Loading...
HomeMy WebLinkAbout6.f. Receive Bids/Award Contract - Eastside Watermain Phase 2 Improvements, City Project #345CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: June 3, 2003 AGENDA ITEM: Receive Bids /Award Contract — Eastside Watermain Phase 2 Improvements, City Project #345 AGENDA SECTION: Consent PREPARED BY: Andrew J. Brotzler, P.E., City Engineer 7�� AGEN" T M. 7# F ATTACHMENTS: None APPROVED BY: On Friday, May 30, 2003, bids will be received for the above - referenced project. A tabulation of the bids received and a recommendation letter will be provided at the City Council meeting. RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION RECEIVING THE BIDS AND AWARDING THE CONTRACT FOR THE EASTSIDE WATERMAIN PHASE 2 IMPROVEMENTS, CITY PROJECT #345. COUNCIL ACTION: 2 CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2003 — A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR THE EAST SIDE WATERMAIN, PHASE 2 IMPROVEMENTS CITY PROJECT NO. 345 BE IT FURTHER RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: All bids on construction of the East Side Watermain, Phase 2 Improvements have been received and tabulated. 2. The bid of Three Rivers Construction in the amount of $1,022,089.80 for the construction of said improvements is in accordance with the plans and specifications and advertisement for bids and is the lowest responsible bid and shall be and hereby is accepted. 3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of all successful bidder and the next two lowest bidders shall be retained until a contract has been executed. 5. Award of the bid is contingent on the determination by the City Administrator that all necessary rights -of -entry or easements by deed or dedication have been secured for construction of the improvements. ADOPTED this 3 rd day of June, 2003. William H. Droste, Mayor ATTEST: Linda Jentink, City Clerk Motion by: Seconded by: Voted in favor: Voted against: JUN -03 -2003 13:27 WSB & ASSOCIATES INC. 7632877170 P.02i09 '°➢'Qta �Y�► noo-zp >lwlMdM� �'�nu�uw j n}iunp0000 juno3 • pnop ,5 spodl?auuiyv Xb=f poGl LY9 £9L o0w. 6b5•£9L zztsis 23o5aUuIW sijod�auury�.�l qs rtaMy�= euawavy UO5�0.051.ti •ouI `U0113MIsu03 s -1anrI aa-1u,L :oo ,X aznsoloug iaau�ug �oafoid" ;i •a'd `uo .V X .mw rJ} ,x i •�u j 'saPPosSV T 9SAA `�iazaauts panlaaaz spjq aga jo sllnsaa agi uo poseq •ouI `uopon4suoD s oAr 00-141, oa ao?Auoo r p-mmu pur sp!q osagp ioplsuoo pounoo 9ito oql wqi puatuaroow aM '08'680`ZZO`i$ ;o lunoun; age at vlosauurIN `pu loa TL Z °•ouj `uouonjlsuoz) slant?{ aaxq,I, sg aapptq Mot alt; �uAgo uorlvingm piq oqj posojoua pug osm�d •pojujngm puu bmmooe IgogEUuagaguz IN paxoago aiaM sp!q aU •panu23W alaM sp!q anp Jo Itnoa y •pnois pua-1 pug pauado wOA% Pau `£OOZ `0£ XgPq ` , CgPud uo 132foid paouaiaja .l-anog at{l io,I panraoa.r at spilt :siaq=W jtounoD puv toAW maQ 00 - ZOV T '()N l=foud aSAA St 'oN imfoad junouuosog jo Alto (pcg -ate )TaoAk luguo:Pnddv pug II osBgd umUUojoAj optsasuq :alt L60 -99055 MW `lunouuasox lsaAi aaa4S q ,St,I — 9L8Z xunoutasoX jo AjjD Iiounoo Xlto pue -1 AuW 21gjouoH £00Z `£ aun, f f •auI •a��a�?osa'Y 3P i PROJECT: Eastside Watermain Phase II and Appurtenant Work (RE -BID) City of Rosemount Project No. 345 LOCATION: Rosemount, MN WSS PROJECT NO(S).: 1402 -00 - Bids Opened: Friday, May 30 2003,10:00 a.m. Engineer's Opinion of Cost $1,199,910.00 I hereby certify that this is a true and correct tabulation of the bids as received on May 30, 2003. Erlchson, P.E., Project .* Denotes corrected figure nN T qq I H T -)nggH 'R 9qM J.7 - CT S n m7 -cn -Nn r Contractor Addendums Rec'd. Bid Securft. Total Bid 1 Three Rivers Construction, Inc. X X $1,022,089.80 2 Utility Systems of America, Inc. X X $1,049,490.50 3 Heselton Construction, LLC K X $1,110,822.00 4 Burschville Construction, Inc. X X $1,155,797,50 5 Northdale Construction Company, Inc. X X $1,179,104.60 Engineer's Opinion of Cost $1,199,910.00 I hereby certify that this is a true and correct tabulation of the bids as received on May 30, 2003. Erlchson, P.E., Project .* Denotes corrected figure nN T qq I H T -)nggH 'R 9qM J.7 - CT S n m7 -cn -Nn r