EXECUTIVE SUMMARY
City Council Regular Meeting: February 7, 2017
AGENDA ITEM: Professional Services Contract for
Engineering – Rosemount
Armory/Community Center Parking Lot
Improvements
AGENDA SECTION:
Consent
PREPARED BY: Dan Schultz, Parks and Recreation
Director AGENDA NO. 6.d.
ATTACHMENTS: Proposed Services Outline APPROVED BY: LJM
RECOMMENDED ACTION: Motion to recommend the City Council approve entering into a
professional services agreement with WSB to provide engineering services for the
Rosemount Armory/Community Center Parking Lot Replacement Project.
ISSUE
At the City Council meeting on Tuesday, January 17, 2016, a joint powers agreement was approved
between the Minnesota Army National Guard and the City of Rosemount to replace the shared parking
lot. The total project cost including professional services is estimated at $696,350.00. The City’s portion of
the project would cost an estimated $416,520.00 and the National Guard’s portion would cost an
estimated $279,830.00. We are at a point now where we need to move forward on the project by hiring an
engineering firm to create the final plans/specs, perform pavement and geotechnical analysis and provide
construction management.
Staff requested that WSB and Associates provide a proposal for the necessary services. WSB has assisted
City staff with the project for the last couple of years since the National Guard first requested we move
forward on the parking lot improvements. They have performed the initial inspections, continued to
monitor the conditions of the lot and created the estimates for the project. The consulting services that we
typically need for a project like this include:
Step 1 – Final Design ($32,026)
The final design work will include a survey, plans and specifications, quantity estimates, prep of
bidding documents, project meetings and project coordination.
Step 2 – Pavement and Geotechnical Analysis ($3,465)
WSB will conduct soil borings and prepare a geotechnical report for the proposed project area to
confirm the assumptions made about the pavement and subgrade conditions. Approximately ten
(10) shallow borings will be conducted throughout the site.
Step 3 – Construction Management ($25,748)
The consultant would coordinate the construction process, construction observations/inspections,
construction staking and contract administration.
The total cost of the professional services, which is included in the packet, has been submitted as an
hourly-not-to-exceed fee of $61,239, which would be shared by the City of Rosemount and Minnesota
Army National Guard.
2
SUMMARY
Staff is recommending the City Council approve entering into a professional services agreement with WSB
to provide Final Design, Pavement and Geotechnical Analysis and Construction Management for the
Minnesota Army National Guard and the City of Rosemount parking lot replacement project.
540 Gateway Boulevard | Suite 100 | Burnsville, MN 55337 | (952) 737-4660
Building a legacy – your legacy.
Equal Opportunity Employer | wsbeng.com
K:\01005-000\Admin\Docs\20170131 LTR Proposal - Community Center Parking Lot.docx
January 31, 2017
Mr. Dan Schultz
Parks and Recreation Director
City of Rosemount
13885 South Robert Trail
Rosemount, MN 55068
Re: Scope and Estimated Fee to Provide Professional Engineering Services for
Community Center Parking Lot Improvements
Dear Mr. Schultz:
We appreciate the opportunity to present this proposal for professional services related to the parking lot
improvements at the Community Center, Ice Arena, and National Guard site. This letter proposal outlines
the services for preparing plans and specifications, contract administration, and construction
management to complete the parking lot improvements.
PROJECT APPROACH/SCOPE OF SERVICES
WSB’s project scope and proposed work plan are based on our understanding of the project. In order to
complete the project, we propose the following scope of services:
Task 1: Final Design
WSB will complete the final design services, including, but not limited to:
Topographic survey
Preparation of plans and specifications
Quantity and cost estimates
Preparation of bidding documents
Project kick-off and update meetings
City coordination
Cost: $ 32,026
Task 2: Pavement and Geotechnical Analysis
WSB will conduct soil borings and prepare a geotechnical report for the proposed project area to
confirm the assumptions made about the pavement and subgrade conditions. Approximately ten (10)
shallow borings will be conducted throughout the site
Cost: $ 3,465
Task 3: Construction Management
WSB will provide construction management services, including, but not limited to:
Daily construction observation
Construction survey staking
Conduct construction meetings
Contract administration
Depending on the construction phasing which will be determined during design, we anticipate
construction to take approximately six (6) weeks.
Cost: $ 25,748
Mr. Dan Schultz
January 31, 2017
Page 2
K:\01005-000\Admin\Docs\20170131 LTR Proposal - Community Center Parking Lot.docx
SCHEDULE
WSB will complete the final design for bidding in March 2017 with construction to begin in May 2017.
PROPOSED FEE
We propose to conduct the work listed above on an hourly basis for an estimated total fee of $61,239.00.
We will review our progress weekly and will not exceed this amount without your prior approval should the
scope of the project change.
This letter represents our entire understanding of the project scope. If you are in agreement, please sign
on the space provided and return one original signed copy to us for our records. We will start
immediately upon receipt of the signed agreement.
If you have any questions concerning the work plan or fee as discussed, please feel free to contact me at
(612) 360-1315. We look forward to working with you and greatly appreciate the opportunity to assist you
and your staff in the completion of this project.
Sincerely,
WSB & Associates, Inc.
Andy Brotzler, PE Monica Heil, PE
Principal/Senior Project Manager Project Engineer
Enclosures
AB/MH/jmh
ACCEPTED BY: CITY OF ROSEMOUNT, MINNESOTA
The City of Rosemount hereby accepts the WSB & Associates, Inc. proposal for the services as
outlined above.
Signature:
Name:
Title:
Date:
Task Description11.1 Surveying 3636$5,904.001.2 Design30 40 40110$12,840.001.3 Specifications 16 16 840$4,136.001.4 Quantity Tabulations and Cost Estimate 10 1020$2,160.001.5 Meetings 4 4 412$1,496.001.6 QA / QC 66618$2,052.001.7 Bidding Preperation and Analysis 8 8 622$2,238.001.8 City Coordination2020$1,200.00Task 1 Total Estimated Hours and Fee 10 68 78 20 40 20 36 6 278 $32,026.0022.1 Field Work - Borings$2,265.002.2 Analysis and Report$1,200.00Task 2 Total Estimated Hours and Fee$3,465.0033.1 Construction Observation 180180$17,820.003.2 Surveying 2424$3,936.003.3 Contract Administration 12 12 832$3,272.003.4 City Coordination1212$720.00Task 3 Total Estimated Hours and Fee 12 12 12 8 24 180 248 $25,748.00Total Estimated Hours 10 80 90 32 40 28 60 186 526Average Hourly Billing Rate158.00 112.00 104.00 60.00 133.00 85.00 164.00 99.00Total Fee by Labor Classification $1,580.00 $8,960.00 $9,360.00 $1,920.00 $5,320.00 $2,380.00 $9,840.00 $18,414.00 $3,465.00 $61,239.00TOTAL PROJECT COST $61,239.00Construction ManagementSoil Borings & Geotechnical ReportTwo Person Survey CrewConstruction ObserverTotal HoursCostFinal DesignSoil Borings and Geotechnical ReportPrincipal Project Manager Project EngineerProject Engineer (City Billing Rate)Engineering TechnicianAdminEstimate of CostCity of Rosemount, MinnesotaProfessional Engineering ServicesCommunity Center Parking ImprovementsEstimated Hours