HomeMy WebLinkAbout6.i Receive Bids/Award Contract-Biscayne Point North, City Project #370CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE May 18, 2004
AGENDA ITEM: Receive Bids /Award Contract- Biscayne
AGENDA SECTION:
Pointe North Addition Street & Utility Improvements, City Project
Consent
#370
PREPARED BY: Andrew J. Brotzler, P.E., City Engineer
A O- "
ATTACHMENTS: None.
APPROVED BY:
RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION RECEIVING BIDS
AND AWARDING CONTRACT FOR BISCAYNE POINTE NORTH ADDITION STREET
AND UTILITY IMPROVEMENTS, CITY PROJECT #370.
ACTION:
ISSUE:
Receive bids and award contract for Biscayne Pointe North Addition Street and Utility
Improvement project.
BACKGROUND:
On Friday, May 14, 2004, bids for the referenced project will be received and read
aloud publicly. This project includes the construction of streets and utilities within the
Biscayne Pointe North Addition development. All costs associated with the project will
be funded by the Developer, Giles Properties, except for trunk utility oversizing costs.
SUMMARY:
The tabulation of bidders, resolution and letter of recommendation to award will be
provided at the Council meeting.
j
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2004 —
A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT
FOR BISCAYNE POINTE NORTH STREET AND UTILITY IMPROVEMENTS, PHASE II
CITY PROJECT #370
BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows:
1. All bids on construction of the Biscayne Pointe North Street and Utility Improvements
are hereby received and tabulated.
2. The bid of Erickson Construction, Inc.., in the amount of $327,039.89 for the
construction of said improvements are in accordance with the plans and specifications
and advertisement for bids is the lowest responsible bid and shall be and hereby is
- accepted.
3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said
bidder for the construction of said improvements for and on behalf of the City of
Rosemount.
4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the
deposits made with their bids, except that the deposit of all successful bidder and the next
two lowest bidders shall be retained until a contract has been executed.
ADOPTED this 18t day of May, 2004.
William H. Droste, Mayor
ATTEST:
Linda Jentink, City Clerk
Motion by: Seconded by:
Voted in favor:
Voted against:
MAY -18 -2004 09:33 WSB & RSSUC I RTES INC. '16.5�eHY Veld H. 02/ 15
WS
' & Associates, Inc.
May 1 8, 2004
Honorable Mayor and City Council Members
Attn: Cindy Dorniden
City of Rosemount
2875 145' Street West
Rosemount, MN 55068 -4941
Re: Biscayne Pointe North Addition
City of Rosemount Project No. 370
WSB Project No. 1577 -00
;',• :.: °.:
Dear Honorable Mayor and City Council:
Bids were received for the above - referenced project on Friday, May 14, 2004, and were
opened and read aloud. A total of 8 bids were received. The bids were checked for
mathematical accuracy and tabulated. The Engineer's Estimate was $369,781.50. Please
find enclosed the bid tabulation indicating the low bidder as Erickson Construction, Inc.,
Burnsville, Minnesota in the amount of $327,039.89.
We recommend that the City Council consider these bids and award a contract to Erickson
Construction, Inc, based on the results of the bids received.
;r
Sincerely,
WSB & Associates, Inc.
Mark Erickson, P.E.
Project Manager
Enclosure
415p .olsQil
cc: Erickson Construction, Inc.
Memorl#.Highway
Suite 300:..
�S
,� Minneapaius,.' •.
;�
�i5422 • ,
7fi3.541`;.O$ O
F:IWPWINI1577 00lrecmmd1n hr.doc
• 763,54( -&7Q0 - -FAX
Minneapolis - 5t. Cloud - Equal opportunity Employer
MAY -18 - 2004 09:33 W5B & R55UC 1 H I E5 INC. F. 0.5/15
1
PROJECT:
Biscayne Pointe North Addition
Street and Utility Construction and Appurtenant Work
City of Rosemount Project No. 370
LOCATION:
Rosemount, MN
WSB PROJECT NO.:
1577 -00
Bids Opened: Friday, May 14, 2004 at 10:00 a.m.
Contractor Addendums Recd.
Bid Security
Total Bid
1 Erickson Construction, Inc.
N/A
X
$327,039.89
2 Contractors Edge, Inc.
NIA
X
$341;035.73
3 Minger Construction, Inc.
N/A
X
$349,647.07
4 Ryan Contracting Co.
N/A
X
$396,998.05
5 Friedges Contracting Co., LLC
NIA
X
$386,837.42
6 Frontier Construction Co., Inc.
N/A
X
$388,165.58
7 Burschville Construction, Inc.
N/A
X
$410,087..21
8 Northdale Construction Co., Inc.
N/A
X
$419,986.50
Engineer's Opinion of Cost
$369,781.50
1 hereby certify that this is a true and correct tabulation of the bids as received on May 14, 2004.
Mark A. Erichson, P,E., Project Manager
DENOTES CORRECTED FIGURE
FAWPW 1613 7-"ZXCELifrn rta 91d rxb x1r.