Loading...
HomeMy WebLinkAbout6.i. Order Project and Authorize Preparation of Plans & Specifications - Trunk ighway 3 (Connemara Trail to County Road 38) Improvements, City Project 385CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: January 20, 2004 In October 2002, the City of Rosemount submitted to Mn/DOT a request for funding through the Mn/DOT Municipal Agreement Program to make improvements to Trunk Highway 3 between Connemara Trail and McAndrews Road (CSAH 38). The proposed improvements include the construction of a signal system on Trunk Highway 3 at Connemara Trail; turn lane improvements on Trunk Highway 3 at 132" d Street (CR 38); and a signal system and intersection improvements at Trunk Highway 3 and McAndrews Road (CSAH 38). Attached is a letter dated January 13, 2004 from Mn/DOT approving the City of Rosemount's request for funding up to a maximum amount of $467,300 as part of the Municipal Agreement Program. The total estimated project cost is $823,500. The remaining project cost will be funded with City Municipal State Aid funds and Dakota County funds. " At this time, Staff is requesting Council order the project and authorization to prepare plans and specifications for the project. RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION ORDERING THE PROJECT AND ORDERING THE PREPARATION OF PLANS AND SPECIFICATIONS FOR TRUNK HIGHWAY 3 (CONNEMARA TRAIL TO COUNTY ROAD 38) IMPROVEMENTS, CITY PROJECT #385. COUNCIL ACTION: AGENDA ITEM: Order Project and Authorize Preparation of Plans AGENDA SECTION: & Specifications — Trunk Highway 3 (Connemara Trail to County New Business Road 38) Improvements, City Project #385 PREPARED BY: Andrew J. Brotzler, P.E., City Engineer A ° ATTACHMENTS: Resolution, Letter from MnDOT APPROVED BY: CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2004— A RESOLUTION ORDERING THE PROJECT, AND ORDERING THE PREPARATION OF PLANS AND SPECIFICATIONS FOR TRUNK HIGHWAY 3 (CONNEMARA TRAIL TO COUNTY ROAD 38) IMPROVEMENTS CITY PROJECT #385 WHEREAS, the City Council of the City of Rosemount is interested in the safety of its residents; and WHEREAS, the City Council of the City of Rosemount deems it necessary to construct improvements on Trunk Highway 3 between Connemara Trail and McAndrews Road (CSAH 38) for the safety and welfare of the population, and WHEREAS, the funding for the Trunk Highway 3 Improvements will be from Mn/DOT Cooperative Agreement funds, City Municipal State Aid funds and Dakota County funds. NOW THEREFORE BE IT RESOLVED, that the City Council of the City of Rosemount orders City Project #385, Trunk Highway 3 (Connemara Trail to County Road 38) Improvements NOW THEREFORE BE IT FURTHER RESOLVED, by the City Council of the City of Rosemount hereby orders the preparation of plans and specifications for the Trunk Highway 3 (Connemara Trail to County Road 38) Improvements, City Project #385. ADOPTED this 20 day of January, 2004. William H. Droste, Mayor ATTEST: Linda Jentink, City Clerk Motion by: Seconded by: Voted in favor: Voted against: 4 "` Minnesota Department of Transportation 0 Metro District Office Tel: 651 - 582 -1661 s �T OF ' rll Office of State Aid Office Fax: 651 - 582 -1368 1500 West County Road B2 E -mail: mike.kowski @dot.state.mn.us Roseville, MN 55113 -3174 January 13, 2004 Mr. Andrew Brotzler City Engineer 2875-145 th Street West Rosemount, MN 55068 -4997 RE: Request for Cooperative Agreement Funding TH 3 from Connemara Trail to CSAH 38 In the City of Rosemount Dear Mr. Brotzler: I am writing to inform you of the decision reached January 8, 2004 by the Fiscal Year (FY) 2005 Municipal Agreement Program Selection Committee regarding the above referenced project. After considering the 30 candidates submitted for inclusion in the FY 2005 Program, the Selection Committee has decided to grant your request for funding up to a maximum contribution by Mn/DOT of $467,300 (this includes $34,575 for use toward Construction Engineering & Inspection). This is the maximum amount of Mn/DOT Cooperative Agreement funding available for this project and it is available only for use on construction items that can be justified in accordance with the Mn/DOT Cost Participation Policy. If the cost of eligible items falls below this maximum amount the funds awarded will be reduced to match the cost of the eligible items. For a description of eligible items please refer to the Mn/DOT Cost Participation Policy. This policy can be viewed at: http: / /www.dot.state.mn.us /metro /stateaid /fto /dsI 1.12df To receive the funds, this project must be let by June 30` 2005. After that date the money becomes unavailable. As a condition of the Municipal Agreement Program it is the responsibility of the local government agency to develop a complete set of construction plans & specifications for the project as well as acquiring any Right -of -Way necessary to construct the job. Pursuant to the acquisition of R/W for this project, the local government agency will be solely responsible for any costs associated with obtaining the property as well as any legal actions resulting from the acquisition of said property. An equal opportunity employer Mr. Andrew Brotzler Page 2 January 13, 2004 Before this project can officially become part of the FY 2005 Municipal Agreement Program, I will need to receive a written confirmation from the City of Rosemount accepting the tentative funding level as well as the design and R/W conditions. Please return this confirmation to me by February 6, 2004. After receiving your response I will be assigning a specific Project Manager to this job, until that time please direct all comments and questions to me. i4 - Michael P. Kowski, P.E. Cooperative Agreement Engineer cc: Bob Brown, Mn/DOT -Metro State Aid Lisa Freese, Mn/DOT -Area Manager Charles Rickart, WSB & Associates, Inc. Project File