HomeMy WebLinkAbout6.j. Receive Bids/Award Contract for Connemara Trail Overpass, City Project #379CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION City Council Meeting Date: December 7, 2004 AGENDA ITEM: Receive Bids /Award Contract for AGENDA SECTION: Connemara Trail Overpass, Consent C Project #379 PREPARED BY: Andrew J. Brotzler, P.E. City Engineer Wz AGEN 06 J ATTACHMENTS: None 7 APPROVED BY: RECOMMENDED ACTION: Motion to adopt a resolution receiving bids and awarding contract for the Connemara Trail Overpass, City Project #379 ACTION: BACKGROUND: On Friday, December 3, 2004, bids for the referenced project were received and read aloud publicly. The bids are being reviewed for accuracy before a recommendation can be made. This project includes the construction of a bridge spanning over the UP rail system, connecting Connemara Trail, located in the Meadows of Bloomfield Development on the north side of the railroad, to Connemara Trail located in the Bloomfield 7 Addition development on the south side of the railroad. All costs associated with the project will be funded by the advancement of state aid monies. SUMMARY: The tabulation of.bidders, resolution and letter of recommendation to award will be provided at the Council meeting. 6 , J� Honorable Mayor and City Council City of Rosemount 2875 145 Street West Rosemount. MN 55068 Re: Connemara Trail Bridge (STA. 72 +00.00 to STA. 76 +50.00) Street and Bridge Construction and Appurtenant Work City of Rosemount Project No. 379 S.A.P. No. 208 - 104 -04 Bridge No. 19557 WSB Project No. 1561 -00 Dear Mayor and Council Members: Bids were received for the above - referenced project on Friday, December 3, 2004, and were opened and read aloud. A total of 6 bids were received. The bids were checked for mathematical accuracy and tabulated. The Engineer's Estimate was $1,581,408.60. Please find enclosed the bid tabulation indicating the low bidder as Lunda Construction Co., Black River Falls, WI, in the amount of $1,491,272.45. r We recommend that the City Council consider these bids and award a contract to Lunda RIZI Construction Co., based on the results of the bids received. Sincerely, WSB & Associates, Inc. Anthony A. Aderhold, P.E. Project Manager 4150 Olson,; Memorial H,g my Lunda Construction Co. Suite 300 Cindy Dorniden, City of Rosemount 763•�4I h�� FAX C.-Documents and SettingslaaalLocal Settings) Temporary Ini —t FilesDLKMRecommendation LTR.doc Minneapolis • St. Cloud Equal Opportunity Employer PROJECT: Connemara Trail Bridge (STA. 72 +00.00 to STA. 76 +50.00) Street and Bridge Construction and Appurtenant Work City of Rosemount Project No. 379 S.A.P. No. 208 - 104 -04 Bridge No. 19557 LOCATION: Rosemount, MN WSB PROJECT NO.: 1561 -00 Bids Opened: December 3, 2004 at 10:00 a.m. Engineer's Opinion of Cost $1,581,408.60 I hereby certify that this is a true and correct tabulation of the bids as received on December 3, 2004. Anthony A. Aderhold, P , Project Manager BID TAB SUMMARY Contractor Addendum Rec'd. Bid Security Total Bid 1 Lunda Construction Co. (Black River Falls, WI) n/a X $1,491,272.45 2 Minnowa Construction, Inc. n/a X $1,493,357.00 3 Robert R. Schroeder Construction, Inc. n/a X $1,537,907.20 4 Redstone Construction Co., Inc. n/a X $1,583,801.52 5 Edward Kraemer & Sons, Inc. n/a X $1,592,678.20 6 Ames Construction, Inc. n/a X $1,662,204.60 Engineer's Opinion of Cost $1,581,408.60 I hereby certify that this is a true and correct tabulation of the bids as received on December 3, 2004. Anthony A. Aderhold, P , Project Manager BID TAB SUMMARY WSB & .4ssaciatea. Inc. Project Name: RSMT - Connemara Trail Bridge Client: City of Rosemount Bid Opening: 12/3/2004 10:00 WSB Bid Tabulation Contract No.: Project No.: 01561 -00 Owner: Minneapolis 12/6/2004 Item No. Item Units Quantity Unit. Price Total Price Unit Price Total Price Unil Price Total Price Unit Price Total Price Project: 01561 00 - RSMT - Connemara Trail Bridge Engineers Material Table L unda Construction Co. Minnowa Construction, Inc. Robert R. Schroeder Constr., , Inc. SCHEDULE A 1 2021.501 MOBILIZATION LUMP SUM 1 $60,000.00 $60,000.00 $65,000.00 $65,000.00 $45,000.00 $45,000.00 $129,265.00 $129,265.00 2 2104.501 REMOVE CURB AND GUTTER LIN FT 20 $6.50 $130.00 $2.00 $40.00 $10.00 $200.00 $10.00 $200.00 3 2104.505 REMOVE BITUMINOUS PAVEMENT SQ YD 19 $5.00 $95.00 $2.00 $38.00 $5.00 $95.00 $10.00 $190.00 4 2104.511 SAWING CONCRETE PAVEMENT (FULL DEPTH) LIN FT 9 $7.00 $63.00 $3.00 $27.00 $10.00 $90.00 $5.00 $45.00 5 2104.513 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 84 $4.00 $336.00 $3.00 $252.00 $5.00 $420.00 $5.00 $420.00 6 2105.501 COMMON EXCAVATION (P) CU YD 1100 $3.50 $3,850.00 $4.00 $4,400.00 $2.00 $2,200.00 $5.00 $5,500.00 7 2105.522 SELECT GRANULAR BORROW (CV) CU YD 1100 $11.00 $12,100.00 $9.00 $9,900.001 $8.00 $8,800.00 $12.00 $13,200.00 8 2105.523 COMMON BORROW (CV) CU YD 20400 $6.50 $132,600.00 $7.50 $153,000.001 $6.00 $122,400.00 $7.15 $145,860.00 9 2211.501 AGGREGATE BASE CLASS 5 TON 770 $12.00 $9,240.00 $15.00 $11,550.00 $15.00 $11,550.00 $15.00 $11,550.00 10 2301.553 BRIDGE APPROACH PANELS SQ YD 302.22 $110.00 $33,244.20 $60.00 $18,133.20 $100.00 $30,222.00 $65.00 $19,644.30 11 2350.501 TYPE MV 3 WEARING COURSE MIXTURE (C) TON 131 $42.00 $5,502.00 $53.00 $6,943.00 $53.00 $6,943.00 $54.00 $7,074.00 12 2350.502 TYPE MV 3 NON WEARING COURSE MIXTURE (C) TON 262 $38.00 $9,956.00 $49.00 $12,838.00 $49.00 $12,838.00 $47.00 $12,314.00 13 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GALLON 60 $2.50 $150.00 $5.00 $300.00 $5.00 $300.00 $5.00 $300.00 14 2401.501 STRUCTURAL CONCRETE (1A43) CU YD 83 $225.00 $18,675.00 $310.00 $25,730.00 $350.001 $29,050.00 $220.00 $18,260.00 15 2401.501 STRUCTURAL CONCRETE (3Y43) CU YD 447 $300.00 $134,100.00 $345.00 $154,215.00 $400,001 $178,800.00 $285.00 $127,395.00 16 2401.512 BRIDGE SLAB CONCRETE (3Y36) SQ FT 14700 $17.00 $249,900.00 $8.00 $117,600.00 $9.00 $132,300.00 $9.00 $132,300.00 17 2401.513 TYPE P -1 RAILING CONCRETE (3Y46) LIN FT 462 $60.00 $27,720.00 $38.00 $17,556.00 $45.00 $20,790.00 $54.00 $24,948.00 18 2401.515 SIDEWALK CONCRETE (3Y46) SQ FT 4170 $10.25 $42,742.50 $5.00 $20,850.00 $7.00 $29,190.00 $9.00 $37,530.00 19 2401.541 REINFORCEMENT BARS POUND 5013 $0.70 $3,509.10 $0.85 $4,261.05 $1.00 $5,013.00 $1.00 $5,013.00 20 2401.541 REINFORCEMENT BARS (EPDXY COATED) POUND 134312 $0.90 $120,880.80 $0.85 $114,165.20 $1.00 $134,312.00 $1.00 $134,312.00 21 2401.601 STRUCTURE EXCAVATION LUMP SUM 1 $18,000.00 $18,000.00 $12,000.00 $12,000.00 $12,000.001 $12,000.00 $12,000.00 $12,000.00 22 2401.601 SLOPE PREPARATION LUMP SUM 1 $7,500.00 $7,500.00 $2,500.00 $2,500.00 $3,000.001 $3,000.00 $3,500.00 $3,500.00 23 2402.59 ELASTOMERIC BEARING PAD TYPE 1 EACH 18 $200.00 $3,600.00 $85.00 $1,530.00 $70.001 $1,260.00 $400.00 $7,200.00 24 2402.595 BEARING ASSEMBLY EACH 36 $680.00 $24,480.00 $750.00 $27,000.00 $500.00 $18,000.00 $400.00 $14,400.00 25 2402.603 STRUCTURAL TUBE RAILING WITH FENCE DES T -3 LIN FT 460 $120.00 $55,200.00 $95.001 $43,700.00 $140.00 $64,400.00 $80.00 $36,800.00 26 2404.501 CONCRETE WEARING COURSE (3U17A) SQ FT 13000 $2.00 $26,000.00 $2.00 $26,000.00 $3.35 $43,550.00 $3.85 $50,050.00 27 2405.502 PRESTRESSED CONCRETE BEAMS 36 "MOD LIN FT 1882 $120.00 $225,840.00 $140.00 $263,480.00 $140.00 $263,480.00 $148.00 $278,536.00 28 2405.511 DIAPHRAGMS FOR TYPE 36 "MOD PRESTRESSED BEAMS LIN FT 448 $55.00 $24,640.00 $80.00 $35,840.00 $40.00 $17,920.00 $46.00 $20,608.00 29 2452.507 C -I -P CONCRETE PILING DELIVERED 12" LIN FT 3960 $19.50 $77,220.00 $24.00 $95,040.00 $24.00 $95,040.00 $19.00 $75,240.00 30 2452.508 C -I -P CONCRETE PILING DRIVEN 12" LIN FT 3960 $3.10 $12,276.00 $1.00 $3,960.00 $2.00 $7,920.00 $4.00 $15,840.00 31 2452.519 C -1 -P CONCRETE TEST PILE 70 FT LONG 12" EACH 8 $6,500.00 $52,000.00 $8,500.00 $68,000.00 $5,000.00 $40,000.00 $4,000.00 $32,000.00 32 2452.602 PILE POINTS 12" EACH 74 $50.00 $3,700.00 $250.00 $18,500.00 $150.00 $11,100.00 $125.00 $9,250.00 Page 1 of 4 Item No. Item Units Quantity JUnit Price JTotal Price Unil Pr ce Total Price Unit Price Total Price Unit Price Total Price Project: 01561 -00 - RSMT - Connemara Trail Bridge Engineers Material Table Lunda Construction Co. Minnowa Construction, Inc. Robert R. Schroeder Constr., Inc. 33 2514.501 CONCRETE SLOPE PAVING SQ YD 971 $95.00 $92,245.00 $60.00 $58,260.00 $45.00 $43,695.00 $54.00 $52,434.00 34 2521.501 4" CONCRETE WALK SQ FT 11401 $3.50 $3,990.00 $3.45 $3,933.00. $4.50 $5,130.00 $2.40 $2,736.00 35 2521.604 2" BITUMINOUS PATH SQ YD 187 $13.00 $2,431.00 $12.50 $2,337.50 $22.00 $4,114.00 $6.00 $1,122.00 36 2531.501 CONCRETE CURB & GUTTER DESIGN 8618 LIN FT 410 $11.50 $4,715.00 $13.45 $5,514.50 $14.00 $5,740.001 $16.00 $6,560.00 37 2545.501 ELECTRIC LIGHT SYSTEM LUMP SUM 1 $15,000.00 $15,000.00 $15,230.00 $15,230.00 $16,000.00 $16,000.001 $12,000.00 $12,000.00 38 2545.509 CONDUIT SYSTEM 2" (LIGHTING) LUMP SUM 1 $4,500.00 $4,500.00 $4,836.00 $4,836.00 $5,000.00 $5,000.001 $12,000.00 $12,000.00 39 2545.509 CONDUIT SYSTEM 1 -112" (FUTURE) LUMP SUM 1 $4,200.00 $4,200.00 $3,922.00 $3,922.00 $4,000.00 $4,000.00 $7,000.00 $7,000.00 40 2554.501 ITRAFFIC BARRIER DESIGN SPECIAL LIN FT 50 $30.00 $1,500.00 $37.95 $1,897.50 $38.00 $1,900.00 $38.00 $1,900.00 41 2554.521 ANCHORAGE ASSEMBLY -PLATE BEAM EACH 4 $260.00 $1,040.00 $250.00 $1,000.00 $250.00 $1,000.00 $250.00 $1,000.00 42 2554.523 END TREATMENT - ENERGY ABSORBING TERMINAL EACH 2 $2,750.00 $5,500.00 $2,165.00 $4,330.00 $2,165.00 $4,330.00 $2,250.00 $4,500.00 43 2557.501 WIRE FENCE DESIGN 6OV -9322 LIN FT 300 $32.00 $9,600.00 $19.65 $5,895.00 $23.00 $6,900.00 $23.00 $6,900.00 44 2563.601 TRAFFIC CONTROL LUMP SUM 1 $1,500.00 $1,500.00 $2,000.00 $2,000.00 $2,500.00 $2,500.00 $5,000.00 $5,000.00 45 2563.61 FLAG PERSON HOUR 250 $35.00 $8,750.00 $85.00 $21,250.00 $75.00 $18,750.00 $60.00 $15,000.00 46 2564.603 4" SOLID LINE WHITE -PAINT LIN FT 900 $0.15 $135.00 $0.68 $612.00 $0.28 $252.00 $0.25 $225.00 4 7 2564.603 4" DOUBLE SOLID LINE YELLOW -PAINT LIN FT 450 $0.30 $135.00 $0.84 $378.00 $0.56 $252.00 $0.50 $225.00 48 2564.603 4" SOLID LINE WHITE -EPDXY LIN FT 1100 $0.25 $275.00 $1.20 $1,320.00 $1.20 $1,320.00 $0.50 $550.00 49 2564.603 4" DOUBLE SOLID LINE YELLOW -EPDXY LIN FT 550 $0.60 $330.00 $2.40 $1,320.00 $2.40 $1,320.00 $1.00 $550.00 50 2572.501 TEMPORARY FENCE LIN FT 500 $2.85 $1,425.00 $1.60 $800.00 $1.60 $800.00 $7.50 $3,750.00 51 2573.502 SILT FENCE, TYPE MACHINE SLICED LIN FT 1500 $2.85 $4,275.00 $1.50 $2,250.00 $1.50 $2,250.00 $1.80 $2,700.00 52 2575.501 SEEDING ACRE 13 $1,150.00 $3,795.00 $200.00 $660.00 $200.00 $660.00 $295.00 $973.50 53 2575.502 SEED MIXTURE 25B POUND 165 $7.10 $1,171.50 $24.50 $4,042.501 $25.00 $4,125.00 $20.00 $3,300.00 54 2575.505 SODDING TYPE SALT RESISTANT SQ YD 900 $3.50 $3,150.00 $3.50 $3,150.00 $3.50 $3,150.00 $4.00 $3,600.00 55 2575.511 MULCH MATERIAL TYPE 1 TON 2.92 $110.00 $321.20 $200.00 $584.00 $200.00 $584.00 $295.00 $861.40 56 2575.519 DISK ANCHORING ACRE 1.46 $80.00 $116.80 $250.00 $365.00 $250.00 $365.00 $100.00 $146.00 57 2575.523 EROSION CONTROL BLANKETS CATEGORY 3 SQ YD 8950 $1.75 $15,662.50 $1.20 $10,740.00 $1.20 $10,740.00 $1.30 $11,635.00 58 1 2575.532 ICOMMERCIAL FERTILIZER ANALYSIS 22 -5 -10 IPOUND 990 $0.40 $396.00 $0.30 $297.00 $0.30 $297.00 $0.50 $495.00 Total SCHEDULE A: $1,581,408.60 $1,491,272.45 $1,493,357.00 $1,537,907.20 Total SCHEDULE A: $1,581,408.60 1 $1,491,272.45 $1,493,357.00 $1,537,907.20 Totals for Project 01561 -00 $1,581,408.60 $1,491,272.45 $1,493,357.00 $1,537,907.20 of Estimate for Project 01561 -00 -5.70 % -5.57%1 2.75% Page 2 of 4 Item No. I Item Units Quantity Unit Price Total Price I Unit Price ITotal Price jUnit Price Total Price jUnit Price ITotal Price Project: 01561 -00 - RSMT - Connemara Trail Bridge I Engineers Material Table lRedstone Construction Edward Kraemer & Sons, Inc. I Ames Construction SCHEDULE A 1 - 2 2021.501 MOBILIZATION LUMP SUM 1 $60,000.00 $60,000.00 $69,899.11 $69,899.11 $77,200.00 $77,200.00 $84,000.00 $84,000.00 2104.501 REMOVE CURB AND GUTTER LIN FT 20 $6.50 $130.00 $5.00 $100.00 $10.00 $200.00 $30.00 $600.00 3 2104.505 REMOVE BITUMINOUS PAVEMENT SQ YD 19 $5.00 $95.00 $10.00 $190.00 $10.001 $190.00 $25.00 $475.00 4 2104.511 SAWING CONCRETE PAVEMENT (FULL DEPTH) LIN FT 9 $7.00 $63.00 $10.00 $90.00 $10.00 $90.00 $40.00 5 2104.513 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 84 $4.00 $336.00 $5.00 $420.00 $5.00 $420.00 $360.00 6 2105.501 COMMON EXCAVATION (P) CU YD 1100 $3.50 $3,850.00 $5.50 $6,050.00 $5.00 $5,500.00 $6.00 $12.00 $504.00 $13,200.00 7 2105.522 SELECT GRANULAR BORROW (CV) CU YD 1100 $11.00 $12,100,001 $17.00 $18,700.00 $12.00 $13,200.00 $15.00 $16,500.00 8 2105.523 COMMON BORROW (CV) CU YD 20400 $650 $132,600.00 $6.50 $132,600.00 $7.15 $145,860.00 $5.75 $117,300.00 9 2211.501 AGGREGATE BASE CLASS 5 TON 770 $12.00 $9,240.00 $15.75 $12,127.50 $15.00 $11,550.00 $15.00 $11,550.00 10 2301.553 BRIDGE APPROACH PANELS SQ YD 302.22 $110.00 $33,244.20 $98.86 $29,877.47 $110.00 $33,244.20 $105.00 $31,73110 11 2350.501 TYPE MV 3 WEARING COURSE MIXTURE (C) TON 131 $42.00 $5,502.00 $54.25 $7,106.75 $53.00 $6,943.00 $56.00 $7,336.00 12 2350.502 TYPE MV 3 NON WEARING COURSE MIXTURE (C) TON 262 $38.00 $9,956.00 $47.25 $12,379.50 $49.00 $12,838.00 $52.00 13 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GALLON 60 $2.50 $150.00 $5.00 $300.00 $5.00 $300.00 $10.00 $13,624.00 14 2401.501 STRUCTURAL CONCRETE (tA43) CU YD 83 $225.00 $18,675.00 $319.16 $26,490.28 $425.00 $35,275.00 $425.00 $600.00 $35,275.00 16 2401.501 STRUCTURAL CONCRETE (3Y43) CU YD 447 $300.00 $134,100.00 $398.79 $178,259.13 $450.00 $201,150.00 $525.00 $234,675.00 16 2401.512 BRIDGE SLAB CONCRETE (3Y36) SQ FT 14700 $17.00 $249,900.00 $9.68 $142,296.00 $8.75 $128,625.00 $10.00 $147,000.00 17 2401.513 TYPE P -1 RAILING CONCRETE (3Y46) LIN FT 462 $60.00 $27,720.00 $62.42 $28,838.04 $39.15 $18,087.30 $56.00 $25,872.00 18 2401.515 SIDEWALK CONCRETE (3Y46) SQ FT 4170 $10.25 $42,742.50 $9.87 $41,157.90 $6.00 $25,020.00 $6.25 $26,062.50 1 9 2401.541 REINFORCEMENT BARS POUND 5013 $0.70 $3,509.10 $0.88 $4,411.44 $0.90 $4,511.70 $1.00 $5,013.00 20 2401.541 REINFORCEMENT BARS (EPDXY COATED) POUND 134312 $0.90 $120,880.80 $0.90 $120,880.80 $1.00 $134,312.00 $1.00 $134,312.00 21 22 2401.601 STRUCTURE EXCAVATION LUMP SUM 1 $18,000.00 $18,000.00 $11,688.79 $11,688.79 $12,150.00 $12,150.00 $25,000.00 $25,000.00 23 2401.601 SLOPE PREPARATION LUMP SUM 1 $7,500.00 $7,500.00 $6,937.36 $6,937.36 $1,250.00 $1,250.00 $5,000.00 $5,000.00 2402.59 ELASTOMERIC BEARING PAD TYPE 1 EACH 18 $200.00 $3,600.00 $43.19 $777.42 $100.00 $1,800.00 $60.00 $1,080.00 24 25 2402.595 BEARING ASSEMBLY EACH 36 $680.00 $24,480.00 $452.52 $16,290.72 $550.00 $19,800.00 $455.00 $16,380.00 2402.603 STRUCTURAL TUBE RAILING WITH FENCE DES T -3 LIN FT 460 $120.00 $55,200.00 $128.53 $59,123.80 $125.00 $57,500.00 $130.00 $59,800.00 26 2404.501 CONCRETE WEARING COURSE (3U17A) SQ FT 13000 $2.00 $26,000.00 $3.44 $44,720.00 $3.35 $43,550.00 $3.50 $45,500.00 27 2405.502 PRESTRESSED CONCRETE BEAMS 36 "MOD LIN FT 1882 $120.00 $225,840.001 $128.34 $241,535.88 $131.50 $247,483.00 $130.00 $244,660.00 28 2405.511 DIAPHRAGMS FOR TYPE 36 "MOD PRESTRESSED BEAMS LIN FT 448 $55.00 $24,640.00 $28.41 $12,727.68 $30.00 $13,440.00 $32.00 29 2452.507 C -I -P CONCRETE PILING DELIVERED 12 LIN FT 3960 $19.50 $77,220.00 $21.73 $86,050.80 $32.00 $126,720.00 $25.00 $14,336.00 30 2452.508 C-I-P CONCRETE PILING DRIVEN 12" LIN FT 3960 $3.10 $12,276.00 $1.12 $4,435.20 $1.00 $3,960.00 $1.00 $99,000.00 31 2452.519 C -I -P CONCRETE TEST PILE 70 FT LONG 12" EACH 8 $6,500.00 $52,000.00 $7,030.77 $56,246.16 $5,000.00 $40,000.00 $5,500.00 $3,960.00 $44,000.00 32 2452.602 PILE POINTS 12 " EACH 74 $50.00 $3,700.00 $143.77 $10,638.98 $170.00 $12,580.00 $300.00 $22,200.00 33 2514.501 CONCRETE SLOPE PAVING SQ YO 971 $95.00 $92,245.00 $89.86 $87,254.06 $70.00 $67,970.00 $67.00 $65,057.00 34 2521.501 4" CONCRETE WALK SQ FT 1140 $3.50 $3,990.00 $4.45 $5,073.00 $3.85 $438900 $3.85 $4,389.00 35 2521.604 2" BITUMINOUS PATH SQ YD 187 $13.00 $2,431.00 $19.75 $3,693.25 $18.00 , .$3,366.00 $12.50 $2,337.50 36 2531.501 CONCRETE CURB & GUTTER DESIGN 8618 LIN FT 410 $11.50 $4,715.00 $14.25 $5,842.50 $16.00 $6,560.00 $20.00 $8,200.00 37 2545.501 ELECTRIC LIGHT SYSTEM LUMP SUM 1 $15,000.00 $15,000.00 $16,595.00 $16,595.00 $15,230.00 $15,230.00 $15,500.00 $15,500.00 38 2545.509 CONDUIT SYSTEM 2" (LIGHTING) LUMP SUM 1 $4,500.00 $4,500.00 $9,250.00 $9,250.00 $4,836.00 $4,836.00 $5,000.00 $5,000.00 39 2545.509 CONDUIT SYSTEM 1 -1/2" (FUTURE) LUMP SUM 1 $4,200.00 $4,200.00 $7,100.00 $7,100.00 $3,922.00 $3,922.00 $4,000.00 $4,000.00 40 2554.501 TRAFFIC BARRIER DESIGN SPECIAL LIN FT 50 $30.00 $1,500.00 $37.95 $1,897.50 $37.95 $1,897.50 $40.00 41 2554.521 ANCHORAGE ASSEMBLY -PLATE BEAM EACH 4 $260.00 $1,040.00 $250.00 $1,000.00 $250.00 $1,000.00 $250.00 $2,000.00 42 2554.523 END TREATMENT - ENERGY ABSORBING TERMINAL EACH 2 $2,750.00 $5,500.00 $2,165.00 $4,330.00 $2,165.00 $4,330.00 $2,200.00 $1,000.00 $4,400.00 43 2557.501 WIRE FENCE DESIGN 60V -9322 LIN FT 300 $32.00 $9,600.00 $23.00 $6,900.00 $19.65 $5,895.00 $25.00 $7,500.00 Page 3 of 4 Ilem No. Item Project: 01561 -00 - RSMT - Connemara Trail Bridge Units Quanti 44 2563.601 TRAFFIC CONTROL 45 2563.61 FLAG PERSON LUMP SUM 46 2564.603 4" SOLID LINE WHITE -PAINT HOUR ; 47 2564.603 4" DOUBLE SOLID LINE YELLOW -PAINT LIN FT 48 2564.603 4" SOLID LINE WHITE -EPDXY LIN FT C 49 2564.603 4" DOUBLE SOLID LINE YELLOW -EPDXY LIN FT 11 50 2572.501 TEMPORARY FENCE LIN FT 51 2573.502 SILT FENCE, TYPE MACHINE SLICED LIN FT 5 52 2575.501 SEEDING LIN FT 15 53 2575.502 SEED MIXTURE 25B ACRE 54 2575.505 SODDING TYPE SALT RESISTANT POUND 1 55 2575.511 MULCH MATERIAL TYPE 1 SCI YD 9 56 2575.519 DISK ANCHORING TON 2. 57 2575.523 EROSION CONTROL BLANKETS CATEGORY 3 ACRE 1. 58 2575.532 COMMERCIAL FERTILIZER ANALYSIS 22 -5 SQ YD 89 -10 POUND 9' Total SCHEDULE Total SCHEDULE A: Totals for Project 01561 -00 of Estimate for Project 01561 -00 I hereby certify that this is an exact reproduction of bids received Certified By: = / Registration No. Date: Unit Price ITotal Price Unit Price Total Price Unit Price Total Price Unil Price Total Price Engineers Material Table Redstone Construction $1,500.00 Edward Kraemer &Sons, Inc. Ames Construction $1,500.00 $1.00 $1.00 $1.00 $1.00 $10,000.00 $10,000.00 $35.00 $8,750.00 $100.00 $25,000.00 $50.00 $12,500.00 $51.00 $12,750.00 $0.15 $135.00 $0.68 $612.00 $0.28 $252.00 $2.00 $0.30 $135.00 $1,800.Oc $0.84 $378.00 $0.56 $252.00 $2.00 $0.25 $275.00 $1.20 $1,320.00 $1.20 $900.00 $1,320.00 $0.60 $330.00 $2.40 $2,200.00 $1,320.00 $2.40 $1,320.00 $3.00 $1,650.00 $1 0 $2.85 $1,425.00 $1.60 $800.00 $1.60 $800.00 $2,pp $2.85 $4,275.00 $1,000.00 .5 $2,250.00 $1.50 $2,250.00 $2.00 $1,150.00 $3,795.00 $200.00 $660.00 $3,000.00 $200.00 $660.00 $200.00 $7.10 $ 660 . 00 $1,171.50 $24.50 $4,042.50 $24.50 $4,042.50 $25.00 $4,125.00 $3.50 $3,150.00 $3.50 $3,150.00 $3.50 $3,150.00 $110.00 $321.20 $200.00 $5.00 $4,500.00 $584.00 $200.00 $584.00 $200.00 $584.00' $80.00 $116.80 $250.00 $365.00 $250.00 $365.00 $250.00 $365.00 $1.75 $15,662.50 $1.20 $10,740.00 $1.20 $10,740.00 $1.35 $12,082.50 $0.40 $396.00 $0.30 $297.00 $0.30 $297.00 $0.30 $1,581,408.60 $297.00 $1,583,801.52 $1,592,678.20 $1,662,204.60 $1,581,408.60 $1,592,678.20 $1,662,204.60 $1,583,801.52 $1,581,408.60 $1,583,801.52 $1,592,678.20 $1,662,204.60 0.71 5.11 Page 4 of 4 CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2004 — A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR THE CONNEMARA TRAIL OVERPASS CITY PROJECT NO. 379 BE IT FURTHER RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: 1. All bids on construction of the Connemara Trail Overpass have been received and tabulated. 2. The bid of Lunda Construction Company in the amount of $1,491,272.45 for the construction of said improvements is in accordance with the plans and specifications and advertisement for bids and is the lowest responsible bid and shall be and hereby is accepted. 3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of all successful bidder and the next two lowest bidders shall be retained until a contract has been executed. 5. Award of the bid is contingent on the determination by the City Administrator that all necessary rights -of -entry or easements by deed or dedication have been secured for construction of the improvements. ADOPTED this 7 th day of December, 2004. William H. Droste, Mayor ATTEST: Linda Jentink, City Clerk Motion by: Seconded by: Voted in favor: Voted against: