Loading...
HomeMy WebLinkAbout6.h. Receive Bids/Award Contract - Bloomfield 7th Addition Street & Utility Improvements, City Project #384CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: April 20, 2004 AGENDA ITEM: Receive Bids /Award Contract - Bloomfield 7 AGENDA SECTION: Addition Street & Utility Improvements, City Project #384 Consent PREPARED BY: Andrew J. Brotzler, P.E., City Engineer* ffgff H_ ATTACHMENTS: None. APPROVED BY: RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR BLOOMFIELD 7 ADDITION STREET AND UTILITY IMPROVEMENTS, CITY PROJECT #384. ACTION: ISSUE: Receive bids and award contract for Bloomfield 7 Addition Street and Utility Improvement project. BACKGROUND: On Friday, April 16, 2004, bids for the referenced project will be received and read aloud publiclX. This project includes the construction of streets and utilities within the Bloomfield 7 Addition development. All costs associated with the project will be funded by the Developer, Centex Homes, except for trunk utility oversizing costs. SUMMARY: The tabulation of bidders, resolution and letter of recommendation to award will be provided at the Council meeting. T + r l (0 • I CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2004 A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR THE BLOOMFIELD 7 ADDITION STREET AND UTILITY IMPROVEMENTS CITY PROJECT #384 BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: I . All bids on construction of the Bloomfield 7t Addition Street and Utility Improvements are hereby received and tabulated. 2. The bid of Ryan Contracting Company, in the amount of $689,409.80 for the construction of said improvements are in accordance with the plans and specifications and advertisement for bids is the lowest responsible bid and shall be and hereby is accepted. 3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of all successful bidder and the next two lowest bidders shall be retained until a contract has been executed. ADOPTED this 20` day of April, 2004. William H. Droste, Mayor ATTEST: Linda Jentink, City Clerk Motion by: Seconded by: Voted in favor: Voted against: Hr'K 4U - 4U%J4 UV • G4 WZ)D HJJUI.l t 1 CJ 11 ' - &AMORtia1w Inc. April 20, 2004 Honorable Mayor and City Council Members Attn: Cindy Dorniden ' City of Rosemount 2875 145' Street West .. Rosemount, MN 55068 -4941 �' .. Re: Bloomfield 7' Addition City of Rosemount Pro ject No. 384 '9 L WSB Project No. 2012 -80 (OJG0 ( (1 (U r. F'eluz> •! ' �' bear Honorable Mao City • :� . ; �� Mayor and Ci C Bids were received for the above - referenced project on Friday, 16, 2004 V.�•..; P J ya p and were a opened and read aloud. A total of 11 bids were received. The bids were checked for mathematical accuracy and tabulated. The Engineer's Estimate was $802 Please find enclosed the bid tabulation indicating the love bidder as Ryan Contracting Company, Shakopee, Minnesota in the amount of $689,409.80. n We recommend that the City Council consider these bids and award a contract to Ryan Contracting Company based on the results of the bids received. ' Sincerely, WSB & Associates, Inc. I Mark Erichson, P.E. Project Manager ! ,�, I% !. oV* z" Enclosure a 415(7 F . ''�� ., cc: Ryan Contracting Company Memor . Fgh�yay js Suitg Inn in j; 763 Minneapolis • St Cloud • Equal Opportunity Employer FAWPWMZVJz Ht'K CtO CIOl04 F77 � C4 W5t5 � HJJIJl..1 H I C5 11V1,. (bJCtj ((1 (17 t''. 47,5/b5 PROJECT: Bloomfield 7th Addition City of Rosemount, MN City Project No. 384 LOCATION: Rosemount, MN WS13 PROJECT NO(S).: 2012.80 BIDS OPENED; Fri day, April 16, 2004 at 10:00 a.m. Contractor Addendum(s) Bid Security Total Bid 1 Ryan Contracting Company N /A X $689,409.80 2 Redstone Construction N/A X $731,268.63 3 Erickson Construction N/A x . . . 4 Construction Co., Inc. N/A x ., . .$732,871,90 Nodland $749,376.05 5 Northdale Construction Co., Inc. NIA X $759,756.57 6 Contractors Edge, Inc. N/A X $760,264.37 7 Northwest Asphalt, Inc. NIA X .. $780,281 o 8 Three Rivers Construction N/A X $790,790.14 9 Barbarosa and Sons, Inc. N/A X $792,308.13 10 Kusske Construction, Inc. N/A X $793,225.85 11 Arcon Construction Co. N/A X $818,690.85 Engineer's Opinion of Cost $802,032.60 I hereby certify that this is a true and correct tabulation of the bids as received on April 16, 2004. Mark Erichson, P.E., Project Manager DENOTES CORRECTED FIGUR!! F.•IWPWI'M2012- 86WXC@AM2 -80 BidTeb.xls