HomeMy WebLinkAbout6.g. Change Order #1 - Well #12, City Project #354CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: May 18, 2004
AGENDA ITEM: Change Order #1 —Well #12,
City Project #354
AGENDA SECTION:
Consent
PREPARED BY: Andrew J. Brotzler, P.E., City Engineer
D
ATTACHMENTS: Change Order #1
APPRO Y:
RECOMMENDED ACTION: MOTION TO APPROVE CHANGE ORDER #1 FOR WELL
#12, CITY PROJECT #354, AND AUTHORIZE THE NECESSARY SIGNATURES.
ACTION:
ISSUE:
This Change Order reflects the protection of Well #12 currently under construction.
BACKGROUND:
Change Order #1 for Well #12, City Project #354 is for the capping of the test well hole
previously contracted adjacent to the proposed new well.
This Change Order in the amount of $1,490 will result in a revised contract amount of
$221,606.00_
SUMMARY:
Staff is recommending that the City Council make a motion to approve Change Order
#1 in the amount of $1,490 for Well #12, City Project #354.
iiden
ant
eet West
1 55068
Order No. 1
al Production Well No. 12
:osemount Project No. 354
aject Nos. 1391 -02
3en:
used Change Order No. 1 for the above- referenced project. The change
increase of $1,490.00 to the contract amount. The change order has been
,reed upon by the contractor and we hereby recommend that the City of
-ove Change Order No. 1 for E. H. Renner and Sons, Inc.
questions or comments regarding the enclosed, please contact me at (763)
ik you.
ites, Inca
'.E.
inner, E. H. Renner and Sons, Inc.
Minneapolis • St. Cloud • Equal Opportunity Employer F WPW/M1391 -Mw t lrraty.doc
MUNICIPAL PRODUCTION WELL NO. 12
CITY OF ROSEMOUNT, MN
CITY PROJECT NO. 354
WSB PROJECT NO. 1391-02
OWNER:
CITY OF ROSEMOUNT
2875145TH STREET WEST
ROSEMOUNT, MN 55068 -4941
APRIL 26, 2004
CONTRACTOR:
E. H. RENNER AND SONS, INC.
15688 NW JARVIS STREET
ELK RIVER, MN 55330
YOU ARE DIRECTED TO MAKE THE FOLLOWING MODIFICATIONS IN THE CONTRACT DOCUMENT DESCRIPTION:
The following changes to the contract documents are modified as shown on the attached detail. The quantities reflect the following changes:
1. Sealing of existing test boring located near Municipal Well No. 12 to protect the new well.
IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR
FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE.
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME:
ORIGINAL CONTRACT PRICE: $220,116.00 ORIGINAL CONTRACT TIME: 8/2/2004
PREVIOUS CHANGE ORDERS: N/A $0.00 NET CHANGE FROM PREVIOUS CHANGE ORDERS: NONE
CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: $220,116.00 CONTRACT TIME PRIOR TO THIS CHANGE ORDER: 8/2/2004
NET INCREASE OF THIS CHANGE ORDER: $1,490.00 NET INCREASE OF CHANGE ORDER: 7
CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: $221,606.00 CONTRACT TIME WITH APPROVED CHANGE ORDERS 8/9/2004
RECOMMENDED BY: APPROVED BY:
.v ..I
NANCY Z$IGLER, P.. ., PR ECT ANAGER CONTRACTOR SIGNATURE
WSB & ASSOCIATES, INC. E. H. RENNER AND SONS
CONTRACTOR
APPROVED BY:
CITY ENGINEER
MAYOR
CITY ADMINISTRATOR DATE
F. I WPW/M 1231 -161 EXCEL I CO-1. xis I C 0-1
wk"�
,, • CHANGE RDER:NO�1 DETi41 :.��'t
APRIL 26, 2004
MUNICIPAL PRODUCTION WELL NO, 12
CITY OF ROSEMOUNT, MN
CITY PROJECT NO. 354
WSB PROJECT NO. 1391 -02
ADDITIONAL QUANTITIES
ITEM NO. DESCRIPTION QTY UNIT PRICE TOTAL
22 SEAL EXISTING TEST BORINGS 1 LUMP SUM $1,490.00 $1,490,00
TOTAL ADDITIONAL CONTRACT QUANTITIES $1,490.00