HomeMy WebLinkAbout6.g. Receive Bids/Award Contract - 2004 Street & Utility Reconstruction, City Project #376CITY OF ' ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: April 20, 2004
ISSUE:
Receive bids and award contract for the 2004 Street and Utility Reconstruction project.
BACKGROUND:
On Friday, April 16, 2004, bids for the referenced project will be received and read
aloud publicly. The project includes the reconstruction of City streets and utility
improvements in the subdivision located south of 145 Street Wes, north of Dodd
Boulevard, west of Shannon Parkway and east of Danville Avenue.
Costs associated with the project will be funded by special assessments, utility core
funds and street C.I.P. funds.
SUMMARY:
The tabulation of bidders, resolution and letter of recommendation to award will be
provided at the Council meeting.
AGENDA ITEM: Receive Bids /Award Contract -2004 Street &
Utility Reconstruction, City Project #376
AGENDA SECTION:
Consent
PREPARED BY: Andrew J. Brotzler, P.E., City Engineer
A
ATTACHMENTS: None.
APPROVED BY:
RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION RECEIVING BIDS
AND AWARDING CONTRACT FOR 2004 STREET AND UTILITY RECONSTRUCTION
IMPROVEMENTS, CITY PROJECT #376.
ACTION:
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2004 —
A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT
FOR THE 2004 STREET AND UTILITY RECONSTRUCTION IMPROVEMENTS
CITY PROJECT #376
BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows:
1, All bids on construction of the 2004 Street and Utility Reconstruction Improvements are
hereby received and tabulated.
2. The bid of Valley Paving, in the amount of $971,068.12 for the construction of said
improvements are in accordance with the plans and specifications and advertisement for
bids is the lowest responsible bid and shall be and hereby is accepted.
3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said
bidder for the construction of said improvements for and on behalf of the City of
Rosemount.
4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the
deposits made with their bids, except that the deposit of all successful bidder and the next
two lowest bidders shall be retained until a contract has been executed.
ADOPTED this 20 day of April, 2004.
William H. Droste, Mayor
ATTEST:
Linda Jentink, City Clerk
Motion by: Seconded by:
Voted in favor:
Voted against:
r••irr<- cry cr�r��+ e» • cam+
Alk
'ItWSB
& Associates, Inc,
April 20, 2004
WDD o: ri- 3- uk.11-11M.I 11IS—
.$ Honorable Mayor and City Council Members
Attn: Cindy Dorniden
City of Rosemount
2875 145`" Street West
Rosemount, MN 55068 -4941
Re: 2004 Rosemount Reconstruction Project
City of Rosemount Project No. 376
(.. WSB Project No. 1560 -00
f OJCGS f (I On r. LIJ4/ KID
Dear Honorable Mayor and City Council:
Bids were received for the above- referenced project on Friday, April 16, 2004, and were
opened and read aloud. A total of four bids were received. The bids were checked for
mathematical accuracy and tabulated. The Engineer's Estimate was $1,194,869,75. Please
find enclosed the bid tabulation indicating the low bidder as Valley Paving, Shakopee,
Minnesota in the amount of $971,068.12. -
F
We recommend that the City Council consider these bids and award a contract to Valley
Paving based on the results of the bids received.
., Sincerely,
<.I.,,.. WSB & Associates, Inc.
M ? Mark Erichson, P.E.
Project Manager
Enclosure
at59 Gi ' cc: Valley Pavin
MIrN way
L
Suite.. 300' r':;: ]S
inn
in
5S4� °" "
Minneapolis . St. Cloud - Equal opportunity Employer tARTW MISd6- Mr&mmdtn fthdoc
Fil"K GYJ GYJYJ4 UV • C4 WJD FIJJ1Jl11 h 1 CJ 11
I
(bJGt� ( (1 ru t'. M/M
PROJECT:
2004 Street and Utlllty Reconstruction Project
City of Rosemount
City of Rosemount Project No. 376
LOCATION:
Rosemount, MN
WSB PROJECT NO.:
1560 -00
Bids Opened: Friday, April 16, 2004 at 10:00 a.m.
Contractor Addendums Recd.
Bid Securit
Total Bid
1 Valley Paving ' N/A
X
$71,068.1
2 Northwest Asphalt, Inc. N/A
X
$9 82;105.20 '
3 McNamara Contracting, Inc. N/A
X
$1,028,546.47
4 Three Rivers Construction N /A
X
$1,077,499:92'
Engineer's Opinion of Cost
$1.194,869,75
I hereby certify that this is a true and correct tabulation of the bids as received on April 16, 2004
Mark A. Erichson, RE. Project Manager
Denotes corrected figure
Pa9Q 1 Of 1 F:IWPW►M1560- 00LeM* t158a40 Bid TabulatfonxtsSommary .