HomeMy WebLinkAbout6.h. Receive Bids/Award Contract - Bloomfield 7th Addition Street & Utility Improvements, City Project #384CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: April 20, 2004
AGENDA ITEM: Receive Bids /Award Contract - Bloomfield 7
AGENDA SECTION:
Addition Street & Utility Improvements, City Project #384
Consent
PREPARED BY: Andrew J. Brotzler, P.E., City Engineer*
ffgff H_
ATTACHMENTS: None.
APPROVED BY:
RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION RECEIVING BIDS
AND AWARDING CONTRACT FOR BLOOMFIELD 7 ADDITION STREET AND
UTILITY IMPROVEMENTS, CITY PROJECT #384.
ACTION:
ISSUE:
Receive bids and award contract for Bloomfield 7 Addition Street and Utility
Improvement project.
BACKGROUND:
On Friday, April 16, 2004, bids for the referenced project will be received and read
aloud publiclX. This project includes the construction of streets and utilities within the
Bloomfield 7 Addition development. All costs associated with the project will be
funded by the Developer, Centex Homes, except for trunk utility oversizing costs.
SUMMARY:
The tabulation of bidders, resolution and letter of recommendation to award will be
provided at the Council meeting.
T + r l (0 • I
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2004
A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT
FOR THE BLOOMFIELD 7 ADDITION STREET AND UTILITY IMPROVEMENTS
CITY PROJECT #384
BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows:
I . All bids on construction of the Bloomfield 7t Addition Street and Utility Improvements
are hereby received and tabulated.
2. The bid of Ryan Contracting Company, in the amount of $689,409.80 for the
construction of said improvements are in accordance with the plans and specifications
and advertisement for bids is the lowest responsible bid and shall be and hereby is
accepted.
3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said
bidder for the construction of said improvements for and on behalf of the City of
Rosemount.
4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the
deposits made with their bids, except that the deposit of all successful bidder and the next
two lowest bidders shall be retained until a contract has been executed.
ADOPTED this 20` day of April, 2004.
William H. Droste, Mayor
ATTEST:
Linda Jentink, City Clerk
Motion by: Seconded by:
Voted in favor:
Voted against:
Hr'K 4U - 4U%J4 UV • G4 WZ)D HJJUI.l t 1 CJ 11
'
-
&AMORtia1w Inc.
April 20, 2004
Honorable Mayor and City Council Members
Attn: Cindy Dorniden
'
City of Rosemount
2875 145' Street West
..
Rosemount, MN 55068 -4941
�' ..
Re: Bloomfield 7' Addition
City of Rosemount Pro ject No. 384
'9 L
WSB Project No. 2012 -80
(OJG0 ( (1 (U r. F'eluz>
•! ' �' bear Honorable Mao City • :� . ; �� Mayor and Ci C
Bids were received for the above - referenced project on Friday, 16, 2004
V.�•..; P J ya p and were
a opened and read aloud. A total of 11 bids were received. The bids were checked for
mathematical accuracy and tabulated. The Engineer's Estimate was $802 Please
find enclosed the bid tabulation indicating the love bidder as Ryan Contracting Company,
Shakopee, Minnesota in the amount of $689,409.80.
n
We recommend that the City Council consider these bids and award a contract to Ryan
Contracting Company based on the results of the bids received.
' Sincerely,
WSB & Associates, Inc.
I Mark Erichson, P.E.
Project Manager
! ,�, I%
!.
oV* z" Enclosure
a 415(7 F . ''��
., cc: Ryan Contracting Company
Memor . Fgh�yay
js
Suitg
Inn
in
j;
763 Minneapolis • St Cloud • Equal Opportunity Employer FAWPWMZVJz
Ht'K CtO CIOl04 F77 � C4 W5t5 � HJJIJl..1 H I C5 11V1,. (bJCtj ((1 (17 t''. 47,5/b5
PROJECT:
Bloomfield 7th Addition
City of Rosemount, MN
City Project No. 384
LOCATION:
Rosemount, MN
WS13 PROJECT NO(S).:
2012.80
BIDS OPENED;
Fri day, April 16, 2004 at 10:00 a.m.
Contractor
Addendum(s)
Bid Security Total Bid
1 Ryan Contracting Company
N /A
X
$689,409.80
2 Redstone Construction
N/A
X
$731,268.63
3 Erickson Construction
N/A
x
. . .
4 Construction Co., Inc.
N/A
x
., . .$732,871,90
Nodland
$749,376.05
5 Northdale Construction Co., Inc.
NIA
X
$759,756.57
6 Contractors Edge, Inc.
N/A
X
$760,264.37
7 Northwest Asphalt, Inc.
NIA
X
.. $780,281 o
8 Three Rivers Construction
N/A
X
$790,790.14
9 Barbarosa and Sons, Inc.
N/A
X
$792,308.13
10 Kusske Construction, Inc.
N/A
X
$793,225.85
11 Arcon Construction Co.
N/A
X
$818,690.85
Engineer's Opinion of Cost
$802,032.60
I hereby certify that this is a true and correct tabulation of the bids as received
on April 16, 2004.
Mark Erichson, P.E., Project Manager
DENOTES CORRECTED FIGUR!!