HomeMy WebLinkAbout6.i. Change Order #1 - Reflections Addition Street and Utility Improvements - City Project #381f CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION City Council Meeting Date: December 07, 2004 AGENDA ITEM: Change Order #1 —Reflections Addition AGENDA SECTION: Street and Utility Improvements — Consent CP #381 PREPARED BY: Andrew J. Brotzler, P.E., City Enginee AGE1 . , 4��tA6-1 ATTACHMENTS: Change Order #1 APPROVED BY: RECOMMENDED ACTION: Motion to approve Change Order #1 for Reflections Addition Street and Utility Improvements, City Project #381 and authorize necessary signatures. ACTION: BACKGROUND: Change Order #1, Reflections Addition Street and Utility. Improvements includes the addition of $149,835.00 to the original contract amount of $2,115,903.65, fora new total of $2,265,738.65. The work included under Change Order #1 was the following: 1. Addition of 3 -inch minus rock to the road base for road stabilization due to ,a poor subgrade that consisted of an oversaturated, silty clay material. 2. A temporary bituminous mat as requested by the developer for the issuance of building permits. A condition of allowing building permits with, a temporary mat is that the builder will stop all housing construction when the City's contractor commences utility and road construction in the spring of 2005. 3. The removal of the temporary bituminous mat. The temporary mat will be reclaimed and mixed with the existing Class V when road construction commences in the spring of 2005. All work included as part of Change Order #1 was either at the request of the developer, CPDC, or agreed upon by the developer, contractor and City staff, and will be funded by the developer. SUMMARY: Staff requests Council approval of this item, er 4 REFLECTIONS ADDITION December 7, 2004 STREET AND UTILITY CONSTRUCTION AND APPURTENANT WORK CITY OF ROSEMOUNT, MN CITY PROJECT NO. 381 WSB PROJECT NO. 1565 -01 OWNER City of Rosemount 2875 145th Street West Rosemount, MN 55068 CONTRACTOR: Barbarossa and Sons, Inc. 11000 93rd Avenue North Osseo, MN 55369 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: ITEM 118 - 3 -INCH MINUS ROCK FOR ROAD STABILIZATION. ITEM 119 - TEMPORARY MAT FOR BUILDING PERMIT ITEM 120: RECLAIMING OF TEMPORARY MAT IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE. CHANGE IN CONTRACT PRICE: ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: N/A CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: NET INCREASE /DECREASE OF THIS CHANGE ORDER: CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: RECOMMENDED BY: ANT(VONY A. ADERHOLD, P.E. WSB & ASSOCIATES, INC. ENGINEER CHANGE IN CONTRACT TIME: $2,115,903.65 ORIGINAL CONTRACT TIME: 11/19/2004 $0.00 NET CHANGE FROM PREVIOUS CHANGE ORDERS: N/A $2,115,903.65 CONTRACT TIME PRIOR TO THIS CHANGE ORDER: 11119/2004 $149,835.00 NET INCREASE OF CHANGE ORDER: N/A $2,265,738.65 CONTRACT TIME WITH APPROVED CHANGE ORDERS 11/19/2004 APPROVED BY: BARBAROSSA AND SONS, INC. CONTRACTOR APPROVED BY: CITY ENGINEER DATE OF COUNCIL ACTION ITY ADMINISTRATCGR 1565 -01 CO 11CO -1 REFLECTIONS ADDITION CITY OF ROSEMOUNT, MN CITY PROJECT NO. 381 ADDITIONAL QUANTITIES Extended Item No. Description Qty Unit Price Amount 118 3 -INCH MINUS ROCK FOR ROAD STABILIZATION 9200 TONS $14.10 $129,720.00 119 2.5" TEMPORARY BITUMINOUS MAT 380 TONS $48.00 $18,240.00 120 RECLAIMING OF TEMPORARY MAT 2500 SQ YD $0.75 $1,875.00 TOTAL ADDITIONAL QUANTITIES $149,835.00 TOTAL INCREASE CHANGE ORDER NO. 1 $149,835.00 1565 -01 CO 11COI Detail