HomeMy WebLinkAbout6.o. Change Order #2 - 2007 Street Improvements Project, City Project #410 4ROSEMOLIN4T SUMMARY
CITY COUNCIL
City Council Meeting: January 2, 2008
AGENDA ITEM: Change Order #2 2007 Street AGENDA SECTION:
Improvement Project, City Project #410 Consent
PREPARED BY: Andrew J. Brotzler, PE, City Engineer 1' AGENDA NO. 1„ c
ATTACHMENTS: Change Order #2 APPROVED BY:
RECOMMENDED ACTION: Motion to Approve Change Order #2 for the 2007 St et
Improvement Project, City Project #410.
BACKGROUND:
Attached for Council consideration is Change Order #2 for the 2007 Street Improvement Project, City
Project #410.
This change order represents additional costs incurred as a result of the work outlined in the attached letter
from Anthony Aderhold with WSB Associates, Inc. The total amount of Change Order #2 is a net
increase of $13,425.23 for a revised contract amount of $1,215,571.29. This contract increase is within the
contingency budget for the project.
SUMMARY:
Staff recommends Council approval of Change Order #2 for the 2007 Street Improvement Project, City
Project #410.
G: \ENGPROJ \410 \ChangeOrder2CC1- 02- 08.doc
WSB
Associates, Inc. Infrastructure 1 Engineering 1 Planning 1 Construction 701 Xenia Avenue South
Suite 300
Minneapolis, MN 55416
Tel: 763- 541 -4800
January 2, 2007 Fax: 763- 541 -1700
Mr. Andy Brotzler, PE
City Engineer
City of Rosemount
2875 145 Street West
Rosemount, MN 55068
Re: Change Order No. 2
2007 Street Improvement Program Project
City of Rosemount Project No. 410
WSB Project No. 1556 -89
Dear Mr. Brotzler:
Please find enclosed Change Order No. 2 for the above referenced project for your review and
approval. The net increase to the contract total is $13,425.23. Change Order No. 2 increases the
contract amount from $1,202,146.06 to a new revised contract amount of $1,215,571.29. The
major items of work included as part of Change Order No. 2 are as follows:
Added Items
1. Item 199: Seeding Topsoil import along with seeding and mulching for damaged area
of Biscayne Park caused by homeowners from Biscayne Way parking at this location
during construction.
2. Item 200: Pavement Marking Special Epoxy striping completed at Biscayne Way /145`
Street West intersection and Biscayne Way/Biscayne Avenue intersection.
3. Item 201: Construct Outside Drop Existing sanitary manhole at the intersection of
Biscayne Way and Biscayne Avenue was found to have an existing clay drop. Removed
clay drop structure and replaced with a ductile iron pipe drop structure. Work also
consisted of core drilling new openings into the manhole.
4. Item 202: Landscape Improvements Installed a rain garden at 14550 Biscayne Way.
Installation included all of the plants, bedding material, and mulch associated with the
rain garden.
Minneapolis 1 St. Cloud
Equal Opportunity Employer K101556S9lAd .inTontauelimASnieWTRCO2CTY 4 Mader-010207Aoe
Mr. Andy Brotzler, PE
January 2, 2007
Page 2
Please review the attached change order and obtain the necessary approvals and return to me for
final processing. If you have any questions or comments regarding the enclosed, please contact
me at 763 231 -4844.
Sincerely,
WSB Associates, Inc.
Pa-.."
Anthony A. Ad rhold, PE
Project Manager
Enclosures
cc: Cindy Dorniden, City of Rosemount
Sammon Parker Construction, Inc.
K t015164PlAdomaComintataro AdodoV,TR 00 :cll... 6rouler410207 .dac
i r.
'n Tt ttkt 9 dl L i �r I J j Z� t a i I i 1 i
2001 STREET IMPROVEMENT PROGRAM PROJECT 01102/07
CITY Ro$EMOUNT PROJECT NO. 410
WS$ PROJECT 1560 -69
OWNER: CONTRACTOR:
CITY OF ROBEMDUNT GAMMON PARKER CONSTRUCTION, INC.
2871 -145TH STREET WEST 22000 BAGLEY AVENUE
ROSEMOUNT, MN 58060 FARIBAULT, MN 59021
YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION:
ADDED ITEMS:
ITEM 109: SEEDING SPREAD BLACK GIRT IN VEHICLE RUTS IN BISCAYNE PAI CISEEDED AND MULCHED DISTURBED AREAS
ITEM 200: PAVEMENT MARKING SPECIAL. EPDXY STRIPING ON 145TH ST. W. AND ON BISCAYNE WAY
ITEM 201: CONSTRUCT OUTSIDE DROP EXISTING ACES MANHOLE AT BISCAYNE AVENUE/BISCAYNE WAY INTERSECTION
ITEM 202: LANSCAPE IMPROVEMENTS INSTALLED RAIN GARDEN AT 14550 BISCAYNE WAY
DELETED ITEMS:
IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL. COSTS AND TIME !EXTENSIONS WHICH ARE IN ANY WAY. SHAPE, OR
FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE.
CHANGE IN CONTRACT PRICE.: CHANGE IN CONTRACT TE IE:
ORIGINAL CONTRACT PRICE` $1.192,476.34 ORIGINAL CONTRACT TIME: 9/3012007
PREVIOUS CHANGE ORDERS: 58. 669.72 NET CHANGE FROM PREVIOUS CHANGE ORDIFF0 0
CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: 51.202,146.06 CONTRACT TIME PRIOR TO THIS CHANGE ORDER: 913012007
NET INCREASE OF T•I$ CHANGE ORDER $13. 425.23 NET INCREASE WITH CHANGE ORDER: NONE
CONTRACT PRICE WITH AU. APPROVED CHANGE ORDERS: $1.215, 571.28 CONTRACT TIME WITH APPROVED CHANGE ORDERS 9/3012007
RECQfi LADED BY: APPROVED BY:
ANTHONY AD PE, PROJECT ER CONTRACTOR SIGNATURE
W80 ASSOCIATES, INC. SAMMON PARKER CONSTRUCTICNIMG.
ENGINEER CONTRACTOR
APPROVED BY
CITY ENGINEER CITY ADMINIS'T'RATOR
DATE OF COUNCIL ACTION
teaussmVioolniCo nritaiPn Aagintl:u-1• OWN ad«Z,dW0arr*
x s
+'kk�'s7i ,X^ u?' rz^ s 3a�,.'s+z,, s Y m
j F,�" �GHANGE ORDER NO 2 DETAIL �k s���
Rit :s h �r tl z` _.:.;y+` °A x: e a .�x... i i ..t t 3Y. F t ik 1 Vi`'`i. c. ..a Mu .3 a... ik,..' s :V ...e Ei t
2007 STREET IMPROVEMENT PROGRAM PROJECT 01/02/07
CITY ROSEMOUNT PROJECT NO. 410
WSB PROJECT 1556 -89
ADDED ITEMS
Item No. Mat. No. Description Note Qty Unit Price Extended Amount
22650 BAGLEY AVENUE
199 2575.604 SEEDING 1 SY YD $1,177.94 $1,177.94
200 2582.618 PAVEMENT MARKING SPECIAL 1 SO FT $3,749.63 $3,749.63
201 2503.602 CONSTRUCT OUTSIDE DROP 1 EACH $3,184.66 $3,184.66
202 2571.601 LANDSCAPE IMPROVEMENTS 1 LS $5,313.00 $5,313.00
TOTAL ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT $13,425.23
K:101666.89i4dminlConstructIon Admtn1t56849 Change Order Welsh