Loading...
HomeMy WebLinkAbout6.d. Receive Bids/Award Contract - Reflections Street & Utility Improvements, City Project #381CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: September 21, 2004 AGENDA ITEM: Receive Bids /Award Contract - Reflections Street & Utility Improvements, City Project #381 AGENDA SECTION: Consent PREPARED BY: Andrew J. Brotzler, P.E., City Engineer A N l ATTACHMENTS: None APPROVED RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION CEIVING BIDS AND AWARDING CONTRACT FOR REFLECTIONS STREET AND UTILITY IMPROVEMENTS, CITY PROJECT #381. ACTION: ISSUE: Receive bids and award contract for Reflections Street and Utility Improvements project. BACKGROUND: On Monday, September 20,2004, bids will be received and read aloud publicly. The bids will then be reviewed for accuracy before a recommendation can be made. The project includes the construction of streets and utilities within the Reflections development. All costs associated with the project will be funded by the Developer, Contractor Property Developer Company, except for trunk utility oversizing. SUMMARY: The tabulation of bidders, resolution and letter of recommendation to award will be provided at the Council meeting. A L 4 -e..�m CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2004 - A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR THE REFLECTIONS STREET AND UTILITY IMPROVEMENTS CITY PROJECT #381 BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: 1. All bids on construction of the Reflections Street and Utility Improvements are hereby received and tabulated. 2. The bid of Barbarossa and Sons, Inc., in the amount of $2,115,903.65 for the construction of said improvements are in accordance with the plans and specifications and advertisement for bids is the lowest responsible bid and shall be and hereby is accepted. 3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of all successful bidder and the next two lowest bidders shall be retained until a contract has been executed. ADOPTED this 21" day of September, 2004. William H. Droste, Mayor ATTEST: Linda Jentink, City Clerk Motion by: Voted in favor: Voted against:_ Seconded by: _B rI � September 21, 2004 Honorable Mayor and City Council City of Rosemount 2875 —145 Street West Rosemount, MN 55068 Re: Reflections 0 Addition Street and Utility Construction and Appurtenant Work City of Rosemount Project No. 381 WSB Project No. 1565 -01 Dear Mayor and Council Members: Bids were received for the above - referenced project on Monday, September 20, 2004, and were opened and read aloud. A total of six bids were received. The bids were checked for mathematical accuracy and tabulated. The Engineer's Estimate was $2,195,793.50. Please find enclosed the bid tabulation indicating the low bidder as Barbarossa and Sons, Inc., Osseo, Minnesota in the amount of $2,115,903.65. We recommend that the City Council consider these bids and award a contract to Barbarossa and Sons, Inc. based on the results of the bids received. Sincerely, WSB & Associates, Inc. Anthony A. A rhold, P.E. Project Engineer Enclosure cc: Barbarossa and Sons, Inc. srb FAWPWIM1565.0Pwcmmdtn ltr.doc Minneapolis • St. Cloud •.Equal Opportunity Employer 01 PROJECT: Reflections 1 st Addition Street and Utility Construction and Appurtenant Work City of Rosemount Project No. 381 LOCATION: Rosemount, MN WSB PROJECT NO.: 1565 -01 Bids Opened: Monday, September 20, 2004 at 10:00 a.m. I hereby certify that this is a true and correct tabulation of the bids as received on September 20, 2004. Anthony A. AQ11erhold, P.E., Project Engineer Denotes corrected figure FAWPWIM1565-011Exce111565-01 Bid Tab Summary xls Addendum No. 1 Contractor Rec'd. Bid Security Total Bid 1 Barbarossa and Sons, Inc. X X 2 S. J. Louis Construction, Inc. X X 3 4 Three Rivers Construction, Inc. S. R. Weidema, Inc. X X X X , .9 5 Richard Knutson, Inca X X $2,298,227.16 6 Lametti & Sons, Inc. X X , Engineer's Opinion of Cost $2,195,793.50 I hereby certify that this is a true and correct tabulation of the bids as received on September 20, 2004. Anthony A. AQ11erhold, P.E., Project Engineer Denotes corrected figure FAWPWIM1565-011Exce111565-01 Bid Tab Summary xls