HomeMy WebLinkAbout6.h. Receive Bids/Award Contract-Glendalough 5th Street & Utility Improvements City Project #389 .
� CITY OF ROSEMOUNT ,
EXECUTIVE SUMMARY FOR ACTION
CiTY COUNCIL MEETING DATE: . April 5, 2005
AGENDA ITEM: Receive Bids/Award Contract-Giendalough 5th AGENDA SECTION:
Street & Utility Improvements City Project#389 Consent,
PREPARED BY: Andrew J. Brotzler, P.E., City Engineer� �
�
ATTACHMENTS: None APPROVED BY•
_ RECOMMENDED ACTION: MOTION to adopt a resolution receiving bids and awarding
the contract for Glendalough 5 Street and Utility Improvements, City Pro�ect#389.
ACTION:
BACKGROUND:
On Friday, April 1, 2005, bids for the referenced project were received and read aloud
publicly. The bids will then be reviewed for accuracy before a recommendation can be
made.
The Glendalough 5t" Addifiion Street and Utility Improvement Project consists of the
construction of streets and utilities to serve 35 lots within the Glendalough 5t" Addition
of the Evermoor development. The project area is located #o the east of Evermoor
Parkway and north of Connemara TraiL The developer, Lundgren Brothers, wilf fund all
costs associated with the project.
SUMMARY:
The tabulation of bidders, resolution and letter of recommendation to award wi11 be
provided at the Council meeting.
- �� ��
���
&Associates;inc. infrastructure 1 Engineering 1 Planning 1 Construction 701 Xenia Avenue South
Suite 300
Minneapolis,MN 55416
Apri14, 2005 Tei:�s3-5a�-4soo
Fax:763-541-1700
Honorable Mayor and City Council
City of Rosemount
', 2$75 145th Street West
Rosemount, MN 55068
Re: Evermoor's Glendalough 5�'Addition
Street and Utility Construction and Appurtenant Work
City of Rosemount Project No. 389
WSB Project No. 1556 21
Dear Mayor and Council Members:
Bids were received for the above-referenced project on Friday, April l, 2005, and were opened
and read aloud. A total of 6 bids were received. The bids were checked for mathematical
accuracy and tabulated. The Engineer's Estimate was $862,421.75. Please find enclosed the bid
tabulation indicating the low bidder as Richard Knutson, Inc., Savage, MN, in the amount of
$831;955.26.
We recommend that the City Council consider these bids and award a contract to Richard
Knutson, Inc:,based on the results of the bids received.
Sincerely,
WSB &Associates,Inc.
�
�-
Anthony A. Aderh d,P.E.
Project Manager
Enclosure'
cc: Richard Knutson, Inc.
Cindy Dorniden, City of Rosemount
tsh
Minneapolis 1 St.Cloud
� . � � . � � � . . � . EqUB�QppOftUlll�l EfT1p��0�/Bf � . F:IWPW/M7556-271RecommendationLTR.doc �
.
� ����� /�� i � � ��i�� i �`���u�;9„�. .,,�, , o � i� �
� � i �y � /'///f// i/i i i� � e \ i� /,fi
� � � i' �� � �� �� �j r�i�� �`
� . � /
��� � '' �� ,
\� � � v � ...., �� .. ,
...:.w_ :.���.a�� .. . � � . �a�\'• . .m��.. ...c� „c�/�l,/„ya:-;...��. �5:.. �_ � ��.� _ ..k.��,. _;;,%...�a :\:'� . . ��'���,.-
PROJECT:
Evermoor's Glendalough 5th Addition
Street and Utility Construction and Appurtenant Work
City of Rosemount Project No. 389
LOCATION:
Rosemount, MN
WSB PROJECT NO.:
1556-21
Bids Opened: Friday,April 1,2005 at 10:30 a.m.
Addendum Addendum
Contractor Bid Security Total Bid
Na 1 Rec'd. No. 2 Rec'd.
1 Richard Knutson, Inc. X X X $$31;���'�,'�,
2 Contractor's Edge, lnc. X X X $��'�������3�;
3 Three Rivers Construction X X X ����;'���y��;„;
4 Arcon Construction Company, Inc. X X X $897,296.02
5 Barbarossa &Sons, Inc. X X X $915,819.53
6 Northdale Constrcution, Inc. \ X X X �����3"�����
Engineer's Opinion of Cost $862,421.75
I hereby certify that this is a true and correct tabulation of the bids as received on April 1, 2005.
Antho A.Aderhold, P.E., Project Manager
;� _;; =Denotes corrected figure
` CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2005—
A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT
FOR GLENDALOUGH 5t" ADDITION STREET AND UTILITY IMPROVEMENTS
CITY PROJECT NO. 389
WHEREAS, City Council hereby ratifies action of City Engineer to advertise for bids.
BE IT FURTHER RESOLVED, by the City Council of the City of Rosemount, Minnesota, as
follows
1. All bids on construction of Glendalough 5t" Addition Street and Utility
Improvements have been received and tabulated.
2. The bid of Richard Knutson, Inc., in the amount of$831,955.26, for the
construction of said improvements is in accordance with the plans and
specifications and advertisement for bids and is the lowest responsible bid and
shall be and hereby is accepted.
3. The Mayor and Clerk are hereby authorized and directed to enter into a contract
with said bidder for the construction of said improvements for and on behalf of
the City of Rosemount.
4. The City Clerk is hereby authorized and directed to return forthwith to all bidders
the deposits made with their bids, except that the deposit of all successful bidder
and the next two lowest bidders shall be retained until a contract has been
executed.
5. Award of the bid is contingent on the determination by the City Administrafior that
all necessary rights-of-entry or easements by deed or dedication have been
secured for construction of the improvements.
ADOPTED this 5th day of April, 2005.
William H. Droste, Mayor
ATTEST:
Linda Jentink, City Clerk
Motion by: Seconded by:
Voted in favor:
Voted against: