HomeMy WebLinkAbout6.i. Mineral Extraction Permit for Furlong / Ames Constructioni
f
CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
City Council Meeting Date: February 17, 2004
Applicant & Property Owner: Ames Construction/ Torn Furlong
Location: 1/4 mile south of CSAH 42/TH 55, West side of Fischer Ave.
Area in Acres: 79.94 total
Comp. Guide Plan Desig: AG - Agriculture
Current Zoning: AG Agriculture
Planning Commission Action: Recommended Approval to CC 4 -0 on 1 -27 -04
SUMMARY
Ames Construction is requesting that the mineral extraction permit for this property be renewed for 2004. Tom
Furlong will continue to assume the dual responsibilities of owner /operator. No material was reported to have
been extracted from the pit in 2003.
This request is subject to the conditions outlined in the attached permit. In addition to these specific conditions,
all mineral extraction permits are subject to the general performance standards outlined in Section 12.4 of the
Zoning Ordinance. The Planning Commission reviewed these standards, police records, and the information
submitted by the applicant during a public hearing on January 27, 2004. Based on that information, the
Planning Commission recommended 4 -0 that the City Council renew the Furlong Mineral Extraction Permit for
the period from January 1, 2004 to December 31, 2004.
,
SITE MAP
PROPERTY ID NUMBER: 34- 02800- 010 -85
2003 ESTIMATED MARKET VALUES (PAYABLE 2004) 2003 BUILDING INFORMATION (PAYABLE 2004):
FEE OWNER: THOMAS & CARRIE TSTE FURLONG
LAND: = LOT SIZE NO DATA AVAILABLE
COMMON NAME: FURLONG GRAVEL PIT
BUILDING:
14080 FURLONG TRL
TOTAL: JIMI 3,482,369 TOTAL SO FT
HASTINGS MN 55033 -8523
79.94 TOTAL ACRES
SCHOOL DISTRICT: 196 87,117 ROAD R/W SO FT
PAYABLE 2003 TAXES
LOCATION: SE1l4 SE114 SECTION 28- 115 -18
NET TAX:
SPECIAL ASSESSMENTS: 000
PAYABLE 2004 HOMESTEAD STATUS: FULL HOMESTEAD
TOTAL TAX & SA:
WATERSHED DISTRICT: VERMILLION RIVER
PAYABLE 2004 ASMNT USAGE:AG -GREEN ACRES
RESIDENTIAL
LAST QUALIFIED SALE:
,
NOTE: Dimensions rounded to nearest foot
Copyright 2003, Dakota County -
DATE: AMOUNT:
10 qj
L Q
-'H . 5 S
This drawing is neither a legally recorded map nor a survey and is not intended to be used as one.
This drawing is a compilation of records, information and data located in various city, county, and
state offices and other sources, affecting the area shown, and is to be used for reference purposes
only. Dakota County is not responsible for any inaccuracies herein contained. If discrepancies are
found, please contact Dakota County Survey and Land Information Department,
Map Date: April 11, 2003 Parcels Updated: 4132003 Aerial Photography: 1990
PLAT NAME: - SECTION 28 TWN 115 RANGE 18 I v
TAX DESCRIPTION: E 12 OF SE 1/4
080000 2811518
Z
0
7i
Za
7
l A R -A �
J
LL
NOTE: Dimensions rounded to nearest foot
Copyright 2003, Dakota County -
DATE: AMOUNT:
10 qj
L Q
-'H . 5 S
This drawing is neither a legally recorded map nor a survey and is not intended to be used as one.
This drawing is a compilation of records, information and data located in various city, county, and
state offices and other sources, affecting the area shown, and is to be used for reference purposes
only. Dakota County is not responsible for any inaccuracies herein contained. If discrepancies are
found, please contact Dakota County Survey and Land Information Department,
Map Date: April 11, 2003 Parcels Updated: 4132003 Aerial Photography: 1990
PLAT NAME: - SECTION 28 TWN 115 RANGE 18 I v
TAX DESCRIPTION: E 12 OF SE 1/4
080000 2811518
�l�ILliII[:i4'sidA'3: 7.7.�iL��cs�
JAN 16 2004 3:35 PM FR AMES BURNSVILLE 552 435 7142 TO 6514234424 P.32,
March. 31, 2003
Jason Lindahl
City of Rosemount
2875 — 145` Street West
Rosemount, Mn 55068
Dear Jason,
Please note that Ames had not extracted any material in 2003 frori the Furlong site and
or from the Ped site,
Additionally, the surety bonds and insurance bonds for both sites ri11 be renewed.
(87500 per acre).6
Please let me know if you need additional information. I greatly reciate yo
ap'p' ur
assistance.
Sincer
Pa 'c ason
Ames Construction
,I,- TnTnI on, n'7 --
Mineral Extraction Permit
2004 Conditions For Mineral Extraction Permit Renewal
TOM FURLONG
A. Tom Furlong (hereinafter referred to as "the Property Owner ") shall sign a written consent
to these conditions binding himself and his successors, heirs or assigns to the conditions of
this permit.
B. This permit is granted for the area designated on Exhibit A, which is attached hereto.
C. The term of the permit shall extend from February 18, 2004 until December 31, 2004
unless revoked prior to that for failure to comply with the permit requirements. A mining
permit fee of $635.00 shall be paid to the City of Rosemount.
D. All required permits from the State of Minnesota, County of Dakota and City of Rosemount
(hereinafter "City") or any of their agencies be obtained and submitted to the City prior to
the issuance of the permit. That failure by the Property Owner to comply with the terms
and conditions of any of the permits required under this paragraph shall be grounds for the
City to terminate said mining permit.
E. The final grading for the permit area shall be completed in accordance with the grading
plan attached as Exhibit B, or as approved by the City Engineer, and any other conditions
as may be imposed by the City from time to time.
F. The grading plan shall be revised to exclude all trees along Fischer Avenue. No grading
shall occur within the drip zone or beneath the spread of branches of any tree.
G. All gravel trucks shall enter and exit the mining area from Fischer Avenue. It shall be the
Property Owner's responsibility to obtain any access permits or easements for ingress and
egress. The location of the accesses and /or easements for ingress and egress shall be
subject to approval by the City, as well as the County Highway Department or the
Minnesota Department of Transportation if applicable or if any changes occur relative to
the mining process.
H. A plan for dust control shall be submitted to and subject to approval by the City. The
Property Owner shall clean dirt and debris from streets that has resulted from extraction or
hauling operations related to the Mineral Extraction Permit. After the Property Owner has
received 24 -hour verbal notice, the City will complete or contract to complete the clean -up
at the Property Owner's expense. In the event of a traffic hazard as determined by the
Public Works Director or Rosemount Police Department, the City may proceed
immediately to complete or contract cleanup at Property Owner's expense without prior
notification.
The surface water drainage of the mining area shall not be altered so as to interfere,
contaminate, or otherwise effect the natural drainage of adjacent property.
J. No topsoil shall be removed from the site and the Property Owner shall take necessary
measures to prevent erosion of the stockpiled topsoil. The location of the stockpiled topsoil
shall be indicated on Exhibit A the Phasing Plan. Topsoil shall be provided to a minimum
of four (4) inches and shall be consistent with city specifications for all restored phases.
K. Any costs incurred now or in the future in changing the location of existing public or
private utilities including but not limited to pipelines, transmission structures and sewer
infrastructure located within the permit area shall be the sole obligation and expense of the
Property Owner.
L. All costs of processing the permit, including but not limited to planning fees, engineering
fees and legal fees, shall be paid by the Property Owner prior to the issuance of the permit.
The Property Owner shall reimburse the City for the cost of periodic inspections by the
City Public Works Director or any other City employee for the purpose of insuring that
conditions of the permit are being satisfied. The Property Owner agrees to reimburse the
City for any other costs incurred as a result of the granting or enforcing of the permit.
M. The daily hours of operation for the mining area shall be limited to 7:00 a.m. to 7:00 p.m.,
subject, however, to being changed by the City Council.
N. The Property Owner shall deposit with the City a surety bond or cash escrow in the amount
of Seven Thousand, Five Hundred Dollars per acre ($7,500.00 /acre) or active phase in
favor of the City for the cost of restoration, regrading and /or revegetating land disturbed
by mining activities and to assure compliance with these conditions by the Property Owner.
The required surety bonds must be:
(1) With good and sufficient surety by a surety company authorized to do business in the
State of Minnesota with the right of the surety company to cancel the same upon thirty
(30) days written notice to the permit holder and the City.
(2) Satisfactory to the City Attorney in form and substance.
(3) Conditioned that the Property Owner will faithfully comply with all the terms,
conditions and requirements of the permit; all rules, regulations. and requirements
pursuant to the permit and as required by the City and all reasonable requirements of
the Public Works Director or any other City officials.
(4) Conditioned that the Property Owner will secure the City and its officers harmless
against any and all claims, or for which the City, the Council or any City officer may
be made liable by reason of any accident or injury to persons or property through the
fault of the Property Owner.
2
Upon thirty (30) days notice to the permit holder and surety company, the City may reduce or
increase the amount of the bond or cash escrow during the term of this permit in order to
insure that the City is adequately protected.
O. The Property Owner shall furnish a certificate of comprehensive general liability insurance
issued by insurers duly licensed within the State of Minnesota in an amount of at least Five
Hundred Thousand and no /100 ($500,000.00) Dollars for injury or death of any
one person in any one occurrence, bodily injury liability in an amount of at least One Million
and no /100 ($1,000,000.00) Dollars and damage liability in an amount of at least Two
Hundred Fifty Thousand and no /100 ($250,000.00) Dollars arising out of any one occurrence.
The policy of insurance shall name the City as an additional insured and shall remain in effect
from February 18, 2004 until June 30, 2005.
P. The accessory aggregate sorting and washing plant shall be enclosed by a temporary fence.
In addition, the northern perimeter shall also be fenced.
Q. The Property Owner shall hold the City harmless from all claims or causes of action that may
result from the granting of the permit. That the Property Owner shall indemnify the City for
all costs, damages or expenses, including but not limited to attorney's fees which the City
may pay or incur in consequence of such claims.
R. The Property Owner shall comply with such other requirements of the City Council as it shall
from time to time deem proper and necessary for the protection of the citizens and general
welfare of the community.
S. Complete mining and reclamation is required in all phases before any additional mining is
authorized. Modifications or expansion of the mining areas must be approved in writing to
the City.
T. The Property Owner shall incorporate best management practices for controlling erosion and
storm water runoff as specified by the Minnesota Pollution Control Agency and the United
States Environmental Protection Agency.
U. The Property Owner must have a copy of the Dakota County Soil and Water Conservation
District mining application completed and on file with the City of Rosemount Planning
Department prior to the approval of the Mineral Extraction Permit.
V. Reclamation requires the replacement of the entire stockpile of topsoil to the mined area,
reseeding and mulching necessary to re- establish vegetative cover for permanent slope
stabilization and erosion control, provided also that the minimum depth of topsoil shall not be
less than two inches after reclamation. No restored slopes may exceed a gradient of 25% or
four to 1 (4:1).
W. The Property Owner shall provide an escrow of $5,000 as a security to ensure that
Fisher Avenue will be resurfaced with one hundred percent (100 %) crushed Class
2 following the removal of the accessory aggregate sorting and washing plant.
The escrow may be replaced by another form of security acceptable to the City
Administrator.
X. Fisher Avenue shall be continuously maintained and bladed at the end of each day
and kept open to traffic.
Y. The Property Owner may not assign this permit without written approval of the
City. The Property Owner will be responsible for all requirements of this permit
and all City ordinances on the licensed premises for this permit period unless the
Property Owner gives sixty (60) days prior written notice to the City of
termination and surrenders permit to the City. The Property Owner shall identify
all operators prior to their commencement of mineral extraction related activities in
the pit area. The City shall have the authority to cause all mineral extraction
activities to cease at any time there is an apparent breach of the terms of this
permit.
IN WITNESS WHEREOF, Tom Furlong, the Property Owner, hereby consents
and agrees to the foregoing conditions of said mining permit and has hereunto set his
hand this day of , 2004.
LN
Tom Furlong
STATE OF MINNESOTA )
) SS
COUNTY OF )
The foregoing instrument was acknowledged before me this day of
2004 by Tom Furlong, the Property Owner.
Notary Public
M
Excerpt from the approved minutes of the 01 -27 -04 PLANNING COMMISSION
Public Hearing: Ames Construction /Furlong Mineral Extraction Permit Renewal
Assistant City Planner Jason Lindahl stated this is a routine renewal for a mineral
extraction permit for Ames Construction/Furlong. The pit is one - quarter mile south of
CSAH42 /TH55, West of Fisher Avenue. There have been no complaints reported
regarding this property.
The applicant was present in the audience to answer questions.
Chairperson Weisensel opened the public hearing.
Bob Rotty, Chairman of Nininger Township, stated his main concern was Fischer Avenue
and felt that this was addressed adequately.
MOTION by Weisensel to close the public hearing. Second by Messner. Ayes:
Napper, Weisensel, Messner, and Zurn. Nays: None. Motion carried.
MOTION by Messner to recommend that the City Council approve the mineral
extraction permit renewal for Tom Furlong /Ames Construction for 2004 subject to the
standards outlined in Section 12.4 of the Zoning Ordinance and the attached
recommended conditions of operation. Second by Napper. Ayes: Weisensel, Messner,
Zurn, and Napper. Nays: None. Motion carried.
30YNIYWJ '9 53.191i'
ONI1.4X3
�L
1 \ / _
ar 0,0 1c
age 1 0
S
S
a M
CL
f
d
0
U Z
w
J
0
0
O
l
S
`_• '' � t c.+
1
�' .e� %
I: i� ♦ „ten = \ \ •__ \ _ - -`� �
�i
`\ 10. �� �\ � ♦ � \\ \— }II _l
1 \
_
\ J
� i ♦ /
11 j
—i J I
♦ I 1 ` l
I `
S
.
I
Ls
e ' l 0
TM
P.
3i
i
.
M
8
3
O
5
P
�u
�E
O
•
O
7
"
46
�E
O
•
O