HomeMy WebLinkAbout6.h. Payment #5 & Final-Chippendale/CSAH 42 Improvements, City Project #344CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: August 2, 2004
AGENDA ITEM: Payment #5 & Final- Chippendale
AGENDA SECTION:
Avenue /CASH 42 Street & Utility Improvements, City Project
Consent
#344
PREPARED BY: Andrew J. Brotzler, P.E., City Engineer W __ A WW'#
6
ATTACHMENTS: Pay Voucher #5 & Final, Correspondence
APPROVED BY•
w /Dakota County, Final Cost Split
RECOMMENDED ACTION: MOTION TO AUTHORIZE PAYMENT #5 AND FINAL TO
McNAMARA CONTRACTING, INC. IN THE AMOUNT OF $47,411.15 FOR
CHIPPENDALE AVENUE /CSAH 42 STREET AND UTILITY IMPROVEMENTS, CITY
PROJECT #344 AND ACCEPT FOR PERPETUAL MAINTENANCE SUBJECT TO
CONDITIONS ENUMERATED BELOW.
ACTION:
BACKGROUND:
This item is on the agenda to request Payment #5 and final to McNamara Contracting
in the amount of $47,411.15 for the Chippendale Avenue /CSAH 42 Street and Utility
Improvements, City Project #344. The revised contract amount was $1,069.364.41
and the final total cost for the project was $1,089,398.12 that results in an overrun of
$20,033.71 or about 2 % of the revised contract amount. The reasons for the overrun of
the revised contract amount resulted from additional work requested by Dakota County
that included relocation of the bike kiosk located in the northeast quadrant of the CSAH
42 and Chippendale intersection, additional milling on CSAH 42, additional bituminous
on CSAH 42 and additional concrete median on CSAH 42. Staff requested that Dakota
County fund 100% of their additional work and in return Dakota County agreed upon
those terms. Letters regarding this correspondence with Dakota County are included
for your information.
The final breakdown for funding of the project for City and County is as follows:
Cit of Rosemount Dakota Count Project Total
$787,435.59 $301,962.53 $1,089,398.12
The City portion of this project is being funded by the Street C.I.P., special
assessments and trail /sidewalk improvement fund. A breakdown of the final cost split
between the City of Rosemount and Dakota County is also included for your
information.
SUMMARY:
Staff recommends that Council approve Payment #5 and final for the project and
accept the project for perpetual maintenance subject to the following conditions:
1. Satisfactory showing that the contractor has complied with the provisions of
Minnesota Statutes 290.92 requiring withholding state income tax.
2. Evidence in the form of an affidavit that all claims against the contractor by
reasons of the contract have been fully paid or satisfactorily secured.
3. Consent of Surety to Final Payment certification form the contractor's surety.
4. Two -year maintenance bond.
& Associates Inc. July 12 2004
�Y
Honorable Mayor and City Council
t City of Rosemount
2875 145 Street West
Rosemount, MN 55068
Attn: Cindy Dorniden, City of Rosemount
Re: Construction Pay Voucher No. 5 (Final)
Chippendale Avenue and CSAH 42
Street Improvements and Appurtenant Work
.r
City of Rosemount Project No. 344
WSB Project No. 1399 -00
Dear Mayor and Council Members:
Please find enclosed the final Construction Pay Voucher No. 5 for the above - referenced
project in the amount of $47,411.15. We recommend final payment subject to receipt of
;t. the following items:
1. Satisfactory showing that the contractor has complied with the provisions of
e .
Minnesota Statutes 29092 requiring withholding q g g state income tax.
2. Evidence in the form of an affidavit that all claims against the contractor by reasons
of the contract have been funy paid or satisfactorily secured.
3. Consent of Surety to Final Payment certification from the contractor's surety.
4. Two -year maintenance bond.
Please make payment in this amount to McNamara Contracting, Inc. at your earliest
convenience.
Sincerely,
WSB & Associates, Inc.
David�`u a;
A4 —
Project Manager
Enclosures -
js
Minneapolis • St. Cloud Eaual O000rtunity Emnlnyer
A Owner:
City of Rosemount
Date:
June 29, 2004
WSB For
Period: 3/11/2004 to 4/25/2004
Request No:
5 and FINAL
Contractor: McNamara Contracting, Inc.
PAY VOUCHER
CHIPPENDALE AVENUE AND CSAH 42
STREET IMPROVEMENTS AND APPURTENANT WORK
CITY OF ROSEMOUNT PROJECT NO. 344
WSB PROJECT NO. 1399 -00
SUMMARY
1
Original Contract Amount
$
1,046,226.56
2
Change Order - Addition $ 23,137.85
3
Change Order - Deduction $
0.00
4
Revised Contract Amount
$
1,069,364.41
5
Value Completed to Date
$
1,089,398.12
6
Material on Hand
$
0.00
7
Amount Earned
$
1,089,398.12
8
Less Retainage
$
0.00
9
Subtotal
$
1,089,398.12
10
Less Amount Paid Previously
$
1,041,986.97
11
AMOUNT DUE THIS PAY VOUCHER NO. 5 and FINAL
$
47,411.15
Recommended for Approval by:
WSB & Associates, Inc.
Project Man r /Engineer
C&euction Observer
Approved by Contractor: Ap o e
Owner.
MCNAMARA CO C IN YO O
LINT
V 61/
Specified Contract Completion Date: Date:
October 31, 2003
Y ofd
F:IWPW?M1399-00Z,- A1399A0 Pry V.-h., NO. 5.xls
Pay Voucher No. 5 and Final
Chippendale Avenue and CSAH 42
City of Rosemount Project No. 344
WSB Project No. 1399-00
June 29, 2004
Item
No.
Material No.
Item Description
Unit
Contract
Quantity
Unit
Price
Current
Quantity
Quantity
to Date
Amount
to Date
BASE BID
1
2021.501
MOBILIZATION
LUMP SUM
1
$46,320.00
0
1
$46,320.00
2
2101.502
CLEARING
TREE
18
$250.00
7
37
$9,250.00
3
12101.507
GRUBBING
TREE
18
$200.00
71
36
$7,200.00
4
2101.511
CLEARING AND GRUBBING
LUMP SUM
1
$1,500.00
0
1
$1,500.00
5
2102,502
PAVEMENT MARKING REMOVAL
LIN FT
2890
$0.55
0
$0.00
6
2104.501
REMOVE SEWER PIPE (STORM)
LIN FT
168
$13.30
0
110
$1,463.00
7
2104.501
REMOVE CURB AND GUTTER
LIN FT
4725
$4.00
0
4669
$18,676.00
8
2104.501
REMOVE BITUMINOUS CURB
LIN FT
815
$3.00
0
826
$2,478.00
9
2104.503
REMOVE CONCRETE MEDIAN
SO FT
2055
$1.00
01
4450
$4,450.00
10
2104.505
REMOVE CONCRETE PAVEMENT
SO YD
95
$10.00
ol
95
$950.00
11
2104.505
REMOVE BITUMINOUS PAVEMENT
SO YD
5975
$3.50
01
6021
$21,073.50
12
2104.509
REMOVE MANHOLE OR CATCH BASIN
EACH
8
$275.00
0
6
$1,650.00
13
2104.513
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)
LIN FT
3650
$3.00
0
4891
$14,673.00
14
2104.523
SALVAGE SIGN
EACH
14
$22,00
0
13
$286.00
15
2105.501
COMMON EXCAVATION
CUYD
7170
$13.75
0
5951
$81,826.25
16
2105.507
SUBGRADE EXCAVATION
CUYD
720
$13.75
0
33
$453.75
17
2105.522
SELECT GRANULAR BORROW (LV)
CU YD
2500
$14.30
0
668
$9,552.40
18
2105.525
TOPSOIL BORROW (LV)
CUYD
50
$17,50
01
511.17
$8,945.48
19
2211.501
AGGREGATE BASE CLASS 5
TON
6700
$13.75
0
5280.44
$72,606.05
20
2232,501
MILL BITUMINOUS SURFACE (1.5 ")
SO YD
8770
$1.25
0
18978
$23,722.50
21
2350.501
TYPE MV 3 WEARING COURSE MIXTURE (B)
TON
250
$63.30
0
613.18
$38,814.29
22
2350.501
TYPE LV 4 WEARING COURSE MIXTURE (B)
TON
1330
$35.75
0
1408.95
$50,369,96
23
2350.502
TYPE HV 3 NON WEARING COURSE MIXTURE (B)
TON
490
$55.90
0
265.11
$14,819.65
24
2350.502
TYPE MV 3NON WEARING COURSE MIXTURE (B)
TON 1
655
$46.50
01
382.78
$17,799.27
25
2350.502
TYPE LV 3 NON WEARING COURSE MIXTURE (8)
TON
760
$33.60
0
972.27
$32,668.27
26
2357.502
BITUMINOUS MATERIAL FOR TACK COAT
GALLON
1100
$3.00
0
1233
$3,699.00
27
2401.604
CONCRETE MEDIAN
SO YD
395
$26.55
0
628.5
$16,686.68
28
2451.602
GRANULAR FOUNDATION AND /OR BEDDING
TON
32
$28.60
0
0
$0.00
29
2501.515
15" RC PIPE APRON
EACH
1
$869.00
0
0
$0.00
30
2501.602
TRASH GUARD FOR 15" PIPE APRON
EACH
1
$429.00
01
0
$0.00
31
2503.541
15" RC PIPE SEWER DESIGN 3006 CLASS V
LIN FT
144
$42.90
01
122
$5,233.80
32
2503.541
18" RC PIPE SEWER DESIGN 3006 CLASS 111
LIN FT
21
$46.20
01
0
$0.00
33
2503.541
36" RCPIPE SEWER DESIGN 3006 CLASS III
LIN FT
8
$68.20
0
0
$0.00
34
2504.602
RELOCATE HYDRANT & VALVE
EACH
1
$2,365.00
0
1
$2,365.00
35
2504.602
ADJUST VALVE BOX
EACH
10
$250.00
0
11
$2,750.00
36
2504.602
VALVE BOX EXTENSION
EACH
3
$250.00
0
13
$3,250.00
37
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 -4020
LIN FT
25.28
$434.50
0
33.6
$14,599.20
38
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 60 -4020
LIN FT
17.47
$544.50
0
17.47
$9,512.42
39
2506.502
CONSTRUCT DRAINAGE STRUCTURE DESIGN H
EACH
1
$1,419.00
0
1
$1,419.00
40'
2506.502
CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 1
EACH
2
$1,974.50
0
2
$3,949.00
41
2506.503
RECONSTRUCT DRAINAGE STRUCTURE
LIN FT
28
$434.50
0
28
$12,166.00
42
2506.516
CASTING ASSEMBLY
EACH
9
$525.00
0
9
$4,725.00
43
2506.522
ADJUST FRAME & RING CASTING
EACH
19
$300.00
0
17
$5,100:00
44
2506.602
CONNECT INTO EXISTING STORM SEWER
EACH
11
$385.00
0
11
$4,235.00
45
2521.501 4"
CONCRETE WALK
SO FT
17500
$3.50
0
17944
$62,804:00
46
2521.501 6"
CONCRETE WALK
SO FT
560
$5.25
01
285
$1,496.25
47
2521.603 BITUMINOUS
BIKE PATH
LIN FT
3405
$17.60
01
3392
$59,699.20
48
2531.501 CONCRETE
CURB & GUTTER DESIGN B418
LIN FT
800_
$11.50
01
355.5
$4,088.25
49
2531.501 CONCRETE
CURB & GUTTER DESIGN B618
LIN FT
4905
$10.75
01
5416
$58,222.00
50
2531,507 6"
CONCRETE DRIVEWAY PAVEMENT
SO YD
45
$100.00
01
109.87
$10,987.00
51
2531.507 8"
CONCRETE DRIVEWAY PAVEMENT
SO YD
60
$135.00
0
341.5
$46,102.50
52
2531.604 7"
CONCRETE VALLEY GUTTER
SO YD
30
$90.00
0
54
$4,860.00
53
2545.602 RELOCATE
LIGHTING UNIT
EACH
3
$979.00
0
01
$0.00
54'
`.2563.601 TRAFFIC
CONTROL LUMP
SUM
1
$19,000.00
0
1.241
$23,560.00
55
2564.531 SIGN
PANELS TYPE C
SO FT
104.75
$23.10
0
129.5
$2,991.45
56
2564.536 INSTALL
SIGN PANEL TYPE C
EACH
14
$93.50
0
9
$841,50
57
2564.602 PAVEMENT
MESSAGE (LEFT ARROW) POLY PREFORMED
EACH
8
$365.00
01
10
$3,650.00
58
2564.602 PAVEMENT
MESSAGE (RIGHT ARROW) POLY PREFORMED
EACH
10
$365.00
0
8
$2,920.00
2 of 4 FAWPWIM1399.00IExceR1399 -00 Pay Voucher No. 5.x1s
Pay Voucher No. 5 and Final
Chippendale Avenue and CSAH 42
City of Rosemount Project No. 344
WSB Project No. 1399 -00
J
June 29, 2004
Item
No.
Material No.
Item Description
Unit
Contract
Quantity
Unit
Price
Current
Quantity
Quantity
to Date
Amount
to Date
59
2564.603
4" SOLID LINE WHITE -EPDXY
LIN FT
2485
$0.55
0
2966
$1,631.30
60
2564.603
8" SOLID LINE WHITE -EPDXY
LIN FT
750
$3.85
0
1055
$4,061.75
61
2564.603
4" BROKEN LINE WHITE -EPDXY
LIN FT
1730
$0.55
0
842
$463.10
62
2564.603
4" DOUBLE SOLID LINE YELLOW -EPDXY -
LW FT
2275
$1.18
0
2608
$3,077.44
63
2564.603
24" SOLID LINE YELLOW -EPDXY
LIN FT
160
$6.05
0
268
$1,621.40
64
2565.511
FULL T ACT T CONTROL SIGNAL SYSTEM
SIG SYS
1
$160,545.00
0
1
$160,545.00
65
2571.501
CONIFEROUS TREE UHT B &B
TREE
3
$400.00
3
5
$2,000.00
66
2571.502 1
DECIDUOUS TREE 2.5" CAL B &B
TREE
4
$400.00
0
4
$1,600.00
67 1
2573.502
SILT FENCE, TYPE HEAVY DUTY
LIN FT 1
2500
$3.00
0
273
$819.00
68 1
2575.505 1
SODDING TYPE LAWN
SO YD 1
11200
$3.35
98691
109391
$36,645.65
Total BASE BID $1,065,924.27
GRAND TOTAL $1,089,398A
3 of 4 F.A*PW7M9399 -0OWxceh1399 -00 Pay Voucher No. 5.xls
CHANGE ORDER NO.1
69
2564.602
PAVEMENT MESSAGE (LEFT ARROW) POLY PREFORMED
EACH
-2
$365.00
0
0
$0.00
70
2564.602
PAVEMENT MESSAGE (RIGHT ARROW) POLY PREFORMED
EACH
-4
$365.00
0
0
$0.00
71
2564.602
PAVEMENT MESSAGE (LEFT ARROW) EPDXY
EACH
2
$265.00
0
0
$0.00
72
2564.602
PAVEMENT MESSAGE (RIGHT ARROW) EPDXY
EACH
4
$265.00
0
0
$0.00
73
2340.521
IRREGULAR WIDTH PAVING
SQ YD
128
$34.45
0
128
$4,409.60
74
2521.603
JBITUMINOVS BIKE PATH " "
LIN FT
350
$17.60
0
335
$5,896.00
75 1
90803
JADD WATER AND SEWER SERVICES
LUMP SUM
1
$13,168.25
0
1
$13,168.25
Total CHANGE ORDER NO. 1 $23,473.85
GRAND TOTAL $1,089,398A
3 of 4 F.A*PW7M9399 -0OWxceh1399 -00 Pay Voucher No. 5.xls
PROJECT PAYMENT STATUS
OWNER: CITY OF ROSEMOUNT
CITY OF ROSEMOUNT PROJECT NO. 344
WSB PROJECT NO. 1399 -00
CONTRACTOR: MCNAMARA CONTRACTING, INC.
CHANGE ORDERS
No. Date
Description Amount
1
9/10/2003
Modified contract quantities.
$23,137.85
$15,684.07
$313,681.45
2
10/01/2003
10/31/03
$460,963.62
$39,945.32
$798,906.32
Total Change Orders
$23,137.85
PAYMENT SUMMARY
No. From To Payment Retainage Completed
1
09/1512003
09/30/03
$297,997.38
$15,684.07
$313,681.45
2
10/01/2003
10/31/03
$460,963.62
$39,945.32
$798,906.32
3
11/01/2003
11/30/03
$271,492.87
$10,000.00
$1,040,453.87
4
12/01/2003
03/10/04
$11,533.10
$10,000.00
$1,051,986.97
5 and FINAL 1
1 03/1112004
06/25/04
$47,411.15
$0.00
$1,089,398.12
Material on Hand
Total Payment to Date
$1,089,398.12
" Original Contract
$1,046,226.56
Retains a Pay No. 5 and FINAL
$0.00
Change Orders
$23,137.85
Total Amount Earned
$1,089,398.12
Revised Contract
$1,069,364.41
4 of4 F.9WPMAn1"9- 00WXcd1999.00 Pay Vouchw No. yids
f
CITY OF ROSEMOU NT 2875 `145hSteetWest
Rosemount, MN
55068 -4997
Phone: 651 - 423 -4411
Hearing Impaired: 651 - 423.6219
Fax: 651- 423 -5203
October 8, 2003
Dakota County Transportation Department
Attn: Dave Zech
14955 Galaxie Avenue
Apple Valley, MN 55124
Re: Chippendale Avenue /CSAH 42 Improvements
City Project #344
Dear Mr. tech:
This letter is in regards to the additional work requested by Dakota County at the October 2,
2003 weekly construction meeting for the above referenced project. The additional work
requested to be completed includes relocation of the bike kiosk in, the northeast quadrant of the
CSAH 42 /Chippendale Intersection, additional milling and overlay at the CSAH 42 /Chippendale
Avenue intersection and westbound CSAH 42 from the beginning of the new tapers to the
Chippendale Avenue intersection and a concrete median on CSAH 42, east of Chippendale
Avenue, that was originally proposed to be left as an existing grass median. The approximate
corresponding quantities and costs are as follows:
Item
Material
Item
Unit
Quantity
Unit
Total
No.
No.
12232.501
Price
1
Mill Bituminous Surface
_(1.5"
Sq yd
2222
$1.25
$2,777.50
2
2350.502
Type HV3 Non Wearing
Ton
202
$55.90
$11,291.80
Course Mixture 0)
3
2401.604
Concrete Median
Sq yd
412
$26.55
$10,938.60
4
NA
Salvage & Relocate Bike
Lump
i
T & M
Unknown
Kiosk
Sum
TOTAL
$25,007.90
As this cost is above and beyond the original project scope and budget approved by the
Rosemount City Council, the City of Rosemount is unfortunately not in a position to participate
in this additional cost. Should Dakota County choose to have the contractor proceed with the
above additional work, we, would anticipate that 100 percent of the additional work will be
funded by Dakota County.
Please advise us at your earliest convenience of Dakota County's position to have the contractor
complete this additional work.
C O UN T Y
Transportation Department October 17, 2003
Mark J. Krebsbach, P.E.
Transportation Director!
County Engineer
Andrew J. Brotzler, PE
Dakota count City Engineer
Empire Transportation Facility City of Rosemount
2800 160th Street W.
Rosemount; MN 55068 2875 =145 Street West
Rosemount, MN 55068 -4997
952.891.7900
Fax 952.891.7909
www.co.dakota.mn.us
SUBJECT: Chippendale Avenue /CSAH 42 Improvements
Dear Andy:
This letter is in response to your letter dated October 8 requesting that Dakota
County fund additional work requested at a weekly meeting.
Please proceed'with the milling and paving work, concrete median work and
relocation of the kiosk. Dakota County agrees that the extra work for these
specific items should be funded entirely through Dakota County. The extra
milling and paving in the south half of the intersection is approximately 430
square yards and the concrete paving between station 10 +20 to 11 +00 is
approximately 80 square yards of additional concrete paving.
Thank you for your cooperation in completing this work. If you have any
questions please call me at 952 -891 -7108.
Sincerely, ,
Dave Zech,
Assistant County Engineer
PrnRed an recYded paper
with 30% post - consumer waste.
M EQUAL orroan"Tr ermwrea
LODE
U
au"T ITLES
TOTAL
PROJECT
CITY SAP
208. 107-05
COUNTY
SAP 19- 64241
NO.
ITTEM EM NO
140 .
DESCRIPTION
UNIT
QUANTITY
57447 COST
TOTAL COST
NOTES
CITYOFR05EMOUNT
DAKOTA
COUNTY
FINALQUANTITY
DAKOTA
COUNTY COST
QUANTITY
ANnTY
QUANTITY
QUANTITY
QUANTITY
1
2021.501
MOBILIZATION
LUMP SUM
1
$46,320.00
546,320.00
QUANTITY
COST
ANTITY
COST
QUANTITY
COST
UAN77TY
- COST
QUANTITY
COST
2..
2101.502
CLEARING
TREE
'5250
1
$46,320.00
0.8515
S39,441.48
0.1485
.$6,878.52
1-00
546,320.00
0.15
% ,878.52
3
2101.307
CRUBBONO
IB
.00
$00.00
45
N
54,500.00
1525
.$3,812.50.
2.75
5687.50
37
$9,250.00
5.7
55,413.19
TREE
16
$200.00
13,60D.00
IB
S3,600.00
1525
13,050,00
.2.75
555000
.
36
4
2101.511
CLEARMG GRUBBING
L
LUMP SUM
1
SI,5000D
57,500.00
1
fI,SOD.00
0.725
.$7,200-00
5.5
51,100.00
5
2102.502
PAVE15EN7' MARKING REMOVAL
LIN FT
2890
10.55
51,589.50
51,087 .50
02 75
$412.50
1
00
515.00
0.3
5412.50
6
2104.501
REMOVE SEWER PI PS (STORK
LIN FT
2890
51,589.50
1300.5
$71528
.1389.5'
1874.23
0
%.00
0.0
$0.00
7
2109.501
REMOVE CURB ANDG UTTER
168
$1330
52,234.90
168
52,234.40
119.6
$1,590.68
48:4
5643.72
Ito
$1463.00
,
31,7
5421.48
8
2104.50
REMOVE . CURB
LIN FT
4725
54.00
1118,900.0D
4725
118.900-00
3330.75
51752).00
1794.25
55,577.08
4669
518,676.00
1377.7
$5,510.90
9
LIN FT
815
53.00
12,445.00
815
12,445.00
US
12,445.00
0
$0.00
826
52,478.00
0.0
2109.507
3
REMOVE CONCRETE MEDLW
CONCRETS
SQ FT
.2055
51:00
$2,055.00
2055
12,051.00.
924.75
%:00
10
2104.505
REMOVE CONCRETE JAY 544$247
SQ YD
95
110.00
2950.00
$924.75
113025
51,13015
4450
$4,450.00'
2447.5
52,447.50
11
2104.505
REMOVE BITUMINOUS PAVEMENT
95
5950.00
70.23
$702.50
24.75
$247.50
95
5950.00
24.8
1297:50
12
2104509
REMOVE MANHOLES OR CATCH BASIN
SQ YD
5975
53.50
$20,912.50
3975
S20,912.50
5218.75
118,265.63
756.25
$2,646.88
6021
S21,073.50
762.1
$2,667.25
EACH
8
5275-00
$2,200.00
8
52.200.00
4.7
SI,292.30
3.3
190750
6
51,630.00.
2.5
13
2104 .513
SAWING BITIJMiNOU3 PAVEMENT (FULL DEPTH)
LIN
3650
$3.00
$10,950.00
3650
SI0,950.00
%80.67
14
2104.523
SALVAGE SIGN
EACH
14
2785
Y7,I55.00
1265
$3,795.00
4891
574,673,00
1695.1
55,08530
11
2103.501
COMMON EXCAVg71 ON
$22.00
$308.00
14
5308.00
9.05
1199:10
4.95.
5108.90
13
5256.00
1.6
$101.12
16
2105.507
gUBORADE E%CAVA710N
CU YD
7170
513.75
!98,587.50
7170
$98,587.50
4744.5
%5,236:88
2425.5
433,350.63
5951
581,92625
2013.1
327,680.55
CU YD
720
(13.75
59,900.00
720
$9,900.00
4725
16,496.88
241.5
53,403.13
37
5453,15
17
2105.522
SELECT GRANULAR BORROW (LV)
CU YD
2500
$Ia.30
535,750.00
2500
535,750.00
1384.5
578,)68.35
11.3
$ 153.98
18
2105.525
TOPSOIL BORROW (LV)
CU YD
50
517.50
1215.5
517,381 65
668
59,532.40
3248
59,64138
19
2211.501
AGGREGATE BASE CLASS!
5873.00
SO
$975.00
30.73
13]8.13
1925
1336.68
511.17
58,943.48
196.8
'53, 444.01
20
2232.501
MILL BITUMINOUS SURFACE(LS')
TON
6700
$13.75
592,125.00
6700
$92,125.00
4351.5
$59,833.13
2348.5
$32,291.88
5280.14
$72,6W.05
1850.9
525, /50.05
21
2]50 .501
TYPE COURSE MIXTURE
SQYD
8770
51.25
S10,962.50
8770
510,%2.30
8770
110,962.50
0
SO.00
18978
$23.722.50
2222.0
52,77750
22
2350.501
TYPE LV 4 WEAR COURSE MIXTURE (B)
TUN
TON
230
$63.30
SI5,825.00
250'
515,625.00
112.5
17,12115
137.5
58,703.75
613:18
29
5392
134,131.36
23
2350.502
TYPE HV 3 NON-WEARCOURSE MIXTURE(B)
1330
575.75
197597.50
1730
547,517.50
1330
$97,307.50
0
$0.00
1908.95
96
0.0
10,00
24
..
2)50502
TYPE MV 3 NON -WEAR COURSE MIXT tIRE {B)
TON
TON
490
553.90
$27,391.00
490
$27
220.5
$12,325.95
269.5
SI5,065.05
265.11
65
145.1
$9,150.91
25
2350.503
TYPE LV 324024 -WEAR COURSE MUT TIRE (B)
655
$46.50
$30,457.50
655
530,457.50
294.75
$13,705.88
36015
$16,751.63
382.79
27
210,5 -
59,789.60
26
2357.502
BITUMINOUS MATERIAL FOR TACK COAT
TON
760
533.60
123,536.00
760
$25,536.00
760
$25,536.00
0
$D.W
97217
7
0.0
$0.00
27
2401.604
CONCRETE MEDIAN
GALLON
1100
53.00
$3,300.00
1100
53,300.00
924
52,772.00
176
S528.0D
1233
0
197.3
$991.94
22
2451.609
GRANULAR FOUNDATION AND/OR BEDDONG
SQ YD
395
526.13
51042725
393
$10,487.25
217.9
55,785.25
177.1
14,702.01
628.5
8
693.2
518,42039
29
2501.513
15" RC PIPE APRON
TON
32
SHAD
591510
32
$91510
18.8
1537.68
13.2
$377.52
0
SO.OD
O.S
50.00
EACH
1.
5869.00
5869.00.
1
1869.00
1
$869.00
0
50.00
0
30
2301 .602
TRASH GUARD FOR I S" PIPE APRON
EACH
1
$429.00
$429.00
1
70.00
0.0
SO.00
31
2503.541
IS "RC PIPE SEWER DESIGN 3006 CLV
- TIN FT
149
S42.90
16,177.60
$429.00
I
5429.00
0
$0.00
0
%.00
0.0
10.00
32
2503.541
IS RC PIPE SEWER DESIGN 3006 CL III
LM FT
21
144
$6,177.60
105.5
54,52395
38.5
$1,651.65
122
$5,233.80
32.6
$1599:31
33
2503.541
36" RC PIPE SEWER DESIGN 3006 CL m
546.20
$97020
21
$970.20
9,45
3436,59
11.55
5533.61
0
$0.00
0.0
$0.00
74
2501.602
RELOCATE HYDRANT &VALVE
LIN FT
8
%8.20
5545.60
B
5541.60
8
5545.60
0
50.00
-0
$0.00
0.0
50-00
75
2506.602
ADJUST VALVE BOX
EACH
1
52,365.00
$2365.00
1
$2,365.00
1
52,365.00
0
$0,00
52,365.00
0.0
$0.00
EACH
t0
S250.00
S2,500.00
10
52,500.00
10
$2,500.00
0
50.00
II
36
2504.602
VALVE BOX EXTENSION
EACH
3
5250.00
1750.00
3
52,750.00
0.0
SO.W
37
2506.501
CONST DRAINAGE ST RIK'7URE DES 48 -4020
LIN FT
25.28
5434.50
5750.00
3
$750.00
0
50.00
13
53,250.00
0.0
50.00
38
2506.302
CONST DRAINAGE STRUCTURE DES 60
SI0,984.16
.25.28
$10,984.16
19.7695
%,417.35
10.5705
54,566.61
77.6
514,599.20
14.0
56,069.81
39
2506.502
.9020
CONST DRAINAGE STRUCTURE DES H
LIN FT
17.47
$544.50
$9512.42
17.47
, $9512.42
17.47
19,512,42
0
$0.00
17.47
$9512.42
0.0
10.00
EACH
1
51,419.00
51,419.00
F
51,419.00
1
fI,419.00
0
5000
1
40
2506502
CONST DRAINAGE STR DES SPECIAL I
EACH
2
51,974.50
$3,949.00
$1,419.00
41
2506.507
RECONSTRUCT DRAINAGE STRUCTURE
2
53,949.00
1.45
$2,863.03
0.55
$1,085:92
2
13,999.00
0.6
51,065.98
42
2506.516
CASTING ASSEMBLY
L FT
28
5434.50
112,166:00
28
512,166.00
21.4
59,298.30
66
867
12,.70
28
512,166.00
6.6
I2,867.70
43
2506.522
ADJUST FRAME AND RING CASTING
EACH
9
S525.00
54,725.00
9
54,725.00
625
57,281.25
2.75
57,447.75
9
54,725.00
2.8
51,493.73
EACH
19
$300.00
55,700.00
19
55,700.00
17.9
55,770.00
1.1
1330.00
17
$5,100.00
1.0
$295.26
QUANTITIES
NNE
NO.
$INIDOT
ITEM NO
DESCRIPTION
UNIT
.QUANTITY
UNIT COST
TOTAL COST
NOTES
- TOTAL PROJECT
CITY SAP 208.107
CITY OF ROSEMOUNT
COUNTY SAP 19 642.11
.DAKOTA COUNTY
FIN,�.QHANTITY
DAKOTA COUNTY COST
QUANTITY
QUANTITY
QUANTITY
ANTITY
QUANTITY
44
45
46
47
48
49
50
51
2506.601
2521.501
2521.501
2521.603
2531.501
2531.501
2931307
2531.501
CONNECT tOEXISTINO STORM SEWER
4- CONCRETE WALK
6"CONCRETE WALK
BITUMINOUS BIKE PATH
CONCRE7E CURB &OU TIER OES16N1N1i
CONCRETE CURB & OUITE R DESIGN 8618
6 CONCRETE DRIVEWAY PAVEMENT.
8- CONCRETE DRIVEWAY PAVEMENT
EACH
SQ PT
SQ FT
I.IM FT
LIN PI'
LIN PP
SQ YD
SQYD
II
.17500
560
NOS
800
4905
43
60
5385.00
$3.50
55.25
517.60
$11.30
510.75
5100.00
$135.00
$9,235.00
$61,250.00
$2,940.00
559,928.00
$9200.00
$52,728.75
54,300.00
58,100.00
AN71TY
II
17500
560
3405
800
4905
45
60
COST
$4,235.00
:$61,250.00
.. $2,940.00
$59,928.00
59,200.00
$52,728.75
S4TODi 0
58.100.00
QUANTITY
7.15
17451.6
560
2899
360
4025
45
60
COST
52,752.75
561,080.60
$2,940.00
551,022.40
30,140.00
1143,268.75
34,500.00
58,100.00
QUANTITY
3.85
48.4
0.
306
440
880
0
0
- COST
$1,48215
5169.40
10.00
(8,905.60
$5,060.00
59,460.00
50.00
50.00
QUANTITY
11
17944
285
3392
355.5
9416
109.87
341.5
COST
$4,23590
$62,804.00
.51.49625
$59,69920
$4,08825
558,222911
.510,9$7.00
596.102:50
ANTITY
3,9
49.6
all
504.1
195.5
.11132
0.0
0.0
COST
$1,482.25
5173.70
fO.OD
$8,871.60
$2,248.54.
511,966.90
SO.Op.
$090.
52
33
54
SS
56 j
57
58
59
60
61
62
63
64
65
66
67
6B
25314604 7" CONCRETE VALLEY OUf'IER
2545.602 RELOCATELIOHTMOtINIT
2563.601 TL%MCCONTROL -
2564.531 SIGN PANELS TYPE
2564.536 INSTALL SIGN TYPE
2564.602 PAVEMENT MESSAGE EFL' POLY PREFORMED
2564.602 PAVEMENT MESSAGE (RIGHT ARROW) POLY PREFORMED
1561.603 4'SOLD)NNE WIETE•EPDXY
2564.603 6'SOLD) LINE WHITE-EPDXY
2564.603 4' BROKEN LINE WHITE•EPDXY
2564.603 r DOABLE SOLD) LINE YELLOW.EPoXY
2564.603 24' SOL DLINE YELLOW-EPDXY
2563.511 RILL EROUS CONTROL SIGNAL SYSTEM
2571.501 CONIFEROUS TRPE 6'HT B &B
1571302 DECIDUOUS TREE 2.S CAL B&B
2373302 SILT FENCE, TYPE HEAVY DUTY TY
2375305 SODDING TYPE LAWN
TOTAL ORIGINAL CONTRACT
SQYD
EACH
LUMP SUM
SQ FT
EACH
EACH
EACH
LM Ff
LIN FT
LIN PT
LIN FF
LIN FT
SIG SYS
TREE
TREE
Lot FI
SQ YD
30
1
1
104.75
14
8
10'
2485
750
1730
2275
160
1
3
4
2500
11200.
$90.00
$979.00
5H9,000.00
523.10
$93.50
S365A
5365.00
$0.55
53.85.
$0.53
SI,IB
$6.05
$160,595.00
5400.00
5400.00
$3.00
53.35
I2,700,00
.52,937.00
$19,000.00
$2,419.73.
51,309:00'
12 92090
53,650.00.
$1,366.75
$2,887.50
$951.50
$2,68430
596990
$160,345.00
!1.200.00
SI,600.00
57,500.00
537,520.00
71,046,22636
30
3
1
.104.73.
14
8
IO
2415
750
1730
2275
160
1
3
4
2500
11200
CHANGE ORDER NI
$2,700.00
52,931.00
$19,000.00
$2,419.73
5 1,309.00
52,920.00
$3,650.00
S136b.75
52,887.50
5931.50
52,691:50
5968.00
5160,545.00
(1,200.00
f1,600.OD
57,50100
537,52000
51,046,22636
30
2.45
0.626
94.4375
9.03
6.9
6.7
1737
S30
- 1031.5
2275
160
0.5
1.9
2.9
.2197.5
9753.5
12,700.0D
52,398.55
$11.894.00
52,111.51
846
$18
51,518.50
52,44 5.30
$955.35
52,040.50
(56733
$2,684.50
5968.00
$80,272.50
5760,00
$1,160.00
56,592.50
532,674.23
$752,41837
0
0.55
0.374
10.3125.
4.95
1.1
3.3
748
220
698.5
0
0
0.5
i.l
LI
302.3
1446.5
$0.00
S538AS
57,106.00
$23822
$462.83
$401.50
51,204.50
$911.40
5847.00
5384.1
. 30.00
30.66
580,272.50
5440.00
5440.00
5907.50
54,845.76
$293,408.19
N
0
1.24
129.3
9
10
8
2966
1055
841
2108
268
1
S.
4
273
10939
$4.860.00
50.00
$23,560.00
$2,991,45
f &1.30
33,630.00
52,920.00
$1,63130
54,061.75.
5463.10
53,077,44
$1,01.40
4160,545.00
52,000.00
51,600.00
5819.00
5366/5.63
51,065,924.27
OA
0.0
0.5
12.7
32
IA
2.6
892.8
909.3
340.0
0.0
0.0
O3.
1.8
1.1
171,0
1417.8
50:00
$0.00
NIHI.44
$29430
5297.53
5501.88 .
$963.60
5491.03
51.191,15
5186.98
$0.00
$0.00
$80,272.50
3733.33
E440.00
5513.00
54,772.85
299
3,537.2$
69
2564.602 PAVEMENT MESSAGE (LEFT ARROW) POLY PREFORMED
EACH
.2
$165.00
- 5730:00
•2
•ST70.00
•2
•5730.00
0
50.00
0
50.00
0.0
50.00
70
71
T2
73
74
75
2564.602 PAVEMENT MESSAGE(RIGHT ARROW) POLY PREFORMED
2564.602 PAVEMENT MESSAGE (LEFT ARROW) EPDXY
2564.602 PAVEMENT MESSAGE (RIGHT ARROW) EPDXY
2340321 IRREGULAR WIDTH PAVI NO
2521.603 BITUMINOUS BIKE PATH
90803.000 ADD WATER AND SEWER SERVICES
TOTALCHANGE O RDER NI
TOTAL REVISED CONTRACT
EACH
EACH
EACH
80 YD
LINFT
LUMP SUM
•4
2
4
128
350
1
$365.00
$265.00
.5265.00
534.45
$17.60
.513,16825
- 51,460.00
$530.00
57.060.00
34,409,60
$6,160.00
813,168.25
533,117,85
57,069 ,941.01
- 4
Z
4
128
350
1
•51,46090
5530.00
$1;060.00
34,409.60
(6,160.00
$13,168.25
523,137.85
11,069,164.41
4
2
4
57.6
750
1
3 1,460.00
5530.00
51,06090
SIM432
56,160.00
313,168.25
$20,71237
$773330.94
0
0
0
700
0
0
50 .00
50.00
50.00
52,425.28
50.00
$0.00
.$2,42338
1295,831.46
0.
0
a
128
335
i
50.00
$0.00
$6.00
$4,409.60
$5,896.00
513,168.25
S23,a73.85
.51,089,398.13
0.0
0.0
0.0
700
0.0
0.0
50.00
S0.00
$0.00
!2,425.28
50.00
$0.00
52,42510
$301,%233
Inrelss Ni
594,351.16
Invaise 382
$76,942.33
'
N�^K.� �i'r fnY91 SFl•aU
5'�Li�,6�
T.W
5301.96231