Loading...
HomeMy WebLinkAbout6.g. Receive Bids/Award Contract-2008 Street Improvement Project, City Project #418 4ROSEMOLINT SUMMARY CITY COUNCIL City Council Meeting: June 17, 2008 AGENDA ITEM: Receive Bids /Award Contract 2008 AGENDA SECTION: Street Improvement Project, City Project Consent #418 PREPARED BY: Andrew J. Brotzler, PE, City Engineer AGENDA NO. 10.3 ATTACHMENTS: Resolution; Letter of Recommendation; APPROVED BY: Bid Tabulation; Map RECOMMENDED ACTION: Motion to Adopt a Resolution Receiving Bids and Awarding Contract for the 2008 Street Improvements Project, City Project #418 ISSUE: Receive bids and award a contract for the 2008 Street Improvement Project. BACKGROUND: On Wednesday, May 28, 2008, bids were received for the 2008 Street Improvement Project and read aloud publicly. The project includes surface improvements to approximately 1.2 miles of 32 -foot wide urban streets including Claret Avenue (between 155 Street West and Cornell Trail West, Cornell Trail (between Claret Avenue and east end), 156 Street West (between Claret Avenue and Chippendale Avenue), and Cicerone Path (from Cornell Trail West southwest approximately 720 feet). After verification of bids received, the low bidder is McNamara Contracting, Inc. in the amount of $802,503.23. Costs associated with the surface improvements excluding sidewalk improvements will be funded by special assessments and street C.I.P. funds while sidewalk improvement costs will be funded by the General Fund. Bids received on Wednesday, May 28, 2008 were reviewed with Council at the June 3, 2008 City Council Work Session to discuss potential solutions with the receipt of an unbalanced bid. Since that meeting, Staff has drafted language to add to the contract regarding use of bid items at the Engineer's discretion. The language has been reviewed by the City's legal counsel and agreed upon by the low bidder, McNamara Contracting. In anticipation of the award of contract, Staff has sent out project contact and schedule information to affected residents and has also scheduled a preconstruction meeting with the contractor, tentatively scheduled for May 20, 2008. SUMMARY: Staff recommends that Council adopt the attached resolution receiving the bids and awarding the contract for the 2008 Street Improvement Project, City Project #418. G: \ENGPROJ\ 418\ ReceiYeBidsAwrdContract- CC6- 17- 08.doc CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2008 A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR THE 2008 STREET IMPROVEMENT PROJECT CITY PROJECT #418 BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: 1. All bids on construction of the 2008 Street Improvement Project are hereby received and tabulated. 2. The bid of McNamara Contracting in the amount of $802,503.23 for the construction of said improvements is in accordance with the plans and specifications and advertisement for bids, and is the lowest responsible bid and shall be and hereby is accepted. 3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of all successful bidder and the next two lowest bidders shall be retained until a contract has been executed. ADOPTED this 17 day of June, 2008. William H. Droste, Mayor Al-LEST: Amy Domeier, City Clerk Motion by: Seconded by Voted in favor: Voted against WSB I nfrastructure Engineering Plannin Associates, Inc. Planning Construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763 541 -4800 Fax: 763 541 -1700 May 28, 2008 Honorable Mayor and City Council Members City of Rosemount 2875 145 Street West Rosemount, MN 55068 Re: 2008 Street Improvement Project City of Rosemount Project No. 418 WSB Project No. 1668 -31 Dear Mayor and Council Members: Bids were received for the above referenced project on Wednesday, May 28, 2008, and were opened and read aloud. A total of four bids were received. The bids were checked for mathematical accuracy and tabulated. The Engineer's Estimate was $936,479.50. Please find enclosed the bid tabulation indicating the low bidder as McNamara Contracting, Inc., Rosemount, Minnesota, in the amount of $802,503.23. We recommend that the City Council consider these bids and award a contract to McNamara Contracting, Inc., based on the results of the bids received. Sincerely, WSB Associates. Inc. 1 .6Y4 7 Anthony Aderhold, PE Project Manager Enclosures cc: Mike McNamara, McNamara Contracting, Inc. Andy Brotzler, City of Rosemount Morgan Dawley, City of Rosemount Cindy Dorniden, City of Rosemount tsf C:IDocuments and Saiings\rdawley. WSBLT-0431LocaI Setlmgs\Tempomy Inland Fil s\OIXACILTR RECMMDTN sigaad -052808.doc fie -a PROJECT: 2008 Street Improvement Project LOCATION: City of Rosemount Project No. 418 WSB PROJECT NO.: 1668 -31 Bids Opened: Wednesday, May 28, 2008 at 10:00 a.m. Bid Security Contractor (5%) Grand Total Bid 1 McNamara Contracting, Inc. X $802,503.23 2 Northwest Asphalt, Inc. X 3 North Valley, Inc. X $900,870.20 4 Max Steininger, Inc. X Engineer's Opinion of Cost $936,479.50 I hereby certify that this is a true and correct tabulation of the bids as received on May 28, 2008. .4". 4/44,40-e, Anthony A. erhold, PE, Project Manager Denotes corrected figure C:IDoc "menis and Settingslmdawley.WSBLTd143tLocal SettingslTempurary Internet FilesIOLKAC11668-31 Bid Tab Summary rT ROSEMOUNT 2 Set Impements 151ST >11-1-1,,, Q �515' SST Si. 4 v Q �`N 2 0 �i .R TRL o -9G l cc 1" ►TW H \F V 1 cc� U W Q c) c•) O �p CIMARRON `N j O'LEARY'S COLUMB 152ND ST W PON D p CIR .D ST W 153RD ST W W %..1 Q W 153RDSTW Q J T m 54TH ST W /v) J Pr CHILI CT 155TH S r 0 C ORNELL TRL W 156TH ST W H s r 1 i !'izz "Z CI a tre CO ELL gii,olie..,ryov, 0 u a C N O RI�IELL TRL o Iii j 1/4 P� D pp'CN y�� co �Q' w CO LL 23. �P CTS ��1K ZZ v P L O 158TH ST W J V-6 q 'QQ/ G `R n W 9 q ST W '4'Q Q' v y C ,CAS <4' A._ Y O y c N (CSAH 46 N 0 260 520 1,040 1,560 2,080 W E Feet S December 2007 T: /GIS/City/Maps/Departmental Maps/Engineering/Chas/2008 Reon Locate