Loading...
HomeMy WebLinkAbout2.a MCES Empire Outfall/Stormwater AgreementCITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR DISCUSSION CITY COUNCIL WORK SESSION: June 23, 2004 AGENDA ITEM: MCES Empire OutfalllStormwater Agreement AGENDA SECTION: PREPARED BY: Andrew J. Brotzler, P.E., City Enginee AGENDA NO. 2 , ATTACHMENTS: None APPROVED BY: NOTES: For discussion only. As you are aware, the City has been working with MCES over the past two years to allow for the introduction of City,stormwater into the proposed MCES treated effluent outfall pipe from the Empire WWTP. The City's Comprehensive Stormwater Management Plan identifies a future outlet to the Mississippi River along the same general alignment. The combination of stormwater flow with the MCES outfall pipe has significant advantages which include timing, cost savings and reduced environmental impacts. At this point, City staff has met with MCES staff on two occasions to review a draft agreement between MCES and the City for the combined system. Based on a recent meeting, MCES is working to revise the agreement and it is anticipated that a revised agreement will be provided by the time of the work session. Staff would like to review with Council the draft agreement and the terms of the agreement. Depending on the outcome of this review and discussion, a final agreement could be brought to Council at a future regular meeting for consideration and approval.