Loading...
HomeMy WebLinkAbout6.f. Receive Bids/Award Contract-Meadows of Bloomfield and Meadows of Bloomfield 2nd Addition Street & Utility Improvements. Ciry Project #351- 6u!laaw 1!ouno0 eqj Ie pap!noid aq II!M paeme of uo!lepuawwooei }o a9:491 pue uoiInlosaa `siapp!q jo uo!jejngej ayl 3.t =►' ', TIITiT -� 'sIsoo 6 UIZISJ9AO �4!j qn � unal. aol Ideoxe `sawOH x `jadolanaa eqj Aq popunj aq II!M joefoad eqj qj!m pale!oosse s1soo IId *Iuewdolanap uo!I!ppy p p191Jw00181 snnopeM pue pla!jwoo18 jo smopeaW eqj uigjIm seipIgn pue slaaa #s jo uopnalsuod eqj sepnloui joefoid slyl apew aq ueo uo!�epuawwooaa e aaojaq Aoeinooe aol pemeiAGJ 6ulaq aae sp!q aul "Alo!Ignd pnole peaa pue pan1909J Ojam joefoid peouaaajaa eqj aol sp!q (g) Oulu `V00Z 1 9Z AeIN `AepsoupeM u0 :aNnomomova . joefoid Juawanoidwl Aimin pue i9eiis uoli!ppv p „ Z Plallwool8 jo smopeaVI pue pla!jwoo18 jo smopeeIN jol loeilruoo pieme pue sp!q an!aoaU :3nSSl : N 0113V 69C# 103f'02id Ali0 `S1N3W3A0?JdWI JIJ..nun aNV 13MAiS N011lda`d 0 NZ C11313W0018 30 SM0GV3W (INV (]131dW0018 30 SM0GV3W 2JOd 10` IN00 JNI(RIVMV (INV S018 JNIA130321 NOIinios 21 V 1d0GV 01 NOUOW :N011av a3aN3WW03321 :A8 a3AONddtf •auoN :S1N3WH3Vlltf a99u!6u3 40 "3.d `a9lzl0a8 T MOJPuy :As a3NVd3bd �9C# 139foad AI!0 `s}uawanoaduwl Aiwin juesuo0 18 199a }S uo!l.!ppd p„ Z Plallwoo1810 Smop pue plallwool8 :NO1133S VaN39V 10 snnopealN- loeal.uoo paenMy/sp!8 anlaoa�l :W3J.1 vaN39V t ` 1 aun f :31Va ON1133W 1IaNnOa Alta N011ad 110=1 Amvwwns 3A11na3X3 1NnOW3sou =iO Alla CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2004 — A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR MEADOWS OF BLOOMFIELD AND MEADOWS OF BLOOMFIELD 2 ADDITION STREET AND UTILITY IMPROVEMENTS CITY PROJECT #351 BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: 1. All bids on construction of the Meadows of Bloomfield and Meadows of Bloomfield 2" Addition Street and Utility Improvements are hereby received and tabulated. 2. The bid of Ryan Contracting Company, Inc.., in the amount of $3,785,848.40 for the construction of said improvements are in accordance with the plans and specifications and advertisement for bids is the lowest responsible bid and shall be and hereby is accepted. 3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of all successful bidder and the next two lowest bidders shall be retained, until a contract has been executed. ADOPTED this lst day of June, 2004. William H. Droste, Mayor ATTEST: Linda Jentink, City Clerk Motion by: Seconded by: Voted in favor: Voted against: •. 6 JUN -01 -2004 13:40 WSB & ASSOCIATES INC. 7632877170 P.02/03 W SB & Associates Inc. June 1, 2004 . ' �ti;YF .: G •. ' r 'a . �.: 4950-J Ojson' ' Memorial: Highway Suite 30 -:" cr,'• , 5. ' :AAinnesata'• ;'�'n � 5s4Z2• :• ,• '`: sti �;,:.:•• ?. 763! FAX Honorable Mayor and City Council City of Rosemount 2875 —145 Street West Rosemount, MN 55068 Re: Meadows of ]Bloomfield 1 and 2" Additions City of Rosemount Project No. 351 WSB Project No. 1563 -00 Dear Mayor and Council Members; Bids were received for the above- referenced project on Wednesday, May 26, 2004, and were opened and read aloud. A total of nine bids were received. The bids were checked for mathematical accuracy and tabulated. The Engineer's Estimate was $4,510,632.85. Please find enclosed the bid tabulation indicating the low bidder as Ryan Contracting Company, Shakopee, Minnesota in the amount of $3,785,$4$.40. We recommend that the City Council consider these bids and award a contract to Ryan Contracting Company based on the results of the bids received. Sincerely, WSB & Associates, Ins Mark A. Erichson, P.E. Project Manager Enclosure Co. Ryan Contracting Company sb/j 5 AAWPKM15dJ -00 WMMdtR hndoc MlllnEapOlIS • St. [loud FrnFnl C'lnnnrt�mifir Gmnfnver JUN -01 -2004 13:40 WSB & ASSOCIATES INC. 7632877170 P.03iO3 PROJECT: Meadows of Bloomfield 1st and 2nd Additions City of Rosemount, MN , City Project No. 351 LOCATION: Rosemount, MN WS13 PROJECT NO($).: 1563 -00 BIDS OPENED: Wednesday, May 26, 2004 at 10:30 a.m. Contractor Addendum 1 Bid Recurilz Total Bid 1 Ryan ContraoUng Company X X $3,765,848.40 2 Contractors Edge, Inc. X X $3,825,007.71 3 Richard Knutson, Inc. X X $4,030,303.69 4 i=riedges Contracting Co., LLC X X $4,133,297.73 5 A -1 Excavating, Inc. X K $4,133,386.47 6 Barbarossa & Sons, Inc. X X $4,187,856.75 7 Northdale Construction Co., Inc. X X $4,273,681.43 8 Three Rivers Construction X X $4,316,572.07 9 Burschville Construction, Inc. No X $4,425,628.89 Engineer's Opinion of Cost $4,510,632.85 I hereby certify that this is a true and correct tabulation. of the bids as received on May 26, 2004. Mark A ErIcHbon, P.E., Project Manager ..— DENO'T'ES CORRECTED FIGURE Rage i of S7 F Q0MWeA1563 -00 Rki rah we TOTAL P.03