Loading...
HomeMy WebLinkAbout6.d. Change Order #1, 2 & 3 - Connemara Tower Painting, City Project #411 4ROSEt vLOLINJf EXECUTIVE SUMMARY CITY COUNCIL City Council Meeting: January 15, 2008 AGENDA ITEM: Change Order #1, 2 3- Connemara AGENDA SECTION: Tower Painting, City Project #411 Consent PREPARED BY: Andrew J. Brotzler, PE, City Engineer AGENDA NO. 4/4. ATTACHMENTS: Change Order #1, 2 3; KLM APPROVED BY: Engineering Letter of Recommendation RECOMMENDED ACTION: Motion to Approve Change Order #1, 2 3 forth Connemara Tower Painting, City Project #411. ISSUE: KLM Engineering is recommending three change orders to this project for a net reduction in contract price from $494,500 to $487,157.12. BACKGROUND: The following summarizes the proposed contract changes: Change Order 1: This change order was originally approved by Council on May 15, 2007. The original change order added $3,000 to the contract to allow additional venting to be installed during blasting and painting operations. The work covered by this change order was never completed. Therefore, Change Order 1 should be reversed. Change Order 2: This change order is a deduction of $7,842.88 for three electric bills paid by the City. Change Order 3: This change order is to replace the damaged pipe -style safety climb device with a more common cable -style safety device. This change order is an increase of $3,500. SUMMARY: Staff recommends that Council approves Change Order #1, 2 3 for the Connemara Tower Painting, City Project #411. G: ENGPROJ 411 \ChangeOrder 1 -2 -3CC 1- 15-08. doc KLM ..ENCINEERIN INC. P.O. Box 897.3394 Lake Elmo Ave. N. Lake Elmo, MN 55042 (651) 773 -5111 Fax (651) 773 -5222 December 26, 2007 Mr. Andrew Brotzler City of Rosemount 2875 145 Street West Rosemount, MN 55068 RE: Detailed Explanation of the Change Orders No. 1, 2, 3 for the Connemara Tower Located in Rosemount, Minnesota. City Project No. 411 KLM Project No. MN1829 Dear Mr. Brotzler: Change Order No 1: This $3,500.00 change order was to install two (2) additional roof ventilation manways to provide additional ventilation during blasting, painting, and curing of the tower during reconditioning. By the time the change order was approved, OPC had completed the interior wet painting and had removed the rigging needed to weld, blast, and paint the interior wet portions of the manways. Therefore, change order no. 1 for $3,500.00 was never completed. Change Order No. 2: This change order is a deduction from the contract amount by $7,842.88 for three (3) electric bills paid by the city. 1 Master Electric Co. replaced water damaged Tight switches, three (3) globes (interior lights), and two (2) circuit breakers and photo cells for $675.65. 2 The city's electrician installed two (2) outlets on the tower for $4,625.39. 3 Sieman's Water Technologies replaced the Micrologix 1200 PLC damaged by dust and water. The cost was $2,541.84. The total cost for change order no. 2 was a deduction of $7,842.88. Change Order No. 3: This change order was a recommendation from KLM to change the damaged pipe style safety climb device to a DBI /SALA ladder safety system cable style safety device commonly installed on water towers. Total cost for labor and materials was $3,500.00. If you have any questions please call me at 651.773.5111. Sincerely, KLM Engineering, Inc. .3(4‘. Kelly C. Mu Ihtrfn Project Supervisor KCM /ms CC: MN 1829 Office File C:Ms\Kelly\MN 1829RosemountChangeOrderExplanationConnemaral2- 26- 07.doc CITY OF ROSEMOUNT, MN CONTRACT CHANGE ORDER NO. 1 Revision 11 -28 -07 Project: Connemara Tower (KLM Project No. MN1829) (City) Project No: 411 Change Order No.: 1 Date: May 3, 2007 Contractor: Odland Protective Coatings The additional authorized work performed by the contractor, contained herein, shall be made in full to the Contract Documents for the project. Connemara Tower. To install 1 or 2 additional roof ventilations to provide adequate ventilation during blasting, painting, curing, and for Confined Space Entry. Total Amount of Change Order No. 1 $3,000.00 (2 additional roof ventilations) Per Odland Protective Coatings Change Order No. 1 is to be DELETED work not done. CHANGE ORDER NO. 1 SUMMARY ORIGINAL CONTRACT AMOUNT $491,500.00 CONTRACT CHANGE ORDER NO. 1 AMENDED CONTRACT $491,500.00 APPROVALS: ACCEPTED BY: Odland Protective Coatings, Inc. By: l 1 0 itle: T f e 3 i L Date: 1 °1 RECOMMENDED BY: KLM Engineering, Inc. D S ;h 7 By: z rf (Title: t Date: 1 L. APPROVED BY: By: Title: Date: C:\ls\2007 projects\MN1829 Rosemount \Change Order No. 1 revised 11- 28- 07.doc CITY OF ROSEMOUNT, MN CONTRACT CHANGE ORDER NO. 2 Project: Connemara Tower (KLM Project No. MN1829) (City) Project No: 411 Change Order No.: 2 Date: November 28, 2007 Contractor: Odland Protective Coatings The additional authorized work performed by the contractor, contained herein, shall be made in full to the Contract Documents for the project. Connemara Tower. Reduce contract amount by $7,842.88 total of three (3) electrical contractor invoices paid by the City of Rosemount. CHANGE ORDER NO. 2 SUMMARY ORIGINAL CONTRACT AMOUNT $491,500.00 CONTRACT CHANGE ORDER NO. 1 CONTRACT CHANGE ORDER NO. 2 7,842.88) AMENDED CONTRACT $483,657.12 APPROVALS: ACCEPTED BY: Odland Protective Coatings, Inc. By f/Y2 T itle: /e5, Date: f) -0 v 7 RECOMMENDED BY: KLM Engineering, Inc. B i '-(_Title: 1 J t'C Date: I d d 7 Y APPROVED BY: By: Title: Date: C:\1s\2007 projects\MN1829 Rosemount \Change Order No. 2 11- 28- 07.doc CITY OF ROSEMOUNT, MN CONTRACT CHANGE ORDER NO. 3 Project: Connemara Tower (KLM Project No. MN1829) (City) Project No: 411 Change Order No.: 3 Date: November 28, 2007 Contractor: Odland Protective Coatings The additional authorized work performed by the contractor, contained herein, shall be made in full to the Contract Documents for the project. Connemara Tower. Provide all equipment and labor to install a DBUSALA ladder safety system (flexible cable type) $3,500.00 CHANGE ORDER NO. 3 SUMMARY ORIGINAL CONTRACT AMOUNT $491,500.00 CONTRACT CHANGE ORDER NO. 1 CONTRACT CHANGE ORDER NO. 2 7,842.88) CONTRACT CHANGE ORDER NO. 3 3,500.00 AMENDED CONTRACT $487,157.12 APPROVALS: ACCEPTED BY: Odland Protective Coatings, Inc. By: t_.c',.� Title: ®'"z6'..1: Date: RECOMMENDED BY: KLM Engineering, Inc. 'f title: By Gs- ,c��� 1 t� Date: d c APPROVED BY: By: Title: Date: C:Us\2007 projects\MN1829 Rosemount \Change Order No. 3 11- 28- 07.doc