HomeMy WebLinkAbout6.n. Change Order #2 - Connemara Trail, Phase II, City Project 343CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: July 6, 2004 AGENDA ITEM: Change Order #2- Connemara Trail, Phase II City Project #343 AGENDA SECTION: Consent PREPARED BY: Andrew J. Brotzler, P.E., City Engineer ATTACHMENTS: Change Order #2 APPROVED BY: RECOMMENDED ACTION: MOTION TO APPROVE CHANGE ORDER #2 IN THE AMOUNT OF $184,621.00 FOR CONNEMARA TRAIL, PHASE II STREET AND UTILITY IMPROVEMENTS AND APPURTENANT WORK, CITY PROJECT #343. ACTION: BACKGROUND: For the proposed development of the Brockway site, the stormwater drainage plan includes the construction of an outlet from the site across Connemara Trail to a City pond located on the south side of Connemara Trail. The construction of the outlet will allow for the development of additional sites within the project. To accommodate the construction of the storm sewer outlet across Connemara Trail prior to the final paving of Connemara Trail, the attached change is before Council for your consideration. This will allow the work to be completed by the current Contractor for the Connemara Trail, Phase li project and will maintain the work under the 2 -year warranty period. As this outlet is necessary for the proposed Brockway Development, all costs associated with the Change Order will be paid by the Developer, CPDC. SUMMARY: Staff recommends approval of Change Order #3 for Connemara Trail, Phase II, City Project #343. B June 23, 2004 763 Ms. Cindy Dorniden City of Rosemount 2875 — 145 Street West Rosemount, MN 55068 Re: Change Order No. 2 Connemara Trail (TH 3 to Biscayne Pointe Fourth Addition) Biscayne Avenue (Plat Line to Future Connemara Trail) Street and Utility Construction and Appurtenant Work City of Rosemount Project Nos. 343 -A and 343 -C S.A.P. Nos. 208 - 104 -03 and 208 - 108 -06 WSB Project Nos. 1400 -01 and 1450 -00 Dear Ms. Dorniden: Please find enclosed Change Order No. 2 for the above - referenced project. The change order reflects an increase of $184,621.00 to the contract amount. If the attached meets with your approval, please sign and process. If you have any questions or comments regarding the enclosed, please contact me at (763) 287 -7163. Thank you. Sincerely, WSB & Associates, Inc. Mark A. Erichson, P.E. Project Manager Enclosures Ryan Contracting Company Y cc js F: IWPW1M1400 -011co 1 Ifr cty.doc Minneapolis • St. Cloud •Equal Opportunity Employer CONNEMARA TRAIL PHASE II CITY OF ROSEMOUNT CITY PROJECT NO. 343A OWNER: CITY OF ROSEMOUNT 2875 145TH STREET WEST ROSEMOUNT, MN 55068 JUNE 23, 2004 WSB PROJECT NO. 1400 -01 CONTRACTOR: RYAN CONTRACTING CO. 8700 -13TH AVENUE EAST SHAKOPEE, MN 55379 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: CONTRACT QUANTITIES ARE MODIFIED AS SHOWN ON THE ATTACHED DETAIL. IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: ORIGINAL CONTRACT PRICE: $2,427,719.39 ORIGINAL CONTRACT TIME: 6/15/2004 PREVIOUS CHANGE ORDERS: 1 TO 1 $40,670.50 NET CHANGE FROM PREVIOUS CHANGE ORDERS: N/A CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: $2,468,389.89 CONTRACT TIME PRIOR TO THIS CHANGE ORDER: 6/15/2004 NET INCREASE OF THIS CHANGE ORDER: $184,621.00 NET INCREASE OF CHANGE ORDER: N/A CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: $2,653,010.89 CONTRACT TIME WITH APPROVED CHANGE ORDERS 8/1/2004 RECOMMENDED BY: APPROVED B4 MARK A. ERICHSON, P.E., PROJECT MANAGER WSB & ASSOCIATES, INC. RYAN CMTRACTING CO. ENGINEER CONTRACTOR APPROVED BY: CITY ENGINEER CITY ADMINISTRATOR DATE OF COUNCIL ACTION FaWPWIN11400.011 FXcel1 CO- 2.xIsCO -2 t CONNEMARA TRAIL PHASE II JUNE 23, 2004 CITY OF ROSEMOUNT CITY PROJECT NO. 343A ADDITIONAL QUANTITIES Item No. Material Description No. Qty Unit Price Extended Amount 238 2021.601 REMOBILIZATION 1 LUMP SUM $19,000.00 $19,000.00 239 2104.501 REMOVE CONCRETE CURB AND GUTTER 135 LIN FT $5.00 $675.00 240 2104.503 REMOVE CONCRETE SIDEWALK 260 SO FT $1.50 $390.00 241 2104.505 REMOVE BITUMINOUS PAVEMENT 310 SO YD $2.50 $775.00 242 NEW REMOVE BITUMINOUS PATH 90 SO YD $2.50 $225.00 243 2105.522 SALVAGED SELECT GRANULAR (EV) 140 CU YD $2.00 $280.00 244 2105.522 SALVAGED AGGREGATE (EV) 100 CU YD $2.00 $200.00 245 2104.513 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) 185 LIN FT $3.00 $555.00 246 2105.522 SELECT GRANULAR BORROW (CV) 70 CU YD $15.00 $1,050.00 247 2105.525 TOPSOIL BORROW (CV) 30 CU YD $20.00 $600.00 248 2211.501 AGGREGATE BASE, CLASS 5 50 TON $15.00 $750.00 249 2350.502 TYPE MV 3 NON - WEARING COURSE MIXTURE (C) 76 TON $74.00 $5,624.00 250 2357.502 BITUMINOUS MATERIAL FOR TACK COAT 18 GAL $5.00 $90.00 251 2501.602 54" RC PIPE APRON W1 PILING 1 EACH $5,000.00 $5,000.00 252 2501.602 TRASH GUARD FOR 54" PIPE APRON 1 EACH $2,500.00 $2,500.00 253 2503.521 44" SPAN RC PIPE -ARCH SEWER, CLASS IIIA 152 LIN FT $170.00 $25,840.00 254 2503.541 54" RC PIPE SEWER, DESIGN 3006, CLASS IV 166 LIN FT $230.00 $38,180.00 255 NEW 54" RC LR BENDS, DESIGN 3006, CLASS IV 4 EACH $1,650.00 $6,600.00 256 2504.604 4" POLYSTYRENE INSULATION 35 SO YD $15.00 $525.00 257 NEW CONSTRUCT DRAINAGE STRUCTURE, 8'X 14' BOX 35.9 LIN FT $1,080.00 $38,772.00 258 NEW SLABS FOR 8'X 14' BOX MANHOLE 4 EACH $4,500.00 $18,000.00 259 2506.516 CASTING ASSEMBLY 2 EACH $350.00 $700.00 260 2511.501 RANDOM RIPRAP, CLASS IV 40 CU YD $80.00 $3,200.00 261 2511.515 GEOTEXTILE FILTER, TYPE 4 60 SO YD $1.00 $60.00 262 2521.501 4" CONCRETE WALK 260 SO FT $6.00 $1,560.00 263 2521.604 2" BITUMINOUS PATH 90 SO YD $16.00 $1,440.00 F. IWPW /NI1400- 011ExcelICO- 2.xisCO2 Detail CONNEMARA TRAIL PHASE II JUNE 23, 2004 CITY OF ROSEMOUNT CITY PROJECT NO. 3 ADDITIONAL QUANTITIES Item Material Description Qty Unit Price Extended No. No. Amount 264 2531.501 CONCRETE CURB & GUTTER DESIGN 8618 135 LIN FT $23.00 $3,105.00 265 2563.601 TRAFFIC CONTROL 1 LUMP SUM $5,500.00 $5,500.00 266 2575.501 SEEDING 0.25 ACRE $2,500.00 $625.00 267 2575.505 SODDING, TYPE LAWN 200 SQ YD $5.00 $1,000.00 268 2575.523 EROSION CONTROL BLANKET, CATEGORY 3 1200 SQ YD $1.50 $1,800.00 TOTAL ADDITIONAL QUANTITIES TOTAL INCREASE CHANGE ORDER NO. 2 $184,621.00 F. WPWIN11400- 011Excel1CO- ZxlsCO2 Detail