Loading...
HomeMy WebLinkAbout6.m. Change Order #1 - Well #15, City Project #408 4ROSEI vIOLIN 1TEXECUTIVE SUMMARY CITY COUNCIL City Council Meeting: January 2, 2008 AGENDA ITEM: Change Order #1 -Well #15, City Project AGENDA SECTION: 408 Consent PREPARED BY: Andrew J. Brotzler, P.E., City Enginee i AGENDA CO. ATTACHMENTS: Letter; Change Order #1 APPROVED BY: RECOMMENDED ACTION: Motion to approve Change Order #1 to Well #15, Ci !Project #408 and authorize the necessary signatures. ISSUE Consider approval of Change Order #1 for Well #15, City Project #408. BACKGROUND Attached for City Council consideration is Change Order #1 for Well #15, City Project #408. As outlined in the attached letter from Nancy Zeigler with WSB and Change Order #1, the Change Order consists of additional testing completed by the contractor due to concerns about water quality encountered during drilling. The total amount of Change Order #1 is a net increase of $4,592.00 for a revised contract amount of $308,919.00. As previously noted to Council, the testing completed has confirmed that there are no water quality issues and the results have been reviewed by the Minnesota Department of Health SUMMARY Staff recommends Council approval of Change Order #1. G: ENGPROJ 408 ChangeOrderICC01-02-08.doc WSB Associates, Inc. Infrastructure 1 Engineering 1 Planning 1 Construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763-541-4800 December 12, 2007 Fax: 763 -541 -1700 Mr. Andy Brotzler, PE City Engineer City of Rosemount 2875 145 Street West Rosemount, MN 55068 Re: Change Order No. 1 Municipal Production Well No. 15 City Project No. 408 City of Rosemount, MN WSB Project No. 1582 -02 Dear Mr. Brotzler: Please find enclosed Change Order No. 1 (four copies) for the above referenced project. The change order reflects a net increase to the contract amount of $4,592.00 for a revised contract total of $308,919.00. There is no increase to the contract time. The change order has been reviewed and agreed upon by the contractor and we hereby recommend that the City of Rosemount approve Change Order No. 1 for E. H. Renner Sons, Inc. If you have any questions or comments regarding the enclosed, please contact me at 763 -287- 8316. Thank you. Sincerely, WSB Associates, Inc. hi5,..„;jes Nancy Zeigler, PE Senior Project Manager Enclosures cc: Cindy Dorniden, City of Rosemount Roger Renner, E. H. Renner Sons, Inc. srb Minneapolis 1St Cloud K:101582 -02udanrnCons orcdun Adx,.ILTR CO I m b,a krl21207.doo Equal Opportunity Employer CHANGE ORDER NO. 1 MUNICIPAL PRODUCTION WELL NO. 15 DECEMBER 7, 2007 CITY PROJECT NO. 408 CITY OF ROSEMOUNT WSB PROJECT NO. 1582 -02 U t. C 1' 20u/ OWNER: CONTRACTOR: CITY OF ROSEMOUNT E. H. RENNER SONS, INC. 2875 145TH STREET WEST 15688 JARVIS STREET NW ROSEMOUNT MN 55068 ELK RIVER MN 55330 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: Additional water quality sampling due to warmer, foamy conditions experienced during drilling. IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: ORIGINAL CONTRACT PRICE: $304,327.00 ORIGINAL CONTRACT TIME: 12/15/2008 PREVIOUS CHANGE ORDERS: N/A 5 NET CHANGE FROM PREVIOUS CHANGE ORDERS: N/A CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: 5304,327.00 CONTRACT TIME PRIOR TO THIS CHANGE ORDER: 12/15/2008 NET INCREASE OF THIS CHANGE ORDER: $4,592.00 NET INCREASE OF CHANGE ORDER: 0 DAYS CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: 5308,919.00 CONTRACT TIME WITH APPROVED CHANGE ORDERS: 12/15/2008 RECOMMENDED BY: APPROVED BY: e Zit 1 I. 1 ta dlLa— N a',t Y D. Z IGLER EN/ PROJECT MANAGER CONTRACTOR SIGNATURE WSB ASSOCIATES, INC. E. H. RENNER SONS, INC. ENGINEER CONTRACTOR APPROVED BY: CITY ENGINEER CITY ADMINISTRATOR DATE DATE C:Woeumena and SedingslRogergareal Sedingstremporary Internet FII.s%0LK51115112 -02 change Order !CO 1