CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: February 17, 2004
AGENDA ITEM: Receive Bids /Award Contract -Well #12, City
AGENDA SECTION:
Project #354
Consent
PREPARED BY: Andrew J. Brotzler, P.E., City Engineer
F
ATTACHMENTS: Resolution, Bid Tabulation, Letter of
Recommendation
APPROVED BY:
P
On Tuesday, February10, 2004, bids for the referenced project were received and read aloud
publicly. This project includes the construction of City Well #12 located in the Business, Park.
The majority of the improvements will be completed in 2004 and the project will be fended by
the Water Utility fund,
Staff recommends awarding the contract to the low bidder, E.H. Renner &a Sons, Inc. in the
amount of $248,590 for the construction of Well #12.
r
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2004 —
A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT
FOR WELL #12
CITY PROJECT NO. 354
WHEREAS, City Council hereby ratifies action of City Engineer to advertise for bids.
BE IT FURTHER RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows:
All bids on construction of Well #12 have been received and tabulated.
2. The bid of E. H. Renner & Sons, Inc., in the amount of $248,590, for the construction of
said improvements is in accordance with the plans and specifications and advertisement
for bids and is the lowest responsible bid and shall be and hereby is accepted.
3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said
bidder for the construction of said improvements for and on behalf of the City of
Rosemount.
4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the
deposits made with their bids, except that the deposit of all successful bidder and the next
two lowest bidders shall be retained until a contract has been executed.
Award of the bid is contingent on the determination by the City Administrator that all
necessary rights -of -entry or easements by deed or dedication have been secured for
construction of the improvements.
ADOPTED this 17` day of February, 2004.
William H. Droste, Mayor
ATTEST:
Linda Jentink, City Clerk
Motion by:
Seconded by:
Voted in favor:
Voted against:
February 11, 2004
Mr. Andy Brotzler
City of Rosemount
2875 145 Street W.
Rosemount, MN 55068
Re: Well No. 12 Quotes
WSB Project No. 1391 -02
Dear Mr. Brotzler:
Two quotes for construction of Well No. 12 were received on February 10, 2004; one from
E.H. Renner & Sons, Inc., and one from Keys Well Drilling Company. A tabulation of their
quotes is attached. The total base bid and alternate bid for each firm is as follows:
Firm Total Base Bid and Alternate Bid
E.H. Renner & Sons, Inc. $248,590.00
Keys Well Drilling $251,075.00
E.H. Renner & Sons, Inc. is the lower quote. Both quotes have a final completion date of
August 2, 2004.
Based on the total quote price, the unit prices quoted, and the time frame for completion, we
recommend award of the project to the driller with the lowest total quote price, E.H. Renner &
Sons, Inc.
Please contact me at (763) 287 -8316 if you have any questions.
Sincerely,
WSB & Associates, Inc.
Nancy Zeigler, P.E.
Project Engineer
Attachment
lh
Minneapolis • St. Cloud • Equal Opportunity Employer
F.• 1 WPWIM1391- 021011104- ab.doe
CITY OF ROSEMOUNT
WELL NO. 12 TABULATION OF QUOTES
February 11, 2004
E. H. Renner & Sons, Inc. Keys Well Drilling Company
ITEM NO.
DESCRIPTION
APPROXIMATE QUANTITY
UNIT PRICE
TOTAL PRICE
UNIT PRICE
TOTAL PRICE
1
MOBILIZATION
--
$22,000.00
--
$15,000.00
2
DRILL 30 -INCH OPEN HOLE
90 ft.
$225/ft
$20,250.00
$210 1ft
$18,900.00
3
PLACE 24 -INCH CASING
90 ft.
$68/ft
$6,120.00
$70 /ft
$6,300.00
4
DRILL 24 -INCH OPEN HOLE
100 ft.
$150 /ft
$15,000.00
$170/ft
$17,000.00
5
DRILL 24 -INCH OPEN HOLE
280 ft.
$100.00 /ft.
$28,000.00
$115.00/ft.
$32,200.00
6
PLACE 18 -INCH CASING
395 ft.
$55.00/ft.
$21,725.00
$45.00/ft.
$17,775.00
7
PLACE GROUT
50 cu. yd.
$310 /cu. yd.
$15,500.00
$310 /cu. yd.
$15,500.00
8
USE OF EXPLOSIVES
400 Ib.
$18.00 /lb
$7,200.00
$18.001Ib
$7,200.00
9
ROCK REMOVAL
400 cu. yd.
$65 /cu. yd.
$26,000.00
$65/cu. yd.
$26,000.00
10
AIR COMPRESSOR SET UP AND REMOVAL
—
$10,000.00
--
$9,000.00
11
AIR SURGING
120 hrs.
$150.00 /hr.
$18,000.00
$160.00 /hr.
$19,200.00
12
TELEVISION SURVEY
$1200.00 /srvy
$1,200.00
$1200.00 /srvy
$1,200.00
13
TEST PUMP PLACEMENT AND REMOVAL
--
$5,000.00
$4,500.00
14
WELL TESTING
80 hrs.
$120.001hr.
$9,600.00
$125.00/hr.
$10,000.00
15
ADD'L SAND CONTENT TESTS
5
$25 /test
$125.00
$50 /test
$250.00
16
SAMPLE ANALYSIS
$1,200.00
-
$1,400.00
17
SILT FENCE
250 ft.
$5 /If
$1,250.00
$4 1If
$1,000.00
18
SOUND BARRIER
480 sq. ft.
$9 /sq. ft.
$4,320.00
$10 /sq. ft.
$4,800.00
19 ALT
DRILL 30 -INCH OPEN HOLE
290 ft.
$100 /ft
$29,000.00
$125/ft
$36,250.00
20 ALT
DRILL 18 -INCH OPEN HOLE
80 ft.
$75/ft
$6,000.00
$85/ft
$6,800.00
21 ALT IGAMMALOG
$1,100 /log
$1,100.00
$800 /log
$800.00
TOTAL BASE AND ALTERNATE QUOTE
$248,590.00
$251,075.00
Page 1 of 1 F.IWPW1M1391- 021ExceAWell No 12 Quote Tabulation