Loading...
HomeMy WebLinkAbout6.j. Final Payment - Portable Generator & Lift Station Revisions, City Project #366i CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: April 20, 2004 AGENDA ITEM: Final Payment — Portable Generator and Lift Station Revisions, City Project #366 AGENDA SECTION: Consent PREPARED BY: Andrew J. Brotzler, P.E., City Engineer 1 f" IC I T U DA #6 , ATTACHMENTS: Final Pay Voucher APPROVE BY: RECOMMENDED ACTION: MOTION TO APPROVE THE FINAL PAY VOUCHER IN THE AMOUNT OF $4,622 TO SYSTEMS BY DESIGN FOR THE PORTABLE GENERATOR AND LIFT STATION REVISIONS, CITY PROJECT #366. ACTION: ISSUE: Authorizing final payment for a portable generator and lift station revisions. BACKGROUND: On November 18, 2002 the Rosemount Utility Commission authorized the preparation of plans and specifications for a portable generator and lift station revisions. This generator replaced an existing outdated generator and retrofitted the electrical receptacles at the City's wells, sanitary sewer lift stations and storm sewer lift stations. On February 10, 2003 the Commission reviewed the plans and specifications and authorized the advertisement of bids. The bids were received and awarded by City Council on March 20, 2003. As per the attached Final Pay Voucher, signed by the Contractor and Consulting Engineer, Paul Kaeding, the work has been completed and final payment is being requested by Systems by Design in the amount of $4,622.00. SUMMARY: Staff is recommending final payment to Systems by Design in the amount of $4,622 for the Portable Generator /Lift Station Revisions, City Project #366. } Contractor's A Application Period: 1 ! 7 O I , From ( qn F'F STi9�'T� l Srvtt Contract 0 O tract No.: 2ACTOR'S CERTIFICATION idersigned Centracbr certifiers U (1) all previous progress payments d from Owner on account of Wak dale Under the Contract have been applied xnt tO tfscharge Contractors legitimale obligatiom incurred in connection with xtvered by prior Applications for Payment (2) fine of all Work. rnaWals and NIA incorperatrd. in Said Work or otherwise listed in of covered by this 16on tier Payment will pass to Owner at time of payment free and clear of all security interests and encumbrances (except such as are covered by a Bond able to Owner indemnitybg Owner against any such Liens. security interest or brances); and (3) all Work covered by this Application for Payment is in ante with the Contract Documents and is not detective. licatian For Pa 12"4: ent __ p �t GY1 ORIGINAL CONTRACT PRICE....._..._.__. ..........._................._. Net atiangs by Change Orders .... _._..._ .......... _. .......... _. .......... b CURRENT CONTRACT PRICE (Una 1 1 2) ...... . . . ........... . . TOTAL COMPLETED AND STORED TO DATE (Column F on Progress Estimate) ............. . ... _... ...... ........... $ ! oC Y—� . 0 RETAtNAGE_ — a. %X S Work Co ntpleted ..... . ............. b d b. — % x S Stored Material ..... .. .......... .`.. b c Total Retainage (Line Sa + Line Sb) ........... .. .......... _ .......... ...... S AMOUNT ELIGIBLE TO DATE (Line 4 - Line 5c) ......... __ ..... ........ LESS PREVIOUS PAYMENTS (l.lrtie 6 from prior Application) ...... AMOUNT DUE THIS APPLI CAT3 0N .............. . ........ _._ ........ _ ......... _ S � CPO BALANCE TO FINISH. PLUS RETAINAGE (Colurnn G an Progress Estimate + Line 5 above) ......... _...... Payment of: S �1 e-0 „ 130 (Li or o r - attta tion Of QT un t) Is recommended by, L,i (Engineer) (� (Date) Payment of: S _ /(Line 814 other - attach exolanation h hthp arnn tl is approved by. Approved by: __­ 1 - CDC No. C-620 (2002 Edition) •- _ ++ .ti_ c_, .,.,• t�� ,� r „�t,�.r n rr.nrots Committre and endarsed by the Associated Geveral Contractors of America and the Conrlrvction Spetifintioss Institute- i n b- . (Date) Page 1 of r c c C1 CZ --v 0 N :ATION FOR PAYMENT Funding Agency (f applicabie) Progress Estimate Contractor's Applicatic'n For (contract): / , _ - j)£V/ 4/ 5 - p pplication Number: PPlication Period: ! �v aZ ! 9 ppiication Date: A B C D E F G Item Bid Quantity Unit Price Bid Value Estimated Quantity Installed Value Materials Presently Stored not in C Total Completed and Stored to Date D{ E % (E) B Balance to Finish B- F Bid Item No. Description Totals / ' Z Met, O EJCDC No. C-620 (2002 Edition) Page 11 of Prepared by the Engineers' Joint Contract Documents Committeewnd endorsed by the Associated Central Contractors of America and the Construction Specifications Institute.