gathering on City Parkland Liquor Licenses: On-Sale Intoxicating Class A (Jan 1 -Dec 31) Class B (Jan 1 -Dec 31) On-Sale Wine Off-Sale Intoxicating On-Sale 3.2% Malt (July 1-June 30) Off-Sale 3.2% Malt (July 1-June 30) 11 $5.00 $5.00 $.25 /page tax $.30 /page tax (for color) Actual costs will be billed tax Actual costs will be billed tax Faxed copies are $.50 per page plus tax. If more than 100 pages or if long distance charges apply, actual costs plus tax will be billed to the requester. Mailed copies are charged the applicable document rate and all handling costs plus tax. $150.00 $4,500.00 $3,000.00 $550.00 $200.00 $250.00 $210.00 RESOLUTION ,2008-, Deleted: 2007 Deleted: 116 Deleted: Copies Deleted: City Council, Port Authority, Planing Commission, Parks Recreation or Utilities Commission Agendas (mailed) Deleted: $.25 /page handling tax Deleted: City Council Port Authority, Planning Commission, Parks Recreation or Utilities Commission Minutes (maled)1 *no charge to Rosemount re id er& Deleted: $.25 /page handling tax Deleted: The above items are availabk at no charge to residents ttdocuments an requested on an individual basis. Temporary On -Sale Intoxicating $170.00 /event Temporary On -Sale 3.2% Malt $150 /event Special Club On -Sale Intoxicating (Jan 1 -Dec 31) Membership: under 200 $300.00 between 201 and 500 $500.00 between 501 and 1,000 $650.00 between 1,001 and 2,000 $800.00 between 2,001 and 4,000 $1,000.00 between 4,001 and 6,000 $2,000.00 more than 6,001 $3,000.00 Special Sunday Gan 1 -Dec 31) $250.00 Bottle Club $140.00 One -day Bottle Club $25.00 On Public Premise Annual License $350.00 Gan 1 -Dec 31) Per event $30.00 Amending an Existing Liquor License $175.00 Massage Therapist License Gan 1 -Dec 31) $90.00 Peddlers, Solicitors and Transient Merchants $90.00 Gan 1 -Dec 31) Gambling Permits $250.00 RESOLUTION 0_308-, Deleted: 2007 Deleted: 116 Alarm System Permit/Review As recommended by Exhibit A Minimum fee Large Minimum fee Small Burning Permit Commercial Day Care Inspection Fire Dept. Certificate of Occupancy Inspection/Renewal Fee Copies of Fire Dept. Officers Report Fire Dept. Re- inspection Fee Fire Dept. Special and Miscellaneous Inspections Fire Photo (per copy) I Fire Video Tape Fire Sprinkler Protection System State Surcharge: Copies of Fire Dept. Report I Fuel Tank Installation or Removal: Haunted House Operation Permit Penalty for Failing to Obtain Permit FIRE PREVENTION PERMITS AND FEES 13 Surcharge $125.00 Surcharge $235.00 $50.00 $965.00 fee $47.00 $130.00 100.00 $880.00 RESOLUTION,2008i Deleted: 2007 d tame as Citywide document fee -5.00 -5.00 As recommended by Exhibit A. As recommended by the Minnesota State Code Section 16B.70 Penalty for failing to obtain a permit prior to starting work required is two times the regular permit fee established herein. Deleted: 116 —f Deleted: 225.00 Deleted: 100.00 Deleted: $.25 /page tax -f Deleted: $.25 /page tax Deleted: Actual cost of reproduction and handling. (Handling charge will be taxed.) Deleted: Actual cost of reproduction and handling. (Handling charge will be taxed) Deleted: As recommended by Exhibit A. Plan Check Fees: Commercial /Industrial /Multi- family buildings and structures Residential buildings Residential Accessory Structures/additions alterations/repairs /remodeling Pyrotechnic Display of Fireworks Fireworks Sales State Surcharge Storage and use of Hazardous Materials Over quantities listed in current Fire Code Edition Section 4. Permit valid for twelve months maximum Temporary Use of LP Gas $100.00 14 Sixty -five percent (65 of the building permit fee. Sixty -five percent (65 of the building permit fee for the new single family dwellings. Sixty -five percent (65 of the building permit fee. $200.00 $350.00 As recommended by the Minnesota State Code Section 16B.70. 50.00 RESOLUTION ,2008- Deleted: 2007 Deleted: 116 Deleted: 615.00 POLICE DEPARTMENT PERMIT AND FEES Alarm User Permit $160.00 Animal Impound First impound in 12 month period (same $30.00 animal) All impounds beyond first in 12 month period $50.00 Animal Licenses Registration Fees Annual fee for spayed and neutered $6.00 animals Annual fee for unsprayed and un- neutered $12.00 Duplicate Tags $5.00 Applicants 62 years of age or older shallpay fifty percent (S0%) of above stated fees Analog Audio Tape Copies Background checks Contractual Overtime Dangerous Dog Registration State authorked Pawn Shop License Fee: 0 -20 pawns a day 21 -40 pawns a day 41 and over pawns a day Initial application includes ,I' 1,500.00 deposit for investigation fee Photographs: Traditional copy of photos Color copy of photo Digital copies of photos Copies of Police report Video Copies Traditional or Digital Tattoo Body Piercing Establishments Annual Business License Annual Personal Service License 15 $5.00 $18.78 tax ($20.00) $48.00 per hour $300.00 $1,500.00 yr $3,000.00 yr $5,000.00 yr as set in City Code $10.00 per roll tax $.50 /page tax $.25 /page tax $.25 /page tax $5.00 $250.00 $100.00 RESOLUTION0008 Deleted: 2007 Deleted: 116 3 Pigeons Loft and Fowl Coop $25.00 4- Formatted: Indent Left: o^ Building Permits As recommended by Value Range Exhibit A. As -built Survey Escrow Fee $2,000.00 Certificate of Occupancy Inspection and /or 105210 change of use Administrative Handling Fee BUILDING PERMITS AND FEES Building Department Reports $160.00 /year tax $12.50 /month tax 2. Administrative fee for each permit $10.00 0 to 100 ampere capacity 101 to and including 200 ampere capacity For each additional 100 ampere capacity or fraction thereof 16 RESOLUTION,2008i Deleted: 2007 Deleted: 116 A handling fee of $25.00 will be charged for address and lot changes and for permit and file editing. These changes must be done within thirty (30) days of permit issuance or all prior permit fees will be forfeited (non refundable). Electrical Permits 1. Minimum fee for each separate inspection of an $4 .MX! Deleted: 35.00 installation, replacement, alteration or repair limited to one inspection only. 3. Services, changes or service, temporary services, additions, alterations or repairs on either primary or secondary services shall be computed separately. $20.00 $25.00 $8.00 Deleted: 50.00 4. Circuit, installation of, additions, alterations or repairs of each circuit or sub feeder shall be computed separately, including circuits fed from sub feeders and including the equipment served except as provided for in Items 4 through 9. 0 to and including 30 ampere capacity (maximum number of 1 -30 ampere circuits to be paid on is 30 to any one cabinet) 31 to and including 100 ampere capacity For each additional 100 ampere capacity or fraction thereof 17 $7.00 $8.00 $5.00 In addition to the above fees: A charge of $4.00 will be made for each street lighting standard. A charge of $5.00 will be made for each traffic signal standard. Circuits originating within the standard will not be used when computing fees. In addition to the above fees: All transformers and generators for light, heat and power will be computed separately at $5.00 per unit plus $.25 per KVA up to and including 100 KVA.101 KVA and over will be computed at $.20 per KVA All Transformers for signs and outline lighting shall be computed at $4.00 for the first 500 VA or fraction thereof per unit plus $40.00 for each additional 100 VA or fraction thereof. In addition to the above fees (unless included in the fee filed by the initial installer): Remote control, signal circuits and circuits of less than 50 volts shall be computed at $6.00 pr each ten (10) openings or devices of each system plus $.50 for each additional opening. For review of plans and specifications of proposed installations there shall be a minimum fee of $100.00 up to and including $30,000.00 of electrical estimate, plus 1/10 of one percent (1 on any amount in excess of $30,000.00 to be paid by persons or firms requesting review. When re- inspection is necessary to determine whether unsafe conditions have been corrected and such conditions are not subject to an appeal pending before any court, a re- inspection fee of $35.00 may be assessed in writing by the inspector. For inspections not covered herein, or for requested special inspections or services, the fee of $50.00 per man hour, including travel time, plus the standard IRS allowed mileage reimbursement per mile traveled, plus the reasonable cost of equipment or material consumed. This section is also applicable to inspection of empty conduits and such jobs as determined by the City. For inspection of transient projects including, but not limited to carnivals and circuses the inspection fees shall be computed as follows: RESOLUTION ,2008-, Deleted: 2007 J Deleted: 116 Power supply units according to item 2 of the fee schedule. A like fee will be required on power supply units at each engagement during the season, except that a fee of $50.00 will be charged for additional time spent by the inspector if the power supply is not ready for inspection at the time and date specified on the Request for Inspection as required by law. Rides, devices or concessions shall be inspected at their first appearance of the season and the inspection fee shall be $35.00 per unit. Fees for services, feeders and circuits operating at over 250 volts shall be doubled those listed in items 3 and 4 above. A $.50 State surcharge is to be added to each permit. Grading Permits: All fees are established in Exhibit D Plan review fees are found in Exhibit D State surcharge fee of $.50 Bond Required $3,000.00 per disturbed acre: minimum one acre Plan Check Fees: Commercial/Industrial/Multi- family building and structures Residential buildings Residential Accessory Structures Plumbing, Heating, Ventilating, Air conditioning Refrigeration Fees: Residential (4 or less units) New Construction Alteration /repair Multiple Housing (5 or more units) New Construction Alteration /repair 18 RESOLUTION ,2008-, t Deleted: 2007 1 Deleted: 116 Sixty five percent (65 of the building permit fee. Sixty-five percent (65 of the building permit fee for new single family dwellings /single family additions, alterations, etc., similar plans per state statute 1300.0160 twenty -five percent (25 of the building permit fee. Additions /alterations /repairs /remodeling: sixty-five percent (65 of the building permit fee. $125.00 $70.00 $100.00 /unit $70.00 /unit Commercial /Industrial /Institutional New Construction: Commercial /Industrial /Institutional /Public: Set fee of $75.00 for project valued under $3,500.00 which requires one inspection. Set fee of $125.00 for project valued under $3,500.00 which requires two inspections. For projects valued over $3,500.00, 1.5% of the value of the project, with a minimum fee of $215.00. Plus $.0005 (valuation) surcharge for all projects. Sewer and Water Installation Permit Fees: Municipal Service residential (4 or less units) $55.00 Municipal Service commercial /industrial /institutional Municipal Service commercial /industrial /institutional 1.5% of valuation plus $.0005 surcharge. $105.00 minimum fee plus $,0005 Surcharge. Private Sewer all classifications New construction or reconstruction Dakota County Recording Fee Septic System Maintenance /Operation Permits and Fees: Residential Maintenance Permit Commercial, Industrial, Public or Institutional Operational Permit Late renewal fee for maintenance or operational permits Special Individual Sewage Treatment System (I.S.T.S.) Inspections or Investigations State Surcharge: State surcharge added to each permit 19 1.5% of valuation plus $.0005 surcharge $215.00 minimum fee plus $.0005 surcharge 1.5% of valuation plus $.0005 surcharge. $105.00 minimum fee plus $,0005 Surcharge $250.00 50.00 $300.00 No fee $40.00 $25.00 $100.00 RESOLUTION,2008 Deleted: 2007 As recommended by the Minnesota State Code Section 16B.70. Set fee of $.50 per permit permit based on value is $.0005* value of job Deleted: 116 MISCELLANEOUS BUILDING FEES Decks Demolition Permit Fences Fireplaces Manufactured Homes Inclusive of all inspections and connections Moving Permit Moving Permit Out Moving Permit In Penalty for failing to obtain a permit prior to starting work requiring a permit: Re- inspection Roofing, Re- Roofing Residential Residential —Tear off, Re -roof, and Overlay Commercial/Institutional/Industrial Siding Residential Re- siding Commercial /Institutional /Industrial Satellite Dishes and Antennas Residential: All other antennas and satellite dishes Single Family Dwelling Basement Finish Slabs Residential Residential /Multi -F. y Slabs /Patios Commercial /Institutional /Industrial Special and Miscellaneous Inspections Swimming Pools Temporary Construction Trailer Water Softener Installation Window Replacement 20 $100.00 85.00 $75.00 $100.00 $100.00 $180.00 $175.00 2 times the regular permit fee as established herein $50.00 $75.00 As recommended by Exhibit A Plus $.0005 surcharge. Minimum fee of $100.00 +$.0005 surcharge $75.00 As recommended by Exhibit A -plus $.0005 surcharge. Minimum fee $84.00 plus $.0005 surcharge. No fee Per Exhibit A Plus $.0005 surcharge. Minimum fee $84.00 plus $.0005 surcharge $175.00 $50.00 70.00 $70.00 $75.00 ,150.00 $65.00 0.00, $46.00 RESOLUTION ,2008 Deleted: 2007 Deleted: 116 Deleted: 130.00 Deleted: 15.00 Deleted: (State mandated E«, maximum) Sample Fee Schedule 2004 EXHIBIT A Building Value Range Fee Schedule Building Value Range Fee Range $0 $500.00 $500.01 $2,000 $2,000.01 425,000 $25,000.01 $50,000 $50,000.01 $100,000 $100,000.01 $500,000 $500,000.01 $1,000,000 $1,000,000.01 and up $25.00 $25.00 for the first $500 $3.25 per additional $100 $73.50 for the first $2,000 $14.75 per additional $1,000 $413.00 for the first $25,000 $10.75 per additional $1,000 $681.75 for the first $50,000 $7.50 per additional $1,000 $1,056.75 for the first $100,000 $6.00 per additional $1,000 $3,456.75 or the first $500,000 $5.00 per additional $1,000 $5,956.75 for the first $1,000,000 $4.00 per additional $1,000 *Chanties per LMC report of 11/3/03 This fee schedule was developed cooperatively by members of the League of Minnesota Cities and the Association of Metropolitan Municipalities, with information provided by the State Building Codes and Standards Division. 21 RESOLUTION ,2008 Deleted: 2007 RESOLUTION ,2008 Deleted: 2007 Deleted: 116 EXHIBIT B RESIDENTIAL BUILDING VALUATIONS* Cost Per Square Foot By reference the City adopts the most recently approved valuation table approved by the Formatted: Left Minnesota Department of Industry and Labor. Formatted: Font Garamond, 12 pt, SINGLE FAMILY DWELLINGS -TYPE V- WOOD FRAME Not Bold First Floor Deleted: $79.78 Second Floor Deleted: $79.78 SINGLE FAMILY DWELLINGS BASEMENT Finished Basements Unfinished Basements Crawl Space Conversion Un- excavated Foundation Areas GARAGES: Wood Frame Masonry Construction Carport Pole Building DECKS, WOOD FRAMED, ENTRY PORCH FOUR SEASON PORCHES THREE SEASON PORCHES, WOOD FRAMED GAZEBOS, WOOD FRAMED /SCREENED ZERO CLEARANCE FIREPLACES MASONRY FIREPLACES: One Level Each Additional Level SINGLE FAMILY DWELLING MECHANICAL INSTALLATION VALUES: Plumbing (Up to 2 Full Baths —1 Half Bath Basement R.I. Only) Plumbing, Each Additional Bathroom HVAC (No Air conditioning, One Furnace) HVAC, Air Conditioning HVAC, Each Additional Furnace City Sewer /Water Installation Septic Systems(s): Standard Trench /Drain field Mound System Tanks /Pumped up /Drain field c 22 —1 Deleted: $15.90 Deleted: $8.16 Deleted: $5.54 Deleted: $4.09 Deleted: $2131 Deleted: $33.68 -1 Deleted: $35.16 -1 Deleted: $16.35 Deleted: $16.25 4 Deleted: $5,900.00 Deleted: $3,000.00 J J Deleted: $8,000.00 ,1 Deleted: $1,000.00 Deleted: $5,000.00 Deleted: $4,000.00 Deleted: $11,000.00 Deleted: 6,000.00 Deleted: *Permit fees are J automatically revised in May to reflect J the new schedule of Building Vahradon Data issued by the Minnesota Deparunent of Administration. 1 EXHIBIT "C" TABLE A -33 -A- GRADING PLAN REVIEW FEES 50 cubic yards (38.2m or less No fee 50 cubic yards (38.2m or less $23.50 101 to 1,000 cubic yards (77.2m to 764.6m $37.00 1,001 to 10,000 cubic yards (765.3m to 7645.5m $49.25 10,001 to 100,000 cubic yards (7646.3m to 76,455m $49.25 for the first 10,000 cubic yards (7645.5m plus $24.50 for each additional 10,000 yards (7645.5m or fraction thereof. 100,001 to 200,000 cubic yards (76 456m to 152 911m $269.75 for the first 100,000 cubic yards (76 455m plus $13.25 for each additional 10,000 cubic yards (7645.5m or fraction thereof. 200,001 cubic yards (152 912m or more $402.25 for the first 200,000 cubic yards (152 911m plus $7.25 for each additional 10,000 cubic yards (7645.5m or fraction thereof. Other Fees: Additional plan review required by changes, additions or revisions to approved plans (minimum charge is one -half hour) $50.50 per hour* TABLE A 33 B GRADING PERMIT FEES 50 cubic yards (38.2m or less $23.50 51 to 100 cubic yards (40m to 76.5m $37.00 101 to 1,000 cubic yards (77.2m to 764.6m $37.00 for the first 100 cubic yards (76.5m plus $17.50 for each additional 100 cubic yards (76.5m or fraction thereof 1,001 to 10,000 cubic yards (765.3m to 7645.5m $194.50 for the first 1,000 cubic yards (764.6m plus $14.50 for each additional 1,000 cubic yards (764.6m or fraction thereof. 10,001 to 100,000 cubic yards (7646.3m to 76,455m $325.00 for the first 10,000 cubic yards (7645.5m plus $66.00 for each additional 10,000 cubic yards (7645.5m or fraction thereof. 100,001 cubic yards (76 456m or more $919.00 for the first 100,000 cubic yards (76 455m plus $36.50 for each additional 10,000 cubic yards (7645.5m or fraction thereof. Other Inspections and Fees: 1. Inspections outside of normal business hours (minimum charge two hours) z Re- inspection fees assessed under provisions of Section 108.8 3. Inspections for which no fee is specifically indicated (minimum charge one half hour) $50.50 per hr $50.50 per hr $50.50 per hr *Or the total hourly cost to the jurisdiction, whichever is the greatest This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. 1 The fee for a grading permit authorizing additional work to that under a valid permit shall be the difference between the fee paid for the original permit and the fee shown for the entire project 2 Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall indude supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. 23 RESOLUTION ,2008 Deleted: 2007 Deleted: 116 PARKS AND RECREATION FEES I. COMMUNITY CENTER, ARENA, AND FACILITIES A. Definitions 1. City Groups. Organizations. or Activities (City sponsored activities.) Includes Rosemount Halloween Festivity, Leprechaun Days, and Shamrock Awards Banquet. 2. Civic and Non -Profit Groups Includes civic organizations, political groups, churches, athletic associations, fraternal groups, charitable groups, and character building organizations devoted to social, educational, recreational and civic development or other like purposes. 3. Commercial Groups Includes groups that operate for profit or the purpose of promotion or advertisement. 4. Governmental Agencies Includes county, state, federal, and special tax districts serving Rosemount residents. 5. Non Resident Groups Includes groups having more than one -half of their members mt living within the Rosemount City limits. 6. Resident Any person who maintains a residential address in the City of Rosemount. 7. Resident Groups Includes groups having more than one -half of their members living within the Rosemount City limits. 8. School District #196 Includes all directly related school activities including curricular, co- curricular, extra curricular and all directly controlled school organizations; including Community Education. 9. Resident Athletic Groups Includes RAAA and RAHA. 24 RESOLUTION„2008i Deleted: 2007 Deleted: 116 B. Priority for Scheduling Facilities 1. Purpose Due to the large number of organizations that request Community Center facilities, the City Council has deemed it necessary to group by activity these organizations and establish a priority in order to insure that Community Center facilities are made available so as to best meet community needs. 2. Priority of Users a. Rosemount Parks and Recreation programs b. Community events c. National Guard d. All others 3. Permits and Rental Agreements Uses may be determined by permit, contract or rental agreement on such terms as mutually agreed upon. C. Facility Fees 1. Purpose The City Council establishes the following user classifications for the purpose of setting fees. Specific fee charges are dependent on the purpose of the activities, type of group, facility that is requested and special services and /or equipment needed, with consideration to the market place and such other factors as may be deemed relevant. A fee schedule will be established by the City Council after review and recommendation of the Parks and Recreation Commission. The fee schedule will be reviewed as necessary but not less than annually by the Parks and Recreation Commission. Under supervision of the Parks and Recreation Director, the management staff at the Community Center would have the ability to negotiate for last minute rentals, long term rentals, and special events in order to maximize use -of the Community Centex. Staff would provide quarterly exception reports. 2. Fee Class of Users a. City sponsored activities b. Residents, resident civic, resident non -profit groups, ISD 196 schools, and other Rosemount schools c. Non residents, non resident civic, non resident non -profit groups, and other governmental agencies d. Commercial groups 25 RESOLUTION ,20081 Deleted: 2007 Deleted: 116 3. Fees a. Auditorium Auditorium alone:* FEE CLASS HOURLY RATE 8 HOURS OR MORE Class 1 Fees based upon cleaning and set -up costs and other costs directly associated with the event Class 2 $50 tax per hour $350 tax Class 3 $55 tax per hour $400 tax Class 4 $75 tax per hour $550 tax Auditorium with the Banquet Room and adjoining Lobby:* (all day fee) FEE CLASS SATURDAY FEE FRIDAY FEE WEEKDAY FEE (Sun- Thurs)"` Class 1 $700 Fees based upon cleaning and set -up costs and other costs directly associated with the event. RESOLUTION ,2008 Deleted: 2007 Class 2 $800 tax $700 tax $400 tax Class 3 $950 tax $850 tax $600 tax Class 4 $1,200 tax $1,100 tax $800 tax A fee tax will be assessed if using audio visual equipment other than microphones and standard lighting. (see 3 e. for Audio Visual Equipment fees) Add $100 tax for Sunday Thursday rentals scheduled past 10:00 p.m., no later than midnight. 26 Deleted: 116 b. Banquet Room FEE CLASS SATURDAY FEE FRIDAY FEE WEEKDAY FEE (Sun- Thurs) Class 1 $550 tax Fees based upon cleaning and set -up costs and other costs directly associated with the event. Class 2 $650 tax $550 tax $300 tax Class 3 $750 tax $650 tax $350 tax Class 4 $850 tax $750 tax $400 tax Add $100 tax for Sunday Thursday rentals scheduled past 10:00 p.m., no later than midnight c. Classrooms FEE CLASS PER CLASSROOM Class 1 Fees based upon cleaning and set -up costs and other costs directly associated with the event Class 2 $25 tax per 3 hours per Classroom Class 3 $30 tax per 3 hours per Classroom Class 4 $30 tax per 3 hours per Classroom Regular use of the Classrooms: The Classrooms will be available for regular meetings. An organization in Fee Class 2 that is a resident civic or resident non -profit group can reserve one Classroom at no charge for one meeting per month. Dependent upon space availability, Rosemount Community Center Staff will coordinate the free meeting space to best accommodate multiple users. An organization can reserve up to one year in advance of the reservation period, and is charged a $25 reservation fee. An additional fee may be assessed relating to cleaning and setup costs. 27 RESOLUTION, 008 (Deleted: 2007 Deleted: 116 d. Gymnasium FEE CLASS Class 1 Class 2 Class 3 Class 4 f. Arena Prime Time Ice Non Prime Time Ice Summer Ice FULL GYM FULL DAY Fees based upon cleaning and set -up costs and other costs directly associated with the event $30 tax per hour $40 tax per hour $60 tax per hour The Gymnasium Kitchen may be rented for $50 tax per day. Banquets or dance events in the Gymnasium will be charged Banquet Room rates. Groups of 50 or more using the Gymnasium will be charged a custodial fee of $15 per hour of use. e. Audio Visual Equipment Easels, paper and markers may be rented for $15 tax per use. (Easels are free of charge if no paper and markers are requested.) The remaining equipment including the overhead projectors, slide projector, and TV /VCR's may be rented for $10 tax per use. There is no charge for use of microphones and lecterns. A portable LCD projector may be rented for $200 tax per use, subject to availability. $175 tax per hour (During Prime Season) $125 tax per hour (During Prime Season\ $125 tax per hour I Prime jce Season: January Februarjr, March, September, October, November and December I Summer Ice Season: April, May, June, July and August I Prime Time Rental Hours: Monday y 7:00 a.m. 10:00 pm Non -Prime jtental Hours: Monday- _2.m. 7:00 a.m Dry Floor Events: Fees tax to be negotiated by management staff Public Skating Fees: Evening and Holiday Vacation $4.00 tax included Daytime Public Skating Fee $2.00 tax included 28 $200 tax $300 tax $450 tax per day. RESOLUTION ,20082 Deleted: 2007 l Deleted: 116 Deleted: and Non -Prime Deleted: Friday Deleted: and Saturday and Sunday 6:00 a.tn. to 10:00 p.m. Deleted: Time Deleted: Friday Deleted: 7:00 a.m. 10:00 p.m. and Saturday and Sunday 6:00 a.m. 10:00 p.m. Daytime Youth Open Hockey Open Skate Passes Skate Sharpening Skate sharpening Passes Adult Opening Hockey $2.00 tax included 8 for $20.00 tax included $4.00 8 for $20.00 tax included $4.00 tax included The order of priority for scheduling of ice time to major users +200 hours per year) is as follows: 1. Community Center sponsored programs (Open Skating, Learn to Skate, events, etc.) 2. Rosemount High School Girls and Boys Hockey games and practices, based on limits mutually agreed upon. 3. Rosemount Area Hockey Association 4. Other hockey associations or organizations requesting 200 or more hours per year. After the above groups have been .scheduled consecutively, ice time for secondary users (less than 200 hours per year) will be scheduled on a first come, first served basis. 5. Cancellations: Cancellations will be subject to 50% of the rental fee. 4. Deposits a. Specific to Banquet Room events, a damage deposit of $300 is required two weeks prior to the event. As to the Auditorium and Gymnasium, depending on the type of event and group size, a damage deposit of up to $300 may be added to rental charges. Pending the rental space does not incur any damages; the deposit will be refunded within 21 days after the event date. b. Specific to the Auditorium, Banquet Room and Gymnasium, a non refundable rental deposit of one -half the fee is required within two weeks of permit issue. The renter will forfeit the reservation if the rental deposit is not received within two weeks after the permit issue date. The balance of the room fee is due two weeks prior to the event. c. Specific to the Ice Arena, a non refundable deposit of 50% of the total contract price is required upon receipt of the Ice Arena contract for use. The remainder of the contract shall be paid before the group gets on the ice. RAHA and RHS (ISD 196) are exempt from paying a deposit and will make full payment for the previous month's ice bill. d. Specific to the Classrooms, the rental fee is required with the signed permit. The reservation is not confirmed until both the signed permit and the fees are paid. 29 RESOLUTION,2008 Deleted: 2007 Deleted: 116 Formatted: Indent: Left: 0.25" II. OUTDOOR FACILITIES A. Park Facility Priority Use All City of Rosemount Parks and Recreation Activities will be given priority; all facilities will be scheduled to accommodate these activities. After all Parks and Recreation activities have been scheduled accordingly, then requests will be granted to other users in order of their priority as listed below. User Groups 2, 5, 6 and 7 are charged facility fees for tournaments and camps only. Fees are not charged for regular season play. 1. City Sponsored Events All Parks and Recreation Activities which include, but are not limited to, adult leagues, tournaments, playground programs, special events, etc. 2. RAAA, Dakota Rev and RAHA 3. Rosemount Non -Profit and Civic /Service Groups 4. Rosemount Residents 5. Rosemount ISD 196 Schools 6. Rosemount Non -Public Schools 7. Rosemount Colleges and Universities 8. All Other Requests B. Facility Fees 1. Erickson Softball Complex and Tournament Fees: Athletic Fields (Ball, Soccer) Field Maintenance Chalk Field Dry 2. Park Shelter Fees: Open Shelter (does not include other park amenities) Enclosed Shelter (does not include other park amenities) Amphitheater (comes with use of Central Park Shelter) $35 tax /field /day $30 /hour or cost incurred by City Cost incurred by City Cost incurred by City $30 tax /day (Resident) $50 tax /day (Non- Resident) $80 tax /day (Resident) $130 tax /day (Non- Resident) $150 tax /day (Resident) $250 tax /day (Non- Resident) 30 RESOLUTION,2008 Deleted: 2007 Deleted: 116 3. Non League Facility Fees: Fields (Ball, Soccer) Tennis Court Hockey Rink Volleyball Court 4. Camps 5. Independent League Field Fees: Fields (Ball, Soccer, Outdoor Rinks) 6. Other Fees: Portable Toilet Damage Deposit Lost Key Fee $35 tax /field /day $10 tax /court/4 hours $15 tax /rink /4 hours $10 tax /court/day $45 tax /field /day (Resident)* $55 tax /field /day (Non- Resident)* Direct Maintenance Fees for camps will be added to rental fees $300 tax /team /12 week season Based upon price quoted by toilet provider $150 for all events (refundable) $50 per key 7. Cancellations will be subject to 50% of the rental fee. No refunds for inclement weather 31 RESOLUTION,200$1_ Deleted: 2007 Deleted: 116 III. PARK DEDICATION FEES A. Park Dedication Fees Park dedication fees are outlined in City Subdivision Ordinance and City Ordinance No. XVII.103 and .107 which states: In all new residential subdivisions, the City shall require that a sufficient portion of such land be set aside and dedicated to the public for parks, playgrounds or other public use exclusive of property dedicated for streets and other public ways. It shall be presumed that a sufficient amount of land has been dedicated for parks and playgrounds for the present and future residents of the subdivision, if the subdivider dedicates at least 1/25 of an acre per dwelling unit that can be constructed in the subdivision. The City upon consideration of the particular type of development proposed in the subdivision may require larger or lesser amounts of land be dedicated if the City determines that the present and future residents of the subdivision would require greater or lesser amounts of land for such purposes. The City shall determine whether cash in lieu of land dedication is more appropriate. The amount of cash dedication shall be determined by multiplying the number of acres otherwise required to be dedicated by the average value of comparable undeveloped land set by resolution by the City Council. In all new commercial and industrial subdivisions, it shall be presumed that a sufficient amount of land has been dedicated to serve the needs of the resident and working population if the sub divider dedicates at least ten percent (10 of the land in the subdivision for parks, recreation and usable open space. The City upon consideration of the particular type of development proposed in the subdivision may require larger or lesser amounts of land to be dedicated if it determines that the present and future residents of the subdivision would require greater or lesser amounts of land for such purposes. The City shall determine whether cash in lieu of land dedication is appropriate. The amount of cash dedication shall be determined by multiplying the number of acres otherwise required to be dedicated by the average value of comparable undeveloped land set by resolution of the City Council. Land Values for the dedication of land and /or cash contribution: New residential subdivision $85,000 /acre Commercial subdivision $90,000 /acre Industrial subdivision $50,000 /acre Business Park development $85,000 /acre 32 RESOLUTION,2008i (Deleted: 2007 Deleted: 116