HomeMy WebLinkAbout6.o. Change Order #2 - 2007 Street Improvements Project, City Project #410 4ROSEMOLIN4T SUMMARY CITY COUNCIL City Council Meeting: January 2, 2008 AGENDA ITEM: Change Order #2 2007 Street AGENDA SECTION: Improvement Project, City Project #410 Consent PREPARED BY: Andrew J. Brotzler, PE, City Engineer 1' AGENDA NO. 1„ c ATTACHMENTS: Change Order #2 APPROVED BY: RECOMMENDED ACTION: Motion to Approve Change Order #2 for the 2007 St et Improvement Project, City Project #410. BACKGROUND: Attached for Council consideration is Change Order #2 for the 2007 Street Improvement Project, City Project #410. This change order represents additional costs incurred as a result of the work outlined in the attached letter from Anthony Aderhold with WSB Associates, Inc. The total amount of Change Order #2 is a net increase of $13,425.23 for a revised contract amount of $1,215,571.29. This contract increase is within the contingency budget for the project. SUMMARY: Staff recommends Council approval of Change Order #2 for the 2007 Street Improvement Project, City Project #410. G: \ENGPROJ \410 \ChangeOrder2CC1- 02- 08.doc WSB Associates, Inc. Infrastructure 1 Engineering 1 Planning 1 Construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763- 541 -4800 January 2, 2007 Fax: 763- 541 -1700 Mr. Andy Brotzler, PE City Engineer City of Rosemount 2875 145 Street West Rosemount, MN 55068 Re: Change Order No. 2 2007 Street Improvement Program Project City of Rosemount Project No. 410 WSB Project No. 1556 -89 Dear Mr. Brotzler: Please find enclosed Change Order No. 2 for the above referenced project for your review and approval. The net increase to the contract total is $13,425.23. Change Order No. 2 increases the contract amount from $1,202,146.06 to a new revised contract amount of $1,215,571.29. The major items of work included as part of Change Order No. 2 are as follows: Added Items 1. Item 199: Seeding Topsoil import along with seeding and mulching for damaged area of Biscayne Park caused by homeowners from Biscayne Way parking at this location during construction. 2. Item 200: Pavement Marking Special Epoxy striping completed at Biscayne Way /145` Street West intersection and Biscayne Way/Biscayne Avenue intersection. 3. Item 201: Construct Outside Drop Existing sanitary manhole at the intersection of Biscayne Way and Biscayne Avenue was found to have an existing clay drop. Removed clay drop structure and replaced with a ductile iron pipe drop structure. Work also consisted of core drilling new openings into the manhole. 4. Item 202: Landscape Improvements Installed a rain garden at 14550 Biscayne Way. Installation included all of the plants, bedding material, and mulch associated with the rain garden. Minneapolis 1 St. Cloud Equal Opportunity Employer K101556S9lAd .inTontauelimASnieWTRCO2CTY 4 Mader-010207Aoe Mr. Andy Brotzler, PE January 2, 2007 Page 2 Please review the attached change order and obtain the necessary approvals and return to me for final processing. If you have any questions or comments regarding the enclosed, please contact me at 763 231 -4844. Sincerely, WSB Associates, Inc. Pa-.." Anthony A. Ad rhold, PE Project Manager Enclosures cc: Cindy Dorniden, City of Rosemount Sammon Parker Construction, Inc. K t015164PlAdomaComintataro AdodoV,TR 00 :cll... 6rouler410207 .dac i r. 'n Tt ttkt 9 dl L i �r I J j Z� t a i I i 1 i 2001 STREET IMPROVEMENT PROGRAM PROJECT 01102/07 CITY Ro$EMOUNT PROJECT NO. 410 WS$ PROJECT 1560 -69 OWNER: CONTRACTOR: CITY OF ROBEMDUNT GAMMON PARKER CONSTRUCTION, INC. 2871 -145TH STREET WEST 22000 BAGLEY AVENUE ROSEMOUNT, MN 58060 FARIBAULT, MN 59021 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: ADDED ITEMS: ITEM 109: SEEDING SPREAD BLACK GIRT IN VEHICLE RUTS IN BISCAYNE PAI CISEEDED AND MULCHED DISTURBED AREAS ITEM 200: PAVEMENT MARKING SPECIAL. EPDXY STRIPING ON 145TH ST. W. AND ON BISCAYNE WAY ITEM 201: CONSTRUCT OUTSIDE DROP EXISTING ACES MANHOLE AT BISCAYNE AVENUE/BISCAYNE WAY INTERSECTION ITEM 202: LANSCAPE IMPROVEMENTS INSTALLED RAIN GARDEN AT 14550 BISCAYNE WAY DELETED ITEMS: IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL. COSTS AND TIME !EXTENSIONS WHICH ARE IN ANY WAY. SHAPE, OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE. CHANGE IN CONTRACT PRICE.: CHANGE IN CONTRACT TE IE: ORIGINAL CONTRACT PRICE` $1.192,476.34 ORIGINAL CONTRACT TIME: 9/3012007 PREVIOUS CHANGE ORDERS: 58. 669.72 NET CHANGE FROM PREVIOUS CHANGE ORDIFF0 0 CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: 51.202,146.06 CONTRACT TIME PRIOR TO THIS CHANGE ORDER: 913012007 NET INCREASE OF T•I$ CHANGE ORDER $13. 425.23 NET INCREASE WITH CHANGE ORDER: NONE CONTRACT PRICE WITH AU. APPROVED CHANGE ORDERS: $1.215, 571.28 CONTRACT TIME WITH APPROVED CHANGE ORDERS 9/3012007 RECQfi LADED BY: APPROVED BY: ANTHONY AD PE, PROJECT ER CONTRACTOR SIGNATURE W80 ASSOCIATES, INC. SAMMON PARKER CONSTRUCTICNIMG. ENGINEER CONTRACTOR APPROVED BY CITY ENGINEER CITY ADMINIS'T'RATOR DATE OF COUNCIL ACTION teaussmVioolniCo nritaiPn Aagintl:u-1• OWN ad«Z,dW0arr* x s +'kk�'s7i ,X^ u?' rz^ s 3a�,.'s+z,, s Y m j F,�" �GHANGE ORDER NO 2 DETAIL �k s��� Rit :s h �r tl z` _.:.;y+` °A x: e a .�x... i i ..t t 3Y. F t ik 1 Vi`'`i. c. ..a Mu .3 a... ik,..' s :V ...e Ei t 2007 STREET IMPROVEMENT PROGRAM PROJECT 01/02/07 CITY ROSEMOUNT PROJECT NO. 410 WSB PROJECT 1556 -89 ADDED ITEMS Item No. Mat. No. Description Note Qty Unit Price Extended Amount 22650 BAGLEY AVENUE 199 2575.604 SEEDING 1 SY YD $1,177.94 $1,177.94 200 2582.618 PAVEMENT MARKING SPECIAL 1 SO FT $3,749.63 $3,749.63 201 2503.602 CONSTRUCT OUTSIDE DROP 1 EACH $3,184.66 $3,184.66 202 2571.601 LANDSCAPE IMPROVEMENTS 1 LS $5,313.00 $5,313.00 TOTAL ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT $13,425.23 K:101666.89i4dminlConstructIon Admtn1t56849 Change Order Welsh