Loading...
HomeMy WebLinkAbout6.g. Change Order #1 - Well #12, City Project #354CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: May 18, 2004 AGENDA ITEM: Change Order #1 —Well #12, City Project #354 AGENDA SECTION: Consent PREPARED BY: Andrew J. Brotzler, P.E., City Engineer D ATTACHMENTS: Change Order #1 APPRO Y: RECOMMENDED ACTION: MOTION TO APPROVE CHANGE ORDER #1 FOR WELL #12, CITY PROJECT #354, AND AUTHORIZE THE NECESSARY SIGNATURES. ACTION: ISSUE: This Change Order reflects the protection of Well #12 currently under construction. BACKGROUND: Change Order #1 for Well #12, City Project #354 is for the capping of the test well hole previously contracted adjacent to the proposed new well. This Change Order in the amount of $1,490 will result in a revised contract amount of $221,606.00_ SUMMARY: Staff is recommending that the City Council make a motion to approve Change Order #1 in the amount of $1,490 for Well #12, City Project #354. iiden ant eet West 1 55068 Order No. 1 al Production Well No. 12 :osemount Project No. 354 aject Nos. 1391 -02 3en: used Change Order No. 1 for the above- referenced project. The change increase of $1,490.00 to the contract amount. The change order has been ,reed upon by the contractor and we hereby recommend that the City of -ove Change Order No. 1 for E. H. Renner and Sons, Inc. questions or comments regarding the enclosed, please contact me at (763) ik you. ites, Inca '.E. inner, E. H. Renner and Sons, Inc. Minneapolis • St. Cloud • Equal Opportunity Employer F WPW/M1391 -Mw t lrraty.doc MUNICIPAL PRODUCTION WELL NO. 12 CITY OF ROSEMOUNT, MN CITY PROJECT NO. 354 WSB PROJECT NO. 1391-02 OWNER: CITY OF ROSEMOUNT 2875145TH STREET WEST ROSEMOUNT, MN 55068 -4941 APRIL 26, 2004 CONTRACTOR: E. H. RENNER AND SONS, INC. 15688 NW JARVIS STREET ELK RIVER, MN 55330 YOU ARE DIRECTED TO MAKE THE FOLLOWING MODIFICATIONS IN THE CONTRACT DOCUMENT DESCRIPTION: The following changes to the contract documents are modified as shown on the attached detail. The quantities reflect the following changes: 1. Sealing of existing test boring located near Municipal Well No. 12 to protect the new well. IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: ORIGINAL CONTRACT PRICE: $220,116.00 ORIGINAL CONTRACT TIME: 8/2/2004 PREVIOUS CHANGE ORDERS: N/A $0.00 NET CHANGE FROM PREVIOUS CHANGE ORDERS: NONE CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: $220,116.00 CONTRACT TIME PRIOR TO THIS CHANGE ORDER: 8/2/2004 NET INCREASE OF THIS CHANGE ORDER: $1,490.00 NET INCREASE OF CHANGE ORDER: 7 CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: $221,606.00 CONTRACT TIME WITH APPROVED CHANGE ORDERS 8/9/2004 RECOMMENDED BY: APPROVED BY: .v ..I NANCY Z$IGLER, P.. ., PR ECT ANAGER CONTRACTOR SIGNATURE WSB & ASSOCIATES, INC. E. H. RENNER AND SONS CONTRACTOR APPROVED BY: CITY ENGINEER MAYOR CITY ADMINISTRATOR DATE F. I WPW/M 1231 -161 EXCEL I CO-1. xis I C 0-1 wk"� ,, • CHANGE RDER:NO�1 DETi41 :.��'t APRIL 26, 2004 MUNICIPAL PRODUCTION WELL NO, 12 CITY OF ROSEMOUNT, MN CITY PROJECT NO. 354 WSB PROJECT NO. 1391 -02 ADDITIONAL QUANTITIES ITEM NO. DESCRIPTION QTY UNIT PRICE TOTAL 22 SEAL EXISTING TEST BORINGS 1 LUMP SUM $1,490.00 $1,490,00 TOTAL ADDITIONAL CONTRACT QUANTITIES $1,490.00 NET TOTAL CHANGE ORDER NO. 1 $1,490.00 F: IWPW IN11231- 161ExceACO- 1.x/sICO1 Detail