HomeMy WebLinkAbout6.i. Change Order #1 - Reflections Addition Street and Utility Improvements - City Project #381f
CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
City Council Meeting Date: December 07, 2004
AGENDA ITEM: Change Order #1 —Reflections Addition
AGENDA SECTION:
Street and Utility Improvements —
Consent
CP #381
PREPARED BY: Andrew J. Brotzler, P.E., City Enginee
AGE1 . , 4��tA6-1
ATTACHMENTS: Change Order #1
APPROVED BY:
RECOMMENDED ACTION: Motion to approve Change Order #1 for Reflections Addition
Street and Utility Improvements, City Project #381 and authorize necessary signatures.
ACTION:
BACKGROUND:
Change Order #1, Reflections Addition Street and Utility. Improvements includes the addition
of $149,835.00 to the original contract amount of $2,115,903.65, fora new total of
$2,265,738.65. The work included under Change Order #1 was the following:
1. Addition of 3 -inch minus rock to the road base for road stabilization due to ,a poor
subgrade that consisted of an oversaturated, silty clay material.
2. A temporary bituminous mat as requested by the developer for the issuance of
building permits. A condition of allowing building permits with, a temporary mat is
that the builder will stop all housing construction when the City's contractor
commences utility and road construction in the spring of 2005.
3. The removal of the temporary bituminous mat. The temporary mat will be
reclaimed and mixed with the existing Class V when road construction commences
in the spring of 2005.
All work included as part of Change Order #1 was either at the request of the developer,
CPDC, or agreed upon by the developer, contractor and City staff, and will be funded by the
developer.
SUMMARY:
Staff requests Council approval of this item,
er
4
REFLECTIONS ADDITION December 7, 2004
STREET AND UTILITY CONSTRUCTION AND APPURTENANT WORK
CITY OF ROSEMOUNT, MN
CITY PROJECT NO. 381 WSB PROJECT NO. 1565 -01
OWNER
City of Rosemount
2875 145th Street West
Rosemount, MN 55068
CONTRACTOR:
Barbarossa and Sons, Inc.
11000 93rd Avenue North
Osseo, MN 55369
YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION:
ITEM 118 - 3 -INCH MINUS ROCK FOR ROAD STABILIZATION.
ITEM 119 - TEMPORARY MAT FOR BUILDING PERMIT
ITEM 120: RECLAIMING OF TEMPORARY MAT
IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE,
OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE.
CHANGE IN CONTRACT PRICE:
ORIGINAL CONTRACT PRICE:
PREVIOUS CHANGE ORDERS: N/A
CONTRACT PRICE PRIOR TO THIS CHANGE ORDER:
NET INCREASE /DECREASE OF THIS CHANGE ORDER:
CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS:
RECOMMENDED BY:
ANT(VONY A. ADERHOLD, P.E.
WSB & ASSOCIATES, INC.
ENGINEER
CHANGE IN CONTRACT TIME:
$2,115,903.65
ORIGINAL CONTRACT TIME: 11/19/2004
$0.00
NET CHANGE FROM PREVIOUS CHANGE ORDERS: N/A
$2,115,903.65
CONTRACT TIME PRIOR TO THIS CHANGE ORDER: 11119/2004
$149,835.00
NET INCREASE OF CHANGE ORDER: N/A
$2,265,738.65
CONTRACT TIME WITH APPROVED CHANGE ORDERS 11/19/2004
APPROVED BY:
BARBAROSSA AND SONS, INC.
CONTRACTOR
APPROVED BY:
CITY ENGINEER
DATE OF COUNCIL ACTION
ITY ADMINISTRATCGR
1565 -01 CO 11CO -1
REFLECTIONS ADDITION
CITY OF ROSEMOUNT, MN
CITY PROJECT NO. 381
ADDITIONAL QUANTITIES
Extended
Item No. Description Qty Unit Price Amount
118
3 -INCH MINUS ROCK FOR ROAD STABILIZATION
9200
TONS
$14.10
$129,720.00
119
2.5" TEMPORARY BITUMINOUS MAT
380
TONS
$48.00
$18,240.00
120
RECLAIMING OF TEMPORARY MAT
2500
SQ YD
$0.75
$1,875.00
TOTAL ADDITIONAL QUANTITIES $149,835.00
TOTAL INCREASE CHANGE ORDER NO. 1 $149,835.00