HomeMy WebLinkAbout6.f. Change Order #1, Meadows of Bloomfield and Meadows of Bloomfield 2nd Addition, Street & Utility Improvements, City Project #351CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION City Council Meeting Date: November 16, 2004 AGENDA ITEM: Change Order #1 — Meadows of Bloomfield and Meadows of Bloomfield AGENDA SECTION: 2nd Addition, Street and Utility Consent Improvements, City Project #351 PREPARED BY: Anthony Aderhold, P. E., Project Engineer AGENdTW#-6 F ATTACHMENTS: Change Order #1 APPROVED BY: RECOMMENDED ACTION: MOTION TO APPROVE CHANGE ORDER #1 FO MEADOWS OF BLOOMFIELD AND MEADOWS OF BLOOMFIELD 2 ND ADDITION STREET AND UTILITY IMPROVEMENTS, CITY PROJECT #351 AND AUTHORIZE NECESSARY SIGNATURES ACTION: BACKGROUND: Change order #1, Meadows of Bloomfield and Meadows of Bloomfield 2 nd Addition Street and Utility Improvements, includes the addition of <$13,704,35> to the original contract amount of $3,785,848.40 for a new total of $3,772,144.05. The work included under Change Order #1 was the deletion of a storm sewer jacking under the Northern Natural Gas pipeline. The contractor was able to perform this installation by open cut method and holding the pipeline with slings. The contractor had asked for some compensation for the additional work to hold the pipeline which was still a cost savings for the City and developer. Other work under Change Order #1 was placing concrete under the rip rap for storm sewer flared end outlets that are 36 inch in diameter or larger from the outlet to the bottom of the pond, and a watermain offset to avoid a conflict with a storm sewer crossing. All work done was either at the request of the developer, Centex Homes, or agreed upon by the contractor, developer and City staff. SUMMARY: Staff requests Council approval of this item. r MEADOWS OF BLOOMFIELD 1 ST AND 2ND ADDITIONS NOVEMBER 16, 2004 STREET AND UTILITY CONSTRUCTION AND APPURTENANT WORK CITY OF ROSEMOUNT, MN CITY PROJECT NO. 351 WSB PROJECT NO. 1563 -00 OWNER: CONTRACTOR: City of Rosemount Ryan Contracting Co. 2875 145th Street West 8700 - 13th Avenue East Rosemount, MN 55068 Shakopee, MN 55379 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: ITEM 275 - OPEN CUT SAVINGS AS OPPOSED TO JACKING FOR LINE ITEM 150. AGREEMENT BETWEEN CITY STAFF, DEVELOPER, AND CONTRACTOR. ITEM 276 - WATERMAIN OFFSET TO AVOID STORM SEWER CONFLICT. ITEM 277 - GROUTED RIP RAP TO POND BOTTOM ON ALL FLARED END INLET STRUCTURES THAT ARE 36 INCHES IN DIAMETER OR GREATER AS REQUESTED BY THE DEVELOPER. ITEM 278 - 36" RC PIPE SEWER DESIGN 3006, CLASS 4000#D -JACKED IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: N/A CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: NET DECREASE OF THIS CHANGE ORDER: CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: $3,785,848.40 ORIGINAL CONTRACT TIME: 7/15/2004 $0.00 NET CHANGE FROM PREVIOUS CHANGE ORDERS: N/A $3,785,848.40 CONTRACT TIME PRIOR TO THIS CHANGE ORDER: 7/15/2004 ($13,704.35) NET INCREASE OF CHANGE ORDER: N/A $3,772,144.05 CONTRACT TIME WITH APPROVED CHANGE ORDERS 7/15/2004 RECOMMENDED BY: APPRO BY. 1 ANTHOKI A. ADERHOLD, P.E. WSB 5 ASSOCIATES, INC. RYAN CONTRACTING CO. ENGINEER CONTRACTOR APPROVED BY: CITY ENGINEER DATE OF COUNCIL ACTION CITY ADMINISTRATOR 1563 -00 CO -1CO -1 MEADOWS OF BLOOMFIELD 1ST AND 2ND ADDITIONS NOVEMBER 16, 2004 STREET AND UTILITY CONSTRUCTION AND APPURTENANT WORK CITY OF ROSEMOUNT, MN CITY PROJECT NO. 351 ADDEDITEMS DELETED ITEMS Extended Item No. Description Unit Quantity Price Amount 278 36" RC PIPE SEWER DESIGN 3006, CLASS 4000#13 - JACKED LIN FT 100 $477.00 $47,700.00 TOTAL DELETED ITEMS CHANGE ORDER NO. 1 $47,700.00 TOTAL ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT ($13,704.35) 1563 -00 CO -1C01 Detail Extended Item No. Description Unit Quantity Price Amount 275 JACKING DELETION FOR OPEN CUT INSTALLATION LUMP SUM 1 $22,730.00 $22,730.00- 276 WATERMAIN OFFSET TO AVOID STORM SEWER CONFLICT LUMP SUM 1 $3,766.00 $3,766.00 277 GROUTED RIP RAP TO POND BOTTOM LUMP SUM 1 $7,499.65 $7,499.65 TOTAL ADDED ITEMS CHANGE ORDER NO. 1 $33,995.65 DELETED ITEMS Extended Item No. Description Unit Quantity Price Amount 278 36" RC PIPE SEWER DESIGN 3006, CLASS 4000#13 - JACKED LIN FT 100 $477.00 $47,700.00 TOTAL DELETED ITEMS CHANGE ORDER NO. 1 $47,700.00 TOTAL ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT ($13,704.35) 1563 -00 CO -1C01 Detail