HomeMy WebLinkAbout2.a. Pavement Management ProgramCITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR DISCUSSION COMMITTEE OF THE WHOLE: January 14, 2004 AGENDA ITEM: Pavement Management Program AGENDA SECTION: PREPARED BY: _Andrew J. Brotzler, P.E., City Engineer AGENDA NO. Z *A. ATTACHMENTS: None APPROVED BY: Over the past year, Staff in the Engineering Department has been working to prepare a Pavement Management System for the maintenance and replacement of City streets. At this time, Staff would like to present to Council an outline of the proposed Pavement Management System. NOTES: For discussion -only. JTem Z. Potential Funding • Traffic Utility Need New Legislation • Impact Fees Need New Legislation • Franchise Fees for Utilities • Host Fees — Power Plant — Etc. • City Utility Funds Committee of the Whole City of Rosemount Public 41 January 14, 2004 Works /Engineerinig Dept. Funding - Existing • General Tax Levy • Municipal State -Aid • Special Assessments • Sealcoat Escrow for New Developments • SKB User Fees Committee of the Whole City of Rosemount Public 40 January 14, 2004 Works /Engineerinig Dept. c 0 CD ■ L c c c. E 0 U C 0 Cl CL N a� (0) 3 m Z c a 70 OL CL ■ v ■ r- C'7 8303 L303 9303 9303 ti303 £303 3303 L303 0303 6LOZ U }; Q 8103 0 LLOZ 'L 9L03 N O CO .� slot c VLO3 0 C/) Y i CLOZ +� O U� ZLOZ LLOz OLOZ 6003 _N 8002 O > L L003 O � 9003 O O CV s0oz 0) T Voo3 >1 O 69 sielloa cz E cz O U� O O C O C O Co 0 0 0 C C 0 0 C 0 C C 40 co LO O 69 sielloa cz E cz O U� O O O O 0 0 o S C C 0 0 O 69 sielloa cz E cz O U� c 0 U) L � cz c E T 0 'n 0 0 CL E v U CD 0 lid m 0) 0 V Cz m O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O to C C O C C O C O O O C O C C C C O O O O O O O O O O O O O O O O C C C C C C C 0 C C C C C C C C _ _ _ C) r- o CD o LO o o� o C o o" 6q � � 6s 6s � � � U � Q I 0) C E O E c 0) 0 c � oY � 0 WE 0 �o �o O CV N d. E ca E 0 C U� saenoa . c , ®C . . MEEK ME O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O to C C O C C O C O O O C O C C C C O O O O O O O O O O O O O O O O C C C C C C C 0 C C C C C C C C _ _ _ C) r- o CD o LO o o� o C o o" 6q � � 6s 6s � � � U � Q I 0) C E O E c 0) 0 c � oY � 0 WE 0 �o �o O CV N d. E ca E 0 C U� saenoa c O C/) ■ cz C O � a E U Q U a a U T a L1 . NX fC+i- W O 0) 000 Or C L M N O O I3d P814610M a6eJand 8303 L303 9Z0Z 9303 V30Z 6303 3303 2U 0303 6103 8103 L LOZ co 9103 9103 V W3 6103 3103 1103 0103 6003 8003 LOU 9003 9002 VOR M )� y � \'J U_ � O C 0 CD N N S W O Y U� _N O > L O O O CV N � T y --I +-I E Rf E O C U� PCI of 80 Committee of the Whole City of Rosemount Public 36 January 14, 2004 Works /Engineerinig Dept. 0 0 0 C\J C\l 4-0 �—j 0 x 0 (Do '0 > (L) Cq . > C: M uJ 0 cc CL c 41) 4- Q cn CZ cn m •c cz E 0 CL CD C: %A CL C: 0 (j) cz E C Z C: rr C: ,.M %M < vtlucl - -------- ---------- ----- --------- --------- ----- - 63R LO CY) --------- I - ------- ----- ---- ----- --------- ----- - ROZ ---------- - ------- ----- ---- ----- ---------- ----- - L203 ---------- - ------- ----- ---- ----- I --------------- Roz --------- 11 -------- ----- ---- ----- ---------- ----- - 93oz --------- ------- ----- ---- ----- -------------- 1 --------- ------- ----- ---- -- --- -------- ----- - seoz --------- 11 - ------ ----- --------- -------------- Z?03 --------- it - ------ ----- --------- ---------- ----- - G nz ------- ------- ----- --------- ---------- ----- - 0303 - ------- ----- ---- ----- ---------- ----- - 6M C.) --------- i --------------------- --------------- sm C CL --------- -------- ----- ---- ----- ---------- ----- - C: --------- - ------------ ---- ----- ---------- ----- - 9403 0 CD E -------- -------- ----- ---- ----- ---------- ----- 9402 a) co 0 -------- -------- ----- ---- ----- -------- ----- t7LO2: cr w 4— O -------- -------- ----- ---- ----- -------------- s LOZ 0 ------- - -------- ----- ---- -- --- -------- ----- 2102 C) -------- -------- ----- ---- ----- --- ------------ - L lOF --------- ------- ----- --------- ---------- ----- - 0 402 -------- - 6002 --------- ----- ----- --------- ------------ sooz CD 0 --------- -- ------------------- - ---------- - - - Looz CD --------- -- ----- ----- --------- ---------- ----- - 9002: C) --------- -- ----- ----- ---- ----- ---------- ----- - gooe 0 N --------- -- ----------------------------------- t 4— ------------- ---- ----- - cooz E E C 0 I I cz I zooz 4= C� C) CD 0 C) 0 0 C� C� O 0) co r- (D LO 't m cli 13d POILIBIGM GBUJOAV "Ramp —Up" Increasing Budget by 10% Annuall y for 6 Years then level till 2021, then "Ramp -Up" by 20% Budget vs. Backlog Report Ramp -Up Scenario Year Average Weighted PCI Budget Allocated (dollars) Budget Spent (dollars) Unspent (dollars) % Overlay % Reconstruct % Seal Coat Backlog (dollars) 2004 74 $930,000 $930,000 $0 31% 59% 10% $4,497,000 2005 73 $1,125,000 $1,125,000 $0 31% 59% 10% $4,233,080 2006 73 $1,238,000 $1,238,000 $0 31% 59% 10% $4,149,460 2007 73 $1,362,000 $1,362,000 $0 43% 47% 10% $4,604,340 2008 73 $1,498,000 $1,498,000 $0 31% 59% 10% $3,860,590 2009 75 $1,648,000 $1,648,000 $0 61% 29% 10% $3,822,130 2010 79 $1,648,000 $1,648,000 $0 90% 0% 10% $2,950,490 2011 81 $1,648,000 $1,648,000 $0 90% 0% 10% $2,163,950 2012 82 $1,648,000 $1,648,000 $0 83% 0% 17% $1,323,420 2013 81 $1,648,000 $1,648,000 $0 20% 0% 80% $407,650 2014 81 $1,648,000 $1,648,000 $0 56% 0% 44% $49,510 2015 81 $1,648,000 $1,350,560 $297,440 73% 0% 9% $0 2016 80 $1,648,000 $1,318,540 $329,460 67% 0% 13% $0 2017 80 $1,648,000 $1,648,000 $0 50% 0% 50% $621,260 2018 79 $1,648,000 $1,648,000 $0 90% 0% 10% $1,664,900 2019 78 $1,648,000 $1,648,000 $0 59% 0% 41% $1,245,180 2020 77 $1,648,000 $1,648,000 $0 90% 0% 10% $1,810,300 2021 77 $1,977,000 $1,977,000 $0 89% 0% 11% $2,310,000 2022 77 $2,373,000 $2,373,000 $0 90% 0% 10% $3,686,020 2023 79 $2,848,000 $2,848,000 $0 78% 12% 10% $2,464,960 2024 78 $3,417,000 $3,417,000 $0 32% 58% 10% $2,623,9501 2025 80 $4,101,000 $4,101,000 $0 37% 12% 51% $471,550 2026 79 $4,921,000 $4,921,000 $0 10% 80% 10% $2,321,070 2027 79 $5,905,000 $5,905,000 $0 1% 89% 10% $1,486,660 2028 1 80 1 $7,086,000 $7,086,000 $0 1 10% 1 90% 0% $1,759,700 I U I AL Zli52i,bb1,000 �ib /,V6U,UVI Zlib"Lb,VW Committee of the Whole City of Rosemount Public January 14, 2004 Works /Engineerinig Dept. 34 "Ramp —Up" Increasing Budget by 10% Annually for 6 Years then level till 2021, then "Ramp -Up" by 20% Budget vs. Backlog Ramp -Up Budget Scenario $10,000,000 $9,000,000 $8,000,000 $7,000,000 $6,000,000 ;n $5,000,000 $4,000,000 $3,000,000 $2,000,000 $1,000,000 ■ Bacldog o Budget Committee of the Whole City of Rosemount Public 33 January 14, 2004 Works /Engineerinig Dept. $0 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 Year PCI of 74 Committee of the Whole City of Rosemount Public 32 January 14, 2004 Works /Engineerinig Dept. O C\l 0 C\l C: .= 0)-o =3 M� 0.. cr) 0 .2 0 .6.1 cc ■ U) CL CD 45 m CD CL cc LO E E 1 . 6 %M E v rl v C, - -------- ----- ------ --------- ----- ------ --------- -- ROZ C - -- - - - - -- - -- - - - - - - - -- - - - - -- - - ezoz - -- - - - - -- - -- - - - - - - - -- - - - - -- - - - - - - - - - - - LZOZ 9zoz gzoz -- - - - - -- - - -- - - - - - - -- - - - - -- - - -- - - -- -- - - - - -- 6zoz -- - - - - -- - - - - - - - - - -- - - - --- zzoz - - - - - - -- - - - - -- -- 2oz -- - - - - -- - - - - - - - - - - -- - --- -- ozoz -- - - - - -- - 6M 0 = CL :3 C CL - - -- - - - - -- - - -- - - -- -- - - - - -- LIOZ , 0) C: F :3 9 LOZ 0 CD E M 9LOZ 0 VLOZ w Cl) 0 - - - - -- -- CLOZ 0 - - - - - -- - - - - - - - - - - -- - - - - -- - - -- - - -- -- - - - - -- ZLOZ (.5 - - - - - - - -- - - - - -- L wz -- - - - - -- -- Moz -- - - - - -- - - - - - - - - - - - 60OZ -- - - - - -- - - - -- - - - - -- - - -- - - -- -- - - - - -- 90oz CD 0 - -- - - - - -- - - - -- - - - - -- - - - - - - 900e CD C) gooz 0 N CD VON: (D E cz - - - - - - - - - - - - - - -- - - -- - - - - cooz :3 E 0 r Co Moz 0 1� 0 C> C) CD C) CD C') C> 0) OD O 0 0 U) m N 13d PON618M e6eiGAV "Jump -Up" $1.5 Million through 2020 then "Jump -Up" to 3 Million Budget vs. Backlog Report Jump -Up Scenario Year Average Weighted PCI Budget Allocated (dollars) Budget Spent (dollars) Unspent (dollars) % Overlay % Reconstruct % Seal Coat Backlog (dollars) 2004 75 $1,500,000 $1,500,000 $0 20% 60% 20% $3,926,730 2005 76 $1,500,000 $1,500,000 $0 21% 59% 20% $3,272,540 2006 75 $1,500,000 $1,500,000 $0 22% 58% 20% $2,917,090 2007 76 $1,500,000 $1,500,000 $0 34% 46% 20% $3,191,780 2008 78 $1,500,000 $1,500,000 $0 80% 0% 20% $2,537,330 2009 80 $1,500,000 $1,500,000 $0 80% 0% 20% $2,245,690 2010 82 $1,500,000 $1,500,000 $0 80% 0% 20% $1,463,090 2011 84 $1,500,000 $1,500,000 $0 80% 0% 20% $885,660 2012 84 $1,500,000 $1,500,000 $0 43% 0% 57% $468,060 2013 83 $1,500,000 $1,500,000 $0 31% 0% 69% $81,490 2014 81 $1,500,000 $786,130 $713,870 22% 0% 30% $0 2015 78 $1,500,000 $563,220 $936,780 22% 0% 16% $0 2016 77 $1,500,000 $1,500,000 $0 40% 0% 60% $61,070 2017 75 $1,500,000 $1,500,000 $0 51% 0% 49% $564,900 2018 74 $1,500,000 $1,500,000 $0 80% 0% 20% $1,109,890 2019 72 $1,500,000 $1,500,000 $0 80% 0% 20% $3,029,260 2020 75 $3,000,000 $3,000,000 $0 80% 0% 20% $3,289,140 2021 77 $3,000,000 $3,000,000 $0 80% 0% 20% $3,945,150 2022 79 $3,000,000 $3,000,000 $0 80% 0% 20% $3,508,600 2023 78 $3,000,000 $3,000,000 $0 22% 58% 20% $4,602,190 2024 77 $3,000,000 $3,000,000 $0 21% 59% 20% $9,034,210 2025 75 $3,000,000 $3,000,000 $0 20% 60% 20% $10,393,760 2026 75 $3,000,000 $3,000,000 $0 19% 60% 21% $8,695,560 2027 74 $3,000,000 $3,000,000 $0 4% 59% 37% $6,826,480 2028 1 74 1 $3,000,000 $3,000,000 $0 15% 1 60% 1 25% 1 $5,286,940 IUTAL 4ibI,UUU,000 Z�4`J,d4�),d4b 4iI,bbU,Edb4 Committee of the Whole City of Rosemount Public 30 January 14, 2004 Works /Engineerinig Dept. "Jump -Up" $1.5 Million through 2020 then "Jump -Up" to 3 Million Budget vs. Backlog Jump -Up Budget Scenario $16,000,000 $14,000,000 $12,000,000 $10,000,000 ;n `—° $8,000,000 0 0 $6,000,000 $4,000,000 $2,000,000 $0 ■ BacMog ❑ Budget Committee of the Whole City of Rosemount Public 29 January 14, 2004 Works /Engineerinig Dept. 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 Year PCI of 15 - 25 JiEI P� r 5 , I P Committee of the Whole City of Rosemount Public 28 January 14, 2004 Works /Engineerinig Dept. 0 ■ cz V U) V a '0 m 70 m W � c m a� `L w d a �O-Z L C/) x W 000 Or C L M N O O I3d P844 a6eJand 000z 6303 rl- N SZOZ LZOZ 9z03 SZOz bZOZ EE03 ZZOZ L303 oz03 6102 U CL 8103 Q LLOZ .� :3 '� 9102 ct E N 5 LOZ C '� b W 10Z � O C/) Y £LOZ O Mz U LLOZ OLOZ 60OZ 8003 CD 0 L003 CD 9002 O O CV 9002 N T b003 i E cz EON E O C V � ZOOZ Existing Funding Scenario Budget vs. Backlog Report Existing Budget Year Average Weighted PCI Budget Allocated (dollars) Budget Spent (dollars) Unspent (dollars) % Overlay % Reconstruct % Seal Coat Backlog (dollars) 2004 73 $930,000 $930,000 $0 7% 79% 14% $4,496,730 2005 71 $930,000 $930,000 $0 6% 80% 14% $5,283,300 2006 68 $930,000 $930,000 $0 6% 80% 14% $6,490,780 2007 65 $930,000 $930,000 $0 6% 80% 14% $8,217,410 2008 62 $930,000 $930,000 $0 7% 79% 14% $9,112,520 2009 59 $930,000 $930,000 $0 6% 80% 14% $11,760,200 2010 56 $930,000 $930,000 $0 7% 79% 14% $14,628,700 2011 52 $930,000 $930,000 $0 6% 80% 14% $20,210,130 2012 48 $930,000 $930,000 $0 7% 79% 14% $23,913,800 2013 44 $930,000 $930,000 $0 7% 79% 14% $27,406,040 2014 41 $930,000 $930,000 $0 6% 80% 14% $30,234,560 2015 38 $930,000 $930,000 $0 6% 80% 14% $33,156,310 2016 36 $930,000 $930,000 $0 7% 79% 14% $34,878,130 2017 33 $930,000 $930,000 $0 6% 80% 14% $37,726,880 2018 31 $930,000 $930,000 $0 6% 80% 14% $40,059,220 2019 30 $930,000 $930,000 $0 7% 79% 14% $43,507,440 2020 28 $930,000 $930,000 $0 6% 80% 14% $49,704,590 2021 26 $930,000 $930,000 $0 6% 80% 14% $50,954,640 2022 24 $930,000 $892,000 $38,000 6% 80% 10% $58,019,680 2023 22 $930,000 $930,000 $0 6% 80% 14% $60,001,310 2024 21 $930,000 $930,000 $0 6% 80% 14% $61,473,990 2025 20 $930,000 $930,000 $0 7% 79% 14% $64,024,820 2026 19 $930,000 $930,000 $0 6% 80% 14% $66,535,020 2027 19 $930,000 $930,000 $0 6% 80% 14% $69,089,100 2028 19 $930,000 $930,000 $0 6% 80% 1 14% 1 $71,967,990 TOTAL $23,250,000 $23,212,000 $38,000 Committee of the Whole City of Rosemount Public 26 January 14, 2004 Works /Engineerinig Dept. Existing Funding Scenario Budget vs. Backlog Existing Budget $80,000,000 $70,000,000 $60,000,000 $50,000,000 N $40,000,000 0 0 $30,000,000 $20,000,000 $10,000,000 $0 Year ■ Bacldog I E3 Budget Committee of the Whole City of Rosemount Public 25 January 14, 2004 Works /Engineerinig Dept. 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 Current Funding • Crack Sealing • Sealcoat • Structural Overlays • Reconstructs • Total $35,000 $135,000 $50,000 $ 750 , 000 $970,000 Committee of the Whole City of Rosemount Public 24 January 14, 2004 Works /Engineerinig Dept. Proposed Average PCI Goal Try and maintain all pavement between a PCI of 75-85 Committee of the Whole City of Rosemount Public 23 January 14, 2004 Works /Engineerinig Dept. Street with 20+ PCI Committee of the Whole City of Rosemount Public 22 January 14, 2004 Works /Engineerinig Dept. Street with 30+ PCI Committee of the Whole City of Rosemount Public 21 January 14, 2004 Works /Engineerinig Dept. Street with 40+ PCI Committee of the Whole City of Rosemount Public 20 January 14, 2004 Works /Engineerinig Dept. Street with 50+ PCI Committee of the Whole City of Rosemount Public 19 January 14, 2004 Works /Engineerinig Dept. Street with 60+ PCI Committee of the Whole City of Rosemount Public 18 January 14, 2004 Works /Engineerinig Dept. Street with 70+ PCI Committee of the Whole City of Rosemount Public 17 January 14, 2004 Works /Engineerinig Dept. �.� I � I •,� V I I Ili II d r J ,, I�k7" ,III I .NI N ` w: IN INI I,up i 1 N I 4 4N I 6 v r f I f 1 T Y •,.,,.,.v ' " "•a4"'"'., Lr.� • Im,.y,r.�l. '"".� , I • 'r I �� I 1 I II 4 ` r "F 5 II;, ,III ',• M I I 1 1 4 1 ii , Y t 1 I I 1 I% r I I I VI r ' I, I ":i, A �I I, 4 h IY I"5�ry I LI I�F y r 1 J 4 FII IINNNH 1 I l P r , a l i4 9 J h p J III kl I N �I tiP I mf'�I I qa l2 W N I��:4 F Nlal I4 4 I I. p I II tsar 1 h l l Y 4 11 1 0' {.I r I,.hl 4 Y I . "1 II Y a I Committee of the Whole City of Rosemount Public 17 January 14, 2004 Works /Engineerinig Dept. Street with 80+ PCI Committee of the Whole City of Rosemount Public 16 January 14, 2004 Works /Engineerinig Dept. Street with 90+ PCI Committee of the Whole City of Rosemount Public 15 January 14, 2004 Works /Engineerinig Dept. Street with 100 PCI p q - Ioa s0 7 r -'�Yu ,...r,. r ¢ ill Committee of the Whole City of Rosemount Public 14 January 14, 2004 Works /Engineerinig Dept. Current Average PCI • PCI Average is 74 Committee of the Whole City of Rosemount Public 13 January 14, 2004 Works /Engineerinig Dept. 2004 Reconstruction Project Area Showing PCI Committee of the Whole January 14, 2004 City of Rosemount Public Works /Engineerinig Dept. 12 Pavement Condition Index (PCI) Map 2002 Ratings and December 15, 2003 I` Aerial Photography 500 0 500 1000 Feet Rosemount, MN City Map with PCI'S Committee of the Whole City of Rosemount Public 11 January 14, 2004 Works /Engineerinig Dept. Pavement Condition Index (PCI) Map 2002 Ratings and December 15, 2003 Aerial Photography Rosemount, MN `�_ z000 o z000 4000 Feet Miles Added Per Year 27.37 Miles Since 1994 • 2003 3.65 Miles • 2002 3.82 Miles • 2001 2.36 Miles • 2000 2.95 Miles • 1999 2.34 Miles • 1998 2.83 Miles • 1997 1.62 Miles • 1996 0.64 Miles • 1995 1.65 Miles • 1994 5.51 Miles (includes County Turnback) Committee of the Whole City of Rosemount Public 10 January 14, 2004 Works /Engineerinig Dept. Current Street System • 98.03 Miles of Streets — 14.66 Miles of Gravel — 13.78 Miles of Rural Paved —69.59 Miles of Urban Paved Committee of the Whole City of Rosemount Public 9 January 14, 2004 Works /Engineerinig Dept. PCI Ranges • PCI of 100 to 91 • PCI of 90 to 61 • PCI of 60 to 40 Do Nothing Seal Coat Overlay • PCI of 39 to 0 Reconstruct * Strategies can vary 5± points Committee of the Whole City of Rosemount Public 8 January 14, 2004 Works /Engineerinig Dept. Life of the Pavement ICON Parameters for Budget Analysis Projections PL' ---- - - - - -- - - - - -- 100 I I 1 80 1 , I ICON reads your section history information (survey & project) and sets counters History maximum number of applications allowed time inve"I sealcoat �— between �� -� - - - -- --- - - - - -- - -- strategy - -- --------- - - -- - -- - - - -- - -- - -- sealcoat application r sealco Seale o ------ _________ ________________ .Ver 8y OVeflayf pp b � 2 • • sealcost sealcoaR ` 40 ----------------------- % ---------------------------------------- - - - - -- - - - -- 20 0 e --------------------------------------------------------------------------------------- Routine Maintenance Only 0 A Start of Plan 20 d0 Pavement Age (Years) 60 Cppy.gn Qo Pin T—h-kW C­-j. Committee of the Whole City of Rosemount Public 6 January 14, 2004 Works /Engineerinig Dept. Rating System & PCI • Rating System = Pavement Condition Index (PCI) — Numerical Score (0 -100) based on the Visible Pavement Distress (cracks, patches, rutting, etc.) • Obtained from Field Inspection of Every Street by a Technician. Approximately 27.5 Miles of Streets or 1/3 of the Paved Streets are Rated Every Year. — Measures Type, Severity and Quantity of Distress • Street Data Entered into the Database — Program computes PCI number, which is the Comparative Rating to a New Pavement (100) for each segment of roadway Committee of the Whole City of Rosemount Public 7 January 14, 2004 Works /Engineerinig Dept. Pavement Management System City of Rosemount Committee of the Whole City of Rosemount Public January 14, 2004 Works /Engineerinig Dept. Purpose • Manage, not just Maintain Pavements • Extend Pavement Life • Enhance System -Wide Performance • Do It In a Cost Effective and Efficient Way Committee of the Whole City of Rosemount Public 2 January 14, 2004 Works /Engineerinig Dept. What Is The Pavement Management System • Field Work, "Rating" the Streets • A Computer Database, Store and Sort Collected Data • An Analysis Program, To Evaluate Strategies and Suggest Cost Effective Projects to Maintain Street Conditions Committee of the Whole City of Rosemount Public 3 January 14, 2004 Works /Engineerinig Dept. Design Life of the Pavement • With Local Strategies — Patching, Crack Sealing Pavement Life is 25 Years Committee of the Whole City of Rosemount Public 4 January 14, 2004 Works /Engineerinig Dept. Design Life of the Pavement With Global Strategies - Sealcoat at 3, 9 21, 28, 41, 48 Years - Overlay, between 16 -18, 36 -38 Years - Reconstruct, Approx. 60 Years Committee of the Whole City of Rosemount Public 5 January 14, 2004 Works /Engineerinig Dept.