HomeMy WebLinkAbout6.k. Change Order #1 - 2004 Street & Utility Reconstruction, City Project 376j` CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: October 5, 2004 AGENDA ITEM: Change Order #1 — 2004 Street & Utility Reconstruction Improvements, City Project #376 AGENDA SECTION: Consent PREPARED BY: Andrew J. Brotzler, P.E., City Engineer ATTACHMENTS: Change Order #1 APPROVED BY: RECOMMENDED ACTION: MOTION TO APPROVE CHANGE ORDER #1 IN THE AMOUNT OF $47,290 FOR THE 2004 STREET AND UTILITY RECONSTRUCTION IMPROVEMENTS, CITY PROJECT #376. ACTION: BACKGROUND: This Change Order is for the maintenance of 1,300 linear feet of roadway on 140 Street adjacent to the driveway of SKB. The roadway has been damaged due to the heavy hauling traffic from the operation of SKB. The maintenance includes removal of the existing roadway and rebuilding the 1,300 -foot section to Rosemount's 9 -ton roadway design which includes 24" of select granular, 8" of Class V, 4" of bituminous base course and 2" of bituminous wear course. Staff deems this maintenance is necessary for the integrity and life span of 140 Street. All work associated with the Change Order will be paid by SKB. SUMMARY: Staff recommends approval of Change Order #1 for the 2004 Street and Utility Reconstruction Improvements, City Project #376. �� �- - - E K k I NU" CHANGE'ORDER NCO [t> a� r 1 2004 STREET AND UTILITY RECONSTRUCTION PROJECT September 17, 2004 CITY OF ROSEMOUNT, MN CITY PROJECT NO. 376 WSB PROJECT NO. 1560 -00 OWNER: CONTRACTOR: City of Rosemount 2875 145th Street West Rosemount, MN 55068 Valley Paving, Inc. 8800 - 13th Avenue East Shakopee, MN 55379 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: CONTRACT QUANTITIES ARE MODIFIED AS SHOWN ON THE ATTACHED DETAIL. CHANGE ORDER SPECIFICATIONS: ALL TRAFFIC CONTROL DEVICES AND SIGNING SHALL CONFORM TO THE MN MUTCD INCLUDING THE FIELD MANUAL FOR TRAFFIC CONTROL ZONE LAYOUTS. ALL TRAFFIC CONTROL DEVICES SHALL HAVE RETROREFLECTIVE SHEETING. ANY DETOUR SHALL REQUIRE APPROVAL FROM THE CITY ENGINEER AND 48 -HOUR WRITTEN NOTICE TO THE CITY PRIOR TO. THE STREET SECTION SHALL MEET ROSEMOUNT'S 9 -TON ROAD DESIGN. ROSEMOUNT'S STANDARD 9 -TON ROAD DESIGN IS 24" SELECT GRANULAR MATERIAL, 8" AGGREGATE BASE, CLASS V, 4" BITUMINOUS BASE COURSE (2 LIFTS), AND 2" BITUMINOUS WEAR COURSE. SILT FENCE SHALL BE PLACED AS DEEMED NECESSARY BY THE CITY ENGINEER TO CONTROL EROSION AND PROTECT THE EXISTING WETLANDS. GEOTEXTILE FABRIC SHALL BE PLACED UNDER THE SELECT GRANULAR FOR SUBGRADE SEPARATION AS DIRECTED BY THE ENGINEER. IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE. CHANGE IN CONTRACT PRICE: ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: N/A CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: NET INCREASE OF THIS CHANGE ORDER: CHANGE IN CONTRACT TIME: $971,068.12 ORIGINAL CONTRACT TIME: 9/30/2004 $0.00 NET CHANGE FROM PREVIOUS CHANGE ORDERS: N/A $971,068.12 CONTRACT TIME PRIOR TO THIS CHANGE ORDER: 9/30/2004 $47,290.00 NET INCREASE OF CHANGE ORDER: 0 Days CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: $1,018,358.12 CONTRACT TIME WITH APPROVED CHANGE ORDERS 9/30/2004 RECOMMENDED BY: APPROVED BY: ANTH NY A. ADERHOLD, P.E. WSB & ASSOCIATES, INC. VALLEY PAVING, INC. ENGINEER CONTRACTOR APPROVED BY: CITY ENGINEER CITY ADMINISTRATOR DATE OF COUNCIL ACTION CO4CO -1 Change Order No. 1 Detail 2004 STREET AND UTILITY RECONSTRUCTION PROJECT CITY OF ROSEMOUNT, MN CITY PROJECT NO. 376 ADDITIONAL QUANTITIES Item No. Description Qty Unit Price Extended Amount SCHEDULE A - SURFACE IMPROVEMENTS 110 NA RECONSTRUCT 1300 LINEAR FEET OF ROADWAY LUMP SUM 1 $47,290.00 $47,290.00 TOTAL ADDITIONAL QUANTITIES $47,290.00 TOTAL INCREASE CHANGE ORDER NO. 1 $47,290.00 CO -1C01 Detail