Loading...
HomeMy WebLinkAbout6.i. Receive Quotes/Award Contract-CSAH 38/Shannon Parkway Turn Lanes, City Poject #424 4ROSEMOUNT EXECUTIVE SUMMARY CITY COUNCIL City Council Meeting: August 19, 2008 AGENDA ITEM: Receive Quotes /Award Contract -CSAH AGENDA SECTION: 38 /Shannon Parkway Turn Lanes, City Consent Project #424 PREPARED BY: Andrew J. Brotzler, PE, City Engineer AGENDA NO. ATTACHMENTS: Map APPROVED BY• RECOMMENDED ACTION: Motion to Adopt a Resolution Receiving Quotes and Awarding the Contract for the CSAH 38 /Shannon Parkway, City Project #424. ISSUE: Receive quotes and award the contract for the CSAH 38 /Shannon Parkway Turn Lanes, City Project #424. BACKGROUND: This project will create an eastbound right turn lane and a westbound bypass lane on CSAH 38 at Shannon Parkway. The City and County will jointly participate in the engineering, administrative and construction costs for this project. The City's portion of the project cost is anticipated to be funded with Municipal State Aid funds. SUMMARY: Quotes for the referenced project have been received. Staff will have a tabulation of quotes and resolution to present to Council at the meeting. G: \ENGPROJ\ 424\ ReceiveQuotes- AwardContractCC8- 19- 08.doc .. ROSEMO PUBLIC WORKS DEPARTIVI W �F o v J KI COBBLESTON J O� J a CA ODO o m Z Ap C rVICANDREWS RD CSAH 38 v T w � a n O p v 127TH CT W 0 z G ICA �� v Az O DANUS LN C R �Mc DRUMCLIFFE DRU CLIFFS CHARLSTON WAY M CT I CROLLY CT r a _ RMOO = ST W 1" DRUMCLIF E � RC S CR GGS ON% CT hE Ga Q, 133RD CT W .� 0R0 c+ ° °J �. CRp C1R CG p m 134TH ST W O O A CORM C1R o oQ� �PaR.a�y R @F AF FO O ACTO C) o o a V) N Z N C CO C►iT W.p CpRRAy c ►- ID G O nv 135TH ST W R J V DO q Cr A f q '6 >' ROSSLOUGN p y cr t Q i m 3 DELLWOOD g c ITH ST W< z O a C H a o° S�pJG� tas , rw a O ,Q N 0 500 1,000 2,000 3,000 4,0 W +E Feet g TJGIS/City /Maps/Deparhnental Maps/Engineering/Chris/Shannon-38 Locate July 2008 t ROSEMOU G r o w 1 R la m U 2 m 5 <� ti a a. u V LU m ; W m � 28 Z 9 ~ 5 �� Y 130TH ST W a IV .,v ; M a :rw . 1 v W PWD IRE PATH W AB AIRE PATH E ,X BIRD NG ,y A44REPOND CT < �',� 0. , 1 M BIRDSONG PA O Sv s 1 T CON C3 ST W r� T > a 140TH gr c T V Lu LMONT as �, W ,,,.� j Q Z Z B w 0 \E pq sTA�t J� 0 0 C D MF ST W U W BAr RYTR C r 145TH ST W CSAH 145TH g a AWORAAVE two Me e1 0� 3BIB6tRr A Q' � eoreE CNt W 18TH ST a y� G LU a' 4y0 a Z O Y 151ST CT a N 0 750 1,500 3,000 4,500 6,000 W�E Feet December 200 TJGIS/City/Maps/Departmental Maps/Engineedng/Chds/CR73 Utility Locate.mxd CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2008 - A RESOLUTION AWARDING CONTRACT FOR CSAH 38 /SHANNON PARKWAY TURN LANES CITY PROJECT #424 WHEREAS, City Council hereby ratifies action of City Engineer to secure quotes. BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: 1. The quote of Bituminous Roadways of Inver Grove Heights, Minnesota in the amount of $120,479.32 for an eastbound right turn lane and a westbound bypass lane shall be and hereby is accepted. 2. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 3. Award of the contract is contingent on the determination by the City Administrator that all necessary rights -of -entry or easements by deed or dedication have been secured for construction of the improvements. ADOPTED this 19`' day of August, 2008. William H. Droste, Mayor ATTEST: Amy Domeier, City Clerk Motion by: Seconded by: Voted in favor: Voted against: WS B MINE I M all" - & Associates; Inc: ;- Project: CSAH 38 and Shannon Parkway Intersection Improvements Location: City of Rosemount, MN City Project No. 424 WSB Project No. 1668-48 Date: August 14, 2008 Contractor Bid Security Addendum 1 Total Bid 1 Bituminous Roadways, Inver Grove Heights Yes N/A $120,479.32 2 Northwest Asphalt Yes N/A $130,115.61 3 McNamara Contracting, Inc. Yes N/A $132,430.17 Engineer's Estimate $98,490.75 I hereby certify that this is a true and correct tabulation of the bids as received on August 14, 2008. rgan aw , PE, P jest Manager Denotes corrected figure WSB Infrastructure ■ Engineering ■ Planning ■ Construction 701 Xenia Avenue South Suite #300 & Associates, loc• Minneapolis, MN 55416 Tel: 763 541 -4800 Fax: 763 541 -1700 August 14, 2008 - Honorable Mayor and City Council City of Rosemount 2875 145 Street West Rosemount, MN 55068 Re: City of Rosemount C.P. No. 424 S.A.P. Nos. 208 - 020 -008 / 19- 638 -12 Dakota County Project No. 38 -40 City of Rosemount WSB Project No. 1668 -4 Dear Mayor and Council Members: Quotes were received for the above - referenced project on Thursday, August 14, 2008, and were opened. A total of three quotes were received. The quotes were checked for mathematical accuracy and tabulated. Please find enclosed the bid tabulation indicating the low bidder as Bituminous Roadways, Inver Grove Heights, in the amount of $120,479.32. We recommend that the City Council consider these bids and award a contract to Bituminous Roadways, based on the results of the bids received. Sincerely, WSB & Associates, Inc. Morgan Dawley, PE Project Manager Enclosure cc: Tom Anton, Dakota County Bituminous Roadways, Inc. ACEC 2008 Firm of the Year K: 101668481AdminlCawnuction AdminIL7R FECAAIDTN- kmtt -08il08.doc