HomeMy WebLinkAbout6.g. Change Order #2-Well #12, City Project #354CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: July 20, 2004
AGENDA ITEM: Change Order #2 -Well #12, City Project #354
AGENDA SECTION:
Consent
PREPARED BY: Andrew J. Brotzler, P.E., City Engineer
WX.ITEM
, A O
ATTACHMENTS: Change Order #2
APPROVED BY:
RECOMMENDED ACTION: MOTION TO APPROVE CHANGE ORDER #2 FOR WELL
#12, CITY PROJECT #354 AND AUTHORIZE THE NECESSARY SIGNATURES.
ACTION:
BACKGROUND:
Change Order #2, Well #12 includes an amendment to the contract for a time extension
to the original contract. A time extension is requested due to rain out delays and a
longer 30 -inch pipe drive without a static water level. The amount of Change Order #2
is a net increase of 42 working days to the contract. No charge to the contract price is
proposed.
SUMMARY:
Staff requests Council approval of this item.
a
_�
F
Inc.
June 30, 2004
Ms. Cindy Dorniden
City of Rosemount
2875 145" Street West
` Rosemount, MN 55068
�h .
- Re: Change Order No. 2
Municipal Production Well No. 12
City of Rosemount Project -No. 354
WSB Pro jectNos. 1391 -02
Dear Ms. Dorniden:
Please find enclosed Change Order No. 2 for the above- referenced project. The change
order reflects an increase of 42 days to the contract time. The change order has been
reviewed and agreed upon by the contractor and we hereby recommend that the City of
Rosemount approve Change Order No. 2 for E. H. Renner and Sons, Inca
If you have any questions or comments regarding the enclosed, please contact me at (763)
287 -8216. Thank you.
Sincerely,
WSB & Associates, Inc.
Nancy Zeigler, P.E.
Project Manager
r,.
� Enclosures'
cc: Roger Renner, E. H. Renner and Sons, Ina
Y
js
x
" & F,- 1PW1M1391- 011co2Itrcry.dx
AX Minneapolis • St. Cloud • Equal Opportunity Employer
JUNE 30,2004
MUNICIPAL PRODUCTION WELL NO. 12
CITY OF ROSEMOUNT, MN
CITY PROJECT NO. 354
WSB PROJECT NO. 1391 -02
OWNER: CONTRACTOR:
CITY OF ROSEMOUNT E. H. RENNER AND SONS, INC.
2875 145TH STREET WEST 15688 NW JARVIS STREET
ROSEMOUNT, MN 55068 -4941 ELK RIVER, MN 55330
YOU ARE DIRECTED TO MAKE THE FOLLOWING MODIFICATIONS IN THE CONTRACT DOCUMENT DESCRIPTION:
The following changes to the contract documents are modified as shown on the attached detail. The quantities reflect the following changes:
1. Time extension due to rain out days and longer 30 -inch pipe drive without a static water level.
IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR
FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE.
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME:
ORIGINAL CONTRACT PRICE: $220,116.00 ORIGINAL CONTRACT TIME: 812/2004
PREVIOUS CHANGE ORDERS: N/A $1,490.00 NET CHANGE FROM PREVIOUS CHANGE ORDERS: 7 Days
CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: $221,606.00 CONTRACT TIME PRIOR TO THIS CHANGE ORDER: 8/9/2004
NET INCREASE OF THIS CHANGE ORDER: $0.00 NET INCREASE OF CHANGE ORDER 42 Days
CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: $221,606.00 CONTRACT TIME WITH APPROVED CHANGE ORDERS 9/20/2004
RECOMMENDED BY: APPROVED BY:
/ 41ANCY ZEIGLER, P.E., PROJECT MANAGE CONTRACTOR SIGNATURE
WSB & ASSOCIATES, INC. E. H. RENNER AND SONS
CONTRACTOR
APPROVED BY:
CITY ENGINEER MAYOR
CITY ADMINISTRATOR DATE
F.IWPW/M1231- 161EXCELICO- 2.xlsl CO -1
i
l.f� 3
4
-- - j*RA
"c t 3 ;
A le = CHANGE.ORDER NO' 2 DE`fAli,�
�.
r _..
JUNE 30, 2004
MUNICIPAL PRODUCTION WELL NO. 12
CITY OF ROSEMOUNT, MN
CITY PROJECT NO. 354
WSB PROJECT NO. 1391 -02
ITEM NO. DESCRIPTION QTY UNIT PRICE TOTAL
23 TIME EXTENSION N/A N/A $0.00 $0.00
$0.00
NET TOTAL CHANGE ORDER NO. 9 $0.00